Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low.

Similar presentations


Presentation on theme: "Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low."— Presentation transcript:

1 Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 1 D0 Status Summary ● Have been in supervised access all week, until Sunday evening ● Intermittent trips (low airflow) of west platform rack One of the magnetic sensors that measure the rate of rotation of the fan wasn't working properly – replaced ● Erected scaffolding on Monday for muon chamber (PDT) electronics replacement under the ceiling – repairs completed ● Power supply repairs for FPD in tunnel – done ● Minor safety improvements (additional step, more exit signs,...) ● Cosmic ray running Friday evening Make sure all systems are fine ● Experiment is in good shape Comprehensive reviews of post-shutdown data quality ongoing

2 Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 2 D0 Status: Calorimeter ● E.g. Calorimeter Good qualitative and quantitative agreement pre- vs. post-shutdown See improvements from effort on noise and grounding, for example (online) RMS of MET improved from 5.3 GeV to 4.4 GeV noise/ADC counts after - before

3 Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 3 CTT Status TTK terms comparable to pre-shutdown Little change in TTK rates due to CFT “dead channels” Slight increase in THT rates seen from setting discriminator outputs of VLPC unbiased channels to 1 (Also descrease in rates due to modified threshold definitions) 2 tracks p T > 1.5GeV 2 tracks p T > 3GeV Occ. > 10%

4 Arnd Meyer (RWTH Aachen) Dec 15, 2003Page 4 “Blue Node” Problem Before: 2 simultaneous encp copies unlimited simultaneous dccp copies Now: 2 simultaneous encp copies 1 dccp copy The problem: d0olc handles incoming (over net) event data, spools it to disk, then periodically reads from disk and sends (over net) to FCC Multiple dccp copy jobs started, overloading d0olc, fed back into L3 L3CR DL DLSAM: encp xN dccp xN d0olc /buffer Tape FCC dcache x 82x 3 Data accumulated here for 60 (20) minutes, Then is copied to FCC tape or disk