Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E31 20.5 hrs 2821Sat 1:513.8E31.

Slides:



Advertisements
Similar presentations
Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)
Advertisements

Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon.
Your Week A record of activity and [WHAT YOU ARE TRYING TO CAPTURE] Prepared by the [YOUR TEAM] team. Instructions 1. Use this diary to record your activities.
L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
Arnd Meyer (RWTH Aachen) Jan 23, 2004Page 1 Data Taking Jan 16 – 23 Store # BeginLum [cm -2 s -1 ]Duration 3175Fri Jan 16 16:23 4.5E hrs 3177Sat.
Arnd Meyer (RWTH Aachen) Jan 9, 2004Page 1 Data Taking Jan 2 – 8 Store # BeginLum [cm -2 s -1 ]Duration 3123Fri 16:134.3E hrs 3125Sat 23:414.2E31.
FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Arnd Meyer (RWTH Aachen) Dec 4 th, 2003Page 1 Tevatron and DØ Status and Plans Arnd Meyer, RWTH Aachen DØ Germany Meeting December 4 th, 2003.
Arnd Meyer (RWTH Aachen) Oct 8, 2003Page 1 Data Taking Status and Plans Achievements Concerns Plans Arnd Meyer, RWTH Aachen D Ø Collaboration Meeting October.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
7 October All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 DØ Summary - Week of 2002 September 30 – October 6 Luminosity & operating.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Calorimeter Data Monitoring News Benoit Viaud (LAL-in2p3) B. Viaud, Calo Mtg Aug. 31 st
RUN COORDINATOR’S REPORT 1-8 May 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 8 May 2006.
MOM Report Victoria Blackmore VC /06/11 1/7.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
L2 Upgrade review 19th June 2007Alison Lister, UC Davis1 XFT Monitoring + Error Rates Alison Lister Robin Erbacher, Rob Forrest, Andrew Ivanov, Aron Soha.
L3 DAQ Doug Chapin for the L3DAQ group DAQShifters Meeting 10 Sep 2002 Overview of L3 DAQ uMon l3xqt l3xmon.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Arnd Meyer (RWTH Aachen) July 18, 2003Page 1 Data Taking July 11 – 18 Store # BeginLumDuration 2774Thu 15:373.3E hrs 2780Fri 20:403.6E hrsTRF4.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Annie Griffith November 2007 Gemini OSU - UKLC Update.
All Experimenters MeetingDmitri Denisov Week of December 23 to December 30 D0 Summary  Delivered luminosity and data taking efficiency u Delivered: 5.8pb.
Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
TC meeting P2 planning wks 3&4 A.Tauro
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
MON TUE WED THU
Summary of Week 16 G. Arduini, J. Wenninger
2008 Calendar.
LHC Morning Meeting - G. Arduini
Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
2008 Calendar.
Presentation transcript:

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 1 Data Taking July 25 – Aug 1 Store # BeginLum [cm -2 s -1 ]Duration 2817Thu 22:354.0E hrs 2821Sat 1:513.8E hrs 2824Sun 3:004.2E hrs Quench 2826Mon 2:283.6E hrs 2828Tue 8:473.5E hrs 2830Wed 7:143.4E hrs Abort (RF PS) 2847Fri 3:503.3E31 ongoing 98 store hours (Fri-Fri 0:00) Need ~5.6pb -1 /week until Aug 25 for “base goal” (6.4pb -1 last week) Long stores, targeted studies on-the-fly Expect more studies once base goal is reached All-time best

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 2 Data Taking July 25 – Aug 1 Day∫L dt (del)∫L dt (rec)Efficiency Fri 1541nb nb % Sat 1616nb nb % Sun 1397nb nb %L1CAL Mon ≃ 1400nb -1 ≃ 1200nb -1 ?%L1CAL Tue ≃ 1200nb -1 ≃ 1100nb -1 ?% Wed 814nb nb % Thu 0nb -1 0nb -1 This week ≃ 8000nb -1 ≃ 6900nb -1 ≃ 86% Last week6929nb nb % Best week9786nb nb % Best run ever: Run , recorded 479nb -1 5 th best 6 th best

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 3 Integrated Luminosity

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 4 Events / News / Downtimes ● L2 rates too high at beginning of record store prescales adjusted ● Last week's “Feature of the week” mostly fixed Frequent pauses+SCLinit due to Muon Scintillator (CES), combined with Muon triggers missing after SCLinit Fatal tailspin due to large number of alarms... alarm SCLinit Muon rates drop several SCLinit's next alarm... ● Present “Feature of the week”: L1Muon trigger ● Or: Discovery of welding activity as source of Calorimeter “Ring of Fire” ● Three controlled accesses Friday: CES SFE swap, FPD TPP board swaps, CAL timing measurements Monday: Dry engine switch, CES SFE swaps, CFT+CTT board replacements, L1Muon power supply replacement Wednesday: more SFE replacements in CES, CAL timing adjustments on crate controllers ● Major downtimes: L1CAL trips: 4 hrs SMT special runs: 1.2 hrs

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 5 Post-Access Checkout ● Avoid coming out of access in worse shape than before ● Checklist Captain or Access Coordinator? –He/she would ask each shifter to check their systems Each system needs to –Develop their checklist –Provide instructions to shifters ● Walk-through in the collision hall? Common sense / experience instead Always one experienced person per team ● In general not always possible before access is finished

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 6 L1 CAL Sun/Mon (from Dan) ● Rack power safety system shut down the L1 Cal Trig Sunday afternoon during store. Concern about the noise made by the air blower when it was restarted and problems contacting Dan (long distance pager did not work in Michigan) prevented getting the system running again before the store was lost due to a quench, about 2.5hrs after the trip ● Monday morning there were 4 more trips of the L1 Cal Trig. Recovery from these trips was without problems and went about as fast as possible (on average 30min). 3 of these 4 trips happened during a store. ● After the 4th trip Monday morning the drive belt for the air blower was replaced. The belt that was removed did not look frayed or glazed but slipping of this belt was the suspected cause for the rack power safety system shutting down the Cal Trig. After this belt was replaced, the rest of the store on Monday was completed without further problems from the L1 Cal Trig. ● Monday evening the L1 Cal Trig was shutdown so that Pete Simon and Jim Fagan could inspect the air blower, and its power contactor. The safety system sensors that monitor the air flow were also checked to make certain that a faulty sensor was not causing the power trips. No problems were found. Then L1 Cal Trig was started back up and tested to verify that it still functioned correctly after these 5 power trips. No problems were found.

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 7 L1CAL cont. (from Dan) ● Over the years this air blower and its drive belt have received preventive maintenance. It was last serviced during the January 2003 shutdown. Before this incident we had not had any trouble with this blower in the 10+ years that it has been operating. ● Action to prevent this from happening again We can begin a 4 times a year schedule to inspect this blower and adjust its drive belt. I'm concerned about being blind sided by this again because there was no indication of a problem with the blower. On the Friday before the Sunday incident the differential air pressure across the racks and the air flow velocity in the racks were reading their normal values.

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 8 SBC Crashes (from Doug) ● Definitely a kernel bug or subtle bug in our driver code ● Cannot get it to occur in our test crate ● Have several good debugging ideas that simply require my personal attention and dedicated time ● With LP work complete/abandoned, will tackle this in the next few weeks

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 9 Level 2 (from Reinhard) ● Have done a successful test reading out L2CTT during zero-bias running Getting ready to put it in the run during global running with beam ● Occasionally missing L2 Muon input and the DAQ or calmuon shifters don't recognize it as such and page the L2 expert instead of resetting or fixing the broken muon front-end ● Smooth running other than that

Arnd Meyer (RWTH Aachen) Aug 1, 2003Page 10 Agenda RussMechanicalStefan/BrigitteL1CTT ArndData TakingFred/Drew/AbidCFT/PS Bob K. / NNL1 CAL NirmalyaCAL Jeff / Rob / NN L1 Muon Al ItoCentral Muon Gordon/Doug L3 DmitriForward Muon Brendan/Michael Lumi/ Server Upgrade Mike S.FPD Breese/MichaelSMT/ Special Runs Geoff/Fritz Controls Michiel/Joe S.GMStu Online ReinhardL2