Detailed Design Review Friday, February 20 th, 2009 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453.

Slides:



Advertisements
Similar presentations
eQuest Quick Energy Simulation Tool
Advertisements

PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Energy Performance Contracting November 3, 2009 Performance Contracting December 11, 2009.
ASSESS TARGET DELIVER MEASURE Understanding Building Energy Audits Joe Hofstetter P.E., CEM, LEED AP Karpinski Engineering.
S T A T E O F C A L I F O R N I A The Department of General Services Grid Neutral Schools Division of the State Architect, Department of General Services,
COMMERCIAL BUILDING ENERGY AUDITS PRESENTATION
Guilford County Schools ENERGY MASTER PLAN for School Facilities July 25, 2008 Facilities Planning and Construction Department Maintenance Department.
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
Final Presentation MSDII Monday, May 18 th, 2009 Customer: FSNM, Debbie Conway Guide: Brian Thorn P09453.
Telecom Lifecycle Management Solutions for Sales Partners.
Dr. Brian Thorn (Faculty Guide), Debbie Conway (FSNM Superintendent, Customer) Team [Picture Order]: Robert Hudson (ME), Mauricio Pommier (IE), Kyle Mininni.
Fort Stanwix National Monument Energy Audit
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
WIND POWER ASSESSMENT Wind & Energy Efficiency BJORN WESPESTAD RYAN WATKINS.
Chapter 8 Integrated Project
Time and Cost Estimation
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
Workshop on Climate Change Issues jointly organized by KEMCO, NREL and CONAE 1 st December, 2003, Milan, Italy Role of ESCOs in reducing GHG emission.
Michael S. Zachowski, Robert D. Walla Astrix Technology Group 1090 King Georges Post Rd Edison, NJ A Successful Approach to a LIMS Upgrade In A Public.
Energy Audits for Water and Wastewater Utilities US EPA Region 1 New England MA DEP-DOER-EOEEA.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Design Review Monday, January 19 th, 2009 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453.
Detailed Design Review Friday, February 13 th, 2009 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453.
Genesis Solar Module Brochure ™
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2A: KEEPS.
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
Background Established by law in 2008 via the Clean and Affordable Energy Act. District Department of the Environment (DDOE) oversees the contract. The.
Managing Operational Energy in Buildings
Solar Energy Services: Delivering Cost Effective Solar Power March 18, 2004 Claire Broido SunEdison, LLC (443) 226.
Options for Financing Small CHP Systems Barry Sanders, AmericanDG.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
National Inter-Ministerial Dialogue on Climate Change Bay Gardens Hotel Castries, saint Lucia Date, 2009 Energy Sector By Bishnu Tulsie and Judith Ephraim.
Phoenix Convention Center Phoenix, Arizona A Review of the Current DOE IDIQ Track 5: Project Financing Session 3: ESPC Large and Small: The Basics of ESPC.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Femp.energy.gov 1 US DOE Perspective on Deep Energy Retrofits Cyrus Nasseri US Department of Energy Annex 61 Technical Day April 13, 2015.
PRODUCT LOCATOR PresentedBy Richard Raehl November 13, 2001.
Phoenix Convention Center Phoenix, Arizona Solution Showcase GSA’s NDER Program: Doubling the Energy Savings from Financed Projects Kevin Vaughn Schneider.
Residential Survey. Survey Objectives Develop a more accurate algorithm to predict the presence and use of electric heat for residential customers. Algorithm.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
National Action Plan for Energy Efficiency eeactionplan The Role of Energy Efficiency in Utility Energy Planning Snuller Price Partner Energy.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
Business Consulting Services Engagement Proposal & Letter of Agreement Project Management Timelines/GANNT Chart.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
HAZARDOUS WASTE ($) MINIMIZATION TABLE 4 TEAM Tom Finley Mitch Campbell Melenda Powers Doris Reid Drew Jacobs.
Phoenix Convention Center Phoenix, Arizona. Energy Exchange : Federal Sustainability for the Next Decade Energy Efficiency, then Renewable Energy (EERE)
Putting the U in Community Solar Creating a Local, Meaningful University Offset Program Myron Willson, U of U Sustainability Resource Center Director Stephanie.
Energy Project M&V: Reports that Add Value October 27, 2015.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Week 1: Project Overview Customer: Debbie Conway Guide: Brian Thorn P09453.
Commercial PACE Project Development Presenter: Mike Bahr CEO ReNewAll PACE Nation Summit March 1, 2016.
Charlie Conner, Project Manager Performance Contract Energy Conservation Measures September 30, 2013.
Town of Woodbridge Beecher Road School Infrastructure & Energy Upgrade Presentation to Board of Education December 17 th, 2012 AKF John B. Rice, PE, LEED.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Glassex 2008 Energy Savings Example for Solar Control Film Dave Cox – 3M Europe 3M Building and Commercial Services.
Fort Stanwix National Monument Energy Audit
Fort Stanwix National Monument Energy Audit Contract
Gary Nower – Wilfrid Laurier University Edward Ng – EY
Energy Saving Bureau Industrial energy audits in coherence with Directive on the promotion of end-use efficiency and energy services.
Fort Stanwix National Monument Energy Audit
Affordable Energy Production from Renewable Fuel
Tool Lending Library Program evaluation
Developing and Issuing the RFP
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Presentation transcript:

Detailed Design Review Friday, February 20 th, 2009 Customer: FSNM, contact: Debbie Conway Guide: Brian Thorn P09453

Project Description

Customer Needs Rational for Customer Needs based on: Project readiness packet December 2 nd phone interview with FSNM – Debbie Conway December 13 th onsite visit with Debbie and Todd Key statement: reduce current total cost of energy at FSNM to offset the impact of potential ‘green’ energy opportunities and conservation measures

Budget Update Modeling Software - $0 Free download from DOE Travel – 2 onsite visits 1 st visit: 1 car R/T, no meals 2 nd visit: 2 cars R/T, meals MSD2 Direct Costs Renewable demo supplies

MSD1 Project Task Status Objective/TaskStatusComment Customer needs & Project Plan (including Specs Contract) CompleteDocuments posted on EDGE Data Collection CompleteData & documents collected and processed, add’l may be needed On-site Energy Assessment Complete1 st : Saturday - 12/13/08 2 nd : Friday – 1/23/09 Utility Bill Analysis CompleteEnergy Use Profile, baseline consumption, system consumption, EUI Building Envelope Analysis CompleteEnergy loss/year through doors, windows & walls at Willett Center Energy Conservation Measures (ECMs) In progressPotential long & short term opportunities generated, derive more from model Energy savings – consumption, $ - and implementation plan in progress Renewable energy demo plan & scope CompleteNon-grid tied Roof Mounted AC PV system with data logging PV model system components & integration In progressBaseline quote inclusive of all required components, gathering additional quotes for price comparison, system implementation plan in progress Energy Service Company (ESCO) review In progressGenerated ESCO grading, savings & survey to evaluate energy distributors, currently 8 potential options available Software simulation model – eQuest [Free – DOE] In progressMultiple options considered, purchase started, wouldn’t sell to US - eQuest recommended, current baseline model created ~10% electric & ~15% gas error

MSD2 Project Tasks/Objectives Objective/TaskComment Software simulation model – eQuest [Free – DOE] Multiple options considered, purchase started, wouldn’t sell to US - eQuest recommended, current baseline model created ~10% electric & ~15% gas error Energy Conservation Measures (ECMs) impact assessment Potential long & short term opportunities generated, derive more from model Energy savings – consumption, $ - and implementation plan in progress Economic Assessment of ECMs Assessment of ECMs costs, direct & indirect, return on investment (ROI) and payback period. PV renewable demo design, build & deliver drawings, proof-of-concept, functional assessment, purchase materials, build, focus groups, implementation plan Renewable demo maintenance and trouble shoot guide Energy Service Company (ESCO) review Generated ESCO grading, savings & survey to evaluate energy distributors, currently 8 potential options available Administrative MSD2 tasks Project poster, reviews, as per MSD2 syllabus Final Energy Assessment Report Detailed report culminating all energy assessment methods and findings

Moving Forward - Spring Quarter Order Solar System Wk 11 [Winter Quarter] Determine energy savings per ECM with detailed breakdown Economic Analysis Energy Assessment Report Install Solar System Installation, maintenance, test plan

Risks Robustness of renewable demo Lead time on Solar demo parts Balancing education and entertainment aspects Detailed ECM impacts eQuest model assumptions Funding Proximity to FSNM