What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory MICO March 16, 2009.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
MICE Commissioning Issues Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
MICE Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
1 Hall & Beamline Installation Richard Apsimon, Andy Nichols, Willie Spensley MICE Collaboration Meeting, th Feb 2008.
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
UKNF/MICE PSAG, 3/5/11 Spectrometer solenoids: –Repair plan still ‘in approval’, already two months late –Workshop/mini review at LBNL 10 th /11 th May.
MOM Report Galina Vankova RAL, MICE Video Conference.
Project manager report paul drumm CM16 October 2006.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MOM Report Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting February.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE Operations Scenario Run 1
MICE CM31 Schedule summary
Controls & Monitoring in MICE
Presentation transcript:

What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO Meeting February 7, 2008

MICO Meeting-Zisman2 Introduction MICE Run 1 covers ISIS operating period from February 5 through March 13, 2008 We have made considerable progress —we need to maintain our focus if we are to capitalize on this effort We will not get EVERYTHING done in the remaining time —how do we decide what is most critical?

February 7, 2008MICO Meeting-Zisman3 Proposed Goal (1) Critical “deliverable”: get beam to the end of the DSA —this requires many pieces to fall into place in a short time o target 2 must be installed at RAL and pulsing correctly o target 1 must be allowed to pulse in ISIS –requires permission to do some testing during the ISIS user run  not a given, but we must get fully ready for this to happen –a synchrotron access is needed to open gate valve o magnet power supplies must be operable –requires completion of all cabling (magnets, mains, interlocks)  and certification that supplies are usable  which means interlocks tested (requires a short access to synchrotron vault) –requires availability of water (Q4, Q5, Q6 not connected yet)  ideally, with flow switches operable o DAQ + at least one detector must be available to record particles —what level of PPS is needed for initial operation?

February 7, 2008MICO Meeting-Zisman4 Proposed Goal (2) —there are other items “nice to have” o these would improve running, but would not necessarily hold us off o examples: –network connection to power supplies for readout and remote control –availability of Q1 power supply (have optics solution for “doublet”) –availability of CKOV and TOF0  with properly aligned stand —availability of MICE water is an issue o there is a technical alternative, but there may not be a political alternative —question of ISIS interlocks is also an issue o we have discussed an interim technical solution to get us on the air –requires some modifications of existing ISIS circuitry to work with MICE  known for a while, but not implemented

February 7, 2008MICO Meeting-Zisman5 (Almost) Final Remarks We do not control all aspects of our own fate —but those we do control need to get done expeditiously We must do some things in parallel —e.g., ordering cables prior to having final placement of switch boxes We must focus on the key items and avoid getting distracted At the end of this running period we must at the least be READY TO RUN

February 7, 2008MICO Meeting-Zisman6 MICO Meeting Organization Propose change in how this meeting operates in the future —Technical Coordinator will present a summary each week of upcoming milestones and action items over the next few-month period —status reports must focus on progress towards these milestones o or reasons why they are not being met, plus proposed remedial action —“show and tell” presentations should be reserved for video conferences and review committees, not MICO To succeed, we need to focus on managing the project— and our technical progress—against milestones —MICO meeting will be a tool to this end —in particular, action items must include a person responsible and a date for completion o these will be monitored and tracked weekly Meeting will be kept short (takes a lot of discipline)

February 7, 2008MICO Meeting-Zisman7 Sample Agenda Action item and milestone summary [Nichols] ISIS issues [Rogers...as needed] Target 1 & 2 [Booth] Cryogenics (decay solenoid, Linde plant, LH 2 ) [Courthold] Hall infrastructure (mech., electr. & RF) [Hayler] PPS [Alexander] Controls [Martlew/Oates] DAQ [Graulich] Spectrometer Solenoids + RFCC module [Virostek] AFC module (incl. absorber) [Lau] Detectors (beam line + MICE) [tbd] Commissioning needs [MOM]  5 min. each; if nothing new to report, simply indicate so