I-294/I-80 RECONSTRUCTION RE-CONSTRUCTION OF A 2-MILE SECTION OF THE TOLL WAY THAT STARTED FROM MARKHAM YARD BRIDGE AND EXTENDED EASTERLY TO DANVILLE ROAD.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Advertisements

MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
14th Ave. S. at the South Park Bridge
APTA BRT Conference Seattle, Washington WHAT IN THE WORLD? AUSTRALIAN BUS RAPID TRANSIT – THE BRISBANE BUSWAYS Stephen Lucas Immediate Past Chairman Bus.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
IRTBA “STATE OF THE INDUSTRY” Will County FY 2012.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
mydocs-presentations-2011PAPAMWF-EricaRevisions
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
1 Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014 PROGRAM RECAP AND ENDORSEMENT REQUEST PROPOSED HIGHWAY.
Transportation in Northern Kentucky Rob Hans, P.E. Chief District Engineer, District Six SAME, Cincinnati Post - April 15,
1 HACIA NETWORKING EVENT Jose Rios, P.E.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
Proposed State Highway Projects: Kendall County September 20, 2007 Region 2/District 3 Illinois Department of Transportation.
Longmeadow Parkway Fox River Bridge Corridor
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
By: Jacob L.. About Wilmington  Wilmington is in Will County, Illinois, and is located on the Kankakee River.  Wilmington is 52 miles south of Chicago.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
WVDOT GTI SECTION Status Update for Miss Utility.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Illinois state line to Madison Dane and Rock County
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
Transportation Supply and User Costs CE 451/551 Principal source for this lecture: Transportation Costs & Benefits Resources for Measuring Transportation.
1 THE FREIGHT RAIL INFRASTRUCTURE CHALLENGE 2009 AASHTO SCORT Conference – Oklahoma City, OK September 20 – 23, 2009.
Current Construction Projects Major Projects Pinellas County.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
CAT Realignment and Reconstruction of Rt. 28A Town of Olive Ulster County, New York January 2009.
A CANAL TRANSIT. PANAMA CANAL OVERVIEW LOCK CONTROL TOWERS MIRAFLORES LOCKS.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Community Development Department Construction Phase.
Denver Area Transportation Issues and the Future of Transit Development in the Denver Metro Area Sertoma Club January 12, 2012.
Central Arkansas Transit Authority Enhancing the Downtown Economy.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
I&M Canal Present 1871 = Chicago Fire 1871 = Chicago Fire –Il. gave $2,955,340 to the city to deep cut the canal.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Complete Route 11 After about 2 miles, turn right onto Morattico Road (County Rte 622)—it’s less than 100 feet after the turn for.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Federal Project No. BRLO 5951 (151) Bonita School Road Bridge Replacement September XX, 2013 Applicant: Santa Barbara County Public Works Transportation.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
Yuma County Report Roger A. Patterson, P.E. County Engineer June 5, 2008.
Preliminary Estimated Cost
The Industrial Revolution – Day 2
Est. Begin Construction
The I-465 West Leg Reconstruction Project
Preparing for an Increasingly Urbanized San Joaquin Valley
District 3 Complete Streets Projects
Region 4 Managers Meeting May 11, 2016
Central Arkansas Transit Authority
Directions to Butler Stadium: FROM THE NORTH: Take I-95 south toward Richmond Va. Take exit 150A toward Triangle/Quantico. Cross Jefferson Davis Highway.
Victor Valley Subarea Expenditure Plan
Central Arkansas Transit Authority
Contract 60X10 Informational Meeting Weber I-55
Henry Clay’s American System
Heart of Florida Loop East Section
Joint Staff Suffolk Arrival and In-Processing Procedures
Henry Clay’s American System
Monterey County Project Report for Measure X Expenditures
Westward Bound Section 2.
Major Initiatives in Hampton Roads
About Rio Grande Pacific Corporation
Presentation transcript:

I-294/I-80 RECONSTRUCTION RE-CONSTRUCTION OF A 2-MILE SECTION OF THE TOLL WAY THAT STARTED FROM MARKHAM YARD BRIDGE AND EXTENDED EASTERLY TO DANVILLE ROAD. ABOVE PHOTOS: MAINLINE BRIDGE OVER THE THORNTON QUARRY OPERATED BY MATERIAL SERVICE CORP LOCATED IN THORNTON, ILLINOIS.

INTERSTATE 355 SOUTH EXTENSION  THE I-355 SOUTH EXTENSION CONSTRUCTION FROM I-55 to I-80 LOCATED IN WILL AND COOK COUNTY, ILLINOIS.  THE PHOTO AT THE RIGHT IS THE 1.2-MILE LONG BRIDGE OVER THE DES PLAINES RIVER (I & M CANAL) WHICH IS A PORTION OF THE 12.5 MILES TOLLWAY PROJECT.

ILLINOIS ROUTE 34 RECONSTRUCTION AND WIDENING OF A 2-MILE SECTION OF THE ROADWAY STARTED FROM LEW STREET AND EXDENDING TO ELDAMAINE STREET IN PLANO, ILLINOIS.

I-57/IL-50 INTERCHANGE RECONSTRUCTION – IN BRADLEY, ILLINOIS LEFT PHOTO: BRIDGE OVER ILLINOIS ROUTE 50. RIGHT PHOTO: BRIDGE OVER ILLINOIS CENTRAL RAIL ROAD

FPDCC IMPROVEMENTS LEFT PHOTO: CONSTRUCTION OF PHYSICAL EXERCISE STAIR AT THE SWALLOW CLIFF RIGHT PHOTO: CONSTRUCTION OF FISHING PLATFORM AND INSTALLATION OF RIPRAP ALONG THE BANK OF MAPLE LAKE. BOTH PHOTOS ARE LOCATED IN PALOS HILLS, ILLINOIS