GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

SPS Secondary Beam Experimental Areas Access System 7 September 2012.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
The Access System for the SPS Experimental Areas Outline Generalities Experimental areas Safety elements and interlock chains  access rules to experimental.
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
HiRadMat hearing session: safety file HiRadMat Hearing session CERN, July 27, 2011 Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
REPORT VISIT SAPHYMO Dorothea Pfeiffer GIF++ Project Meeting
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 29/06/12R. Fortin PH-DT-DI1 Procurement of the 10TBq 137.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
30th March 2007A.Fabich, CERN AB-ATB1 MERIT - Status of the Experiment A. Fabich CERN AB-ATB MERIT safety review (3)
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
Extraction and beamline progress B.Goddard TE/ABT.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
GIF++ The new Gamma Irradiation Facility at CERN Physics Department Detector Technology Group 25/07/12 Project #4R. Fortin PH-DT-DI1 Status of procurement:
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
H4 beam line for GIF Adrian Fabich, EN-EA-LE GIF users meeting, 17 th February 2016.
The Next Generation of a Gamma Irradiation Facility GIF++
(Access system for HWC)
MEDICIS Safety Alarms Systems
Test beam check list Michael JECKEL EN-EA-EC.
Safety in the Neutrino Platform Hall
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
LAAWG Status Report – 15th May 2007
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
2016.
Presentation transcript:

GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015

Schedule 214/1/2015A. Fabich, EN-MEF-LE Functional specs: Juli 2013 Functional specs: Juli 2013 CE start Dec CE start Dec Commissioning Nov EDMS V0.2

Services available 14/1/2015A. Fabich, EN-MEF-LE3  Zones of bunker, preparation and service area  Gas distribution  Gas supply – see Ernesto’s talk  Electricity  Gas racks gradually connected with installation  Safety systems  Access safety system  RP monitoring  Gas and fire detection

Project documentation 4  Documentation:  EDMS:  Specifications, drawings, technical notes …  Meeting (notes):  Safety documentation  EDMS  Tripartite authorisation  Received 9. Oct /1/2015A. Fabich, EN-MEF-LE

GIF radiation zone The irradiation zone hosting the irradiator  is a controlled area (PPE154).  inside a supervised area (EHN1). Film badge mandatory  No risk of activation due to low intensities of secondary beam  Presence of high intensity photon source requires additional precautions due to the prompt radiation levels:  Extended shielding  Entrance chicanes  Dedicated monitoring Modifications to the shielding concept are only to be authorised by the TSO. 5A. Fabich, EN-MEF-LE14/1/2015

GIF++ layout A. Fabich, EN-MEF-LE 6 secondary beam shielding 14/1/2015 PPE PPG PPX - IS AN EMERGENCY EXIT ONLY

Operational safety procedures 14/1/2015A. Fabich, EN-MEF-LE7 Standard procedures of EHN1 Access  Similar to any other beam zone  Possible for anyone with film badge  Based on EHN1 standard equipment and layout  Installation works in beam areas requires PPE (helmet, safety shoes) Patrol procedure  H4 beam line patrol right – training authorisation required  2 patrol buttons Manual veto  Procedural safety from the CCC  GIF source is included in the safety chain of zone H4C N.B.: An intrusion (forcing the door) to an active beam zone causes a primary interlock stopping the SPS.

Preliminary 14/1/2015A. Fabich, EN-MEF-LE8  13 parasitic and 3 dedicated weeks out of 29 weeks of total proton beam time in 2015

GIF is operational 14/1/2015A. Fabich, EN-MEF-LE9 Upgrade installations during 2015  Installation of full fletched gas detection system  Supplying demin. water and compressed air to the bunker  Installation of XTDVs (mobile dumps)  Increasing the flexibility in swapping with other users RP monitoring inside the bunker Jan Dec. 2014