M. Gilchriese Upgrade Stave Mechanics(Only) Status September 16, 2006.

Slides:



Advertisements
Similar presentations
Module Metrology Peter Sutcliffe. Peter Sutcliffe – Module Metrology Wenzel CMM Module Metrology carried out on Wenzel CMM with module jig aligned along.
Advertisements

M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
1 st Petal Prototype Fabrication completed October 27, 2008.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Status Update on Mechanical Prototype in Rome November 6,
CERN, the 9th of Nov FEA Updates on Structures (overall ID model) University of Geneva: G. Barbier, F. Cadoux, A. Clark, D. Ferrère, M. Weber.
Mechanics/Cooling U.S. Silicon Strip Upgrade Meeting M. Gilchriese August 12, 2008.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Recent Study Topics Full length model with wafers, hybrids and cable as dead weight.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
M. Gilchriese Mechanics Labor and Disk Sectors US Pixel Meeting November 2001.
Pixel Upgrade Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman,
M. Gilchriese Update on Pixel Prototype Mechanics/Cooling Structures at LBNL February 1, 2008 M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese and.
Mechanics: Status and Plans Bill Cooper (Fermilab) (Layer 1) VXD.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
WBS Stave Mechanics, Cooling and Support - LBNL ATLAS Upgrade R&D Meeting UC Santa Cruz May 3, 2007 E. Anderssen, M. Cepeda, S. Dardin, M. Gilchriese,
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
M. Gilchriese Integrated Stave Mechanics/Cooling Backup ATLAS Upgrade Workshop Valencia December 2007 M. Cepeda, S. Dardin, M. Gilchriese, C. Haber and.
M. Gilchriese Upgrade Stave Assembly and Robotics August 3, 2007 LBNL.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
M. Gilchriese Integrated Stave Mechanics/Cooling June 5, 2008 CERN.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
M. Gilchriese ATLAS Upgrade Mechanics/Cooling and System Design by LBL January 2008.
ILC Vertex Tracker Ladder Studies At LBNL M Battaglia, D Contarato, L Greiner, D Shuman LBNL, Berkeley.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
M. Gilchriese SLHC Pixel Local Supports Based on Thermally Conducting Carbon Foam E. Anderssen, M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese,
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
M. Gilchriese - November 12, 1998 Status Report on Outer Support Frame W. Miller Hytec, Inc E. Anderssen, D. Bintinger, M. Gilchriese LBNL.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Mechanical and Thermal Management for ATLAS Upgrade Silicon Tracking System W. O. Miller (iTi) Carl Haber (LBNL), Gil Gilchriese (LBNL) Carl Haber (LBNL),
ATLAS Pixel Detector February 2002 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report: LBNL Effort February, 2002 N. Hartman,
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
M. Gilchriese Integrated Stave Mechanics and Cooling ATLAS Upgrade Workshop December 2007 M. Cepeda, S. Dardin, M. Gilchriese, C. Haber and R. Post LBNL.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
BNL & Yale Mechanical Stave Developments BNL: David Lynn, Marc-Andre Pleier, Anatoli Gordeev, Russ Burns, Ken Sexton Yale: Paul Tipton, Will Emmet, Tom.
M. Gilchriese ATLAS Pixel Upgrade Thoughts on US Role.
M. Gilchriese Stave Prototype Status Summary July 5, 2006.
M. Gilchriese - December 2000 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Wirth and D. Uken Lawrence.
December 1999 Frame and Assembly Planning Status E. Anderssen, D. Bintinger, M. Gilchriese and F. Goozen LBNL W. Miller Hytec, Inc.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
New R&D Directions Carl Haber ATLAS Tracker Upgrade Mechanical Meeting 11-Sept-2013.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
M. Gilchriese Towards Fabrication of a Mechanical Prototype Stave.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
Prototype Review 04-Sept Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
1 Disk Sectors Integrated support and cooling for disk modules. Each sector has 6 modules Number of sectors is 2x9+4x8=50. Fabrication of all sectors in.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
M. Gilchriese - February 2001 Disk Sector Status E. Anderssen, M. Gilchriese, F. Goozen, N. Hartman, T. Johnson, F. McCormack, J. Taylor, T. Weber, J.
EC: 7 DISK concept Preliminary considerations
Strip Petals: Local supports and prototype tests
Development of a low material endplate for LP1 and ILD
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
? ENDCAP: Mechanics IFIC-Valencia.
Presentation transcript:

M. Gilchriese Upgrade Stave Mechanics(Only) Status September 16, 2006

M. Gilchriese 2 References Only address mechanical work here There is a wiki page for this work at de_R%26D_-_Mechanical_Studies de_R%26D_-_Mechanical_Studies Bill Miller et al primarily responsible for design, FEA and tooling design His most recent talk, at STD6, is at the wiki link – look at this for much more complete status report. Overall concept in STD6 talk from Carl also at wiki link.

M. Gilchriese 3 Concept Reminder 1 meter long prototype, shown with modules, hybrids High modulus facings with honeycomb core Aluminum U-tube Side closeouts End closeouts Guide and locating pins

M. Gilchriese 4 Status Concept complete enough to begin fabrication of prototypes Working on tooling design for fabrication of mechanical stave core. Buy high modulus fiber and honeycomb All other fabrication at LBNL Will use existing pipes from pixel project(to save $) for prototypes. Would not use same pipe in real objects, but close enough. Have recently added new CMM capability(2m objects, combined touch and optical probes). Flatness of mechanical core is sure to be an issue. Also measured sag compared to calculated.