HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.

Slides:



Advertisements
Similar presentations
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
Advertisements

HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
Calibration Procedure.  A winch calibration is completed via a linear interpolation between 2 points.  Requires 2 references  Known lower weight 
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Neutron Detector Shutdown Procedure 1.Turn Off Photomultiplier Tube High Voltages There are two HV channels per red module, each with it’s own black dial.
Far Detector Data Quality Andy Blake Cambridge University.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
1 TPC online  offline calibration November 2002.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
OD HV Upgrade Hans Berns Jeff Wilkes U. of Washington 10/14/01.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
19/10/11FV 1 Behavior of generic HV channel. Mail’s survey: appeal for general policy VF2 19/10/11 Patrizia: “Based on the running experience of NA48,
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
Powering tests with the PP2 regulator Laura Gonella Physikalisches Institut Uni Bonn.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
Vito Palladino Straw Working Group 23/3/2015
Presentation transcript:

HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009

CALIBRATION PROGRESS  The calibration of ALL N Run9 modules has been completed successfully. None of the modules have unacceptable offsets!  Procedure for calibration used for all modules: The system ramps every channel up from 0 – 3kV in 50V increments with a timeout of 10.5s each, and from 3 – 4kV in 10V increments with a timeout of 10.5s each. The linear ramp up speed is set to 10V/s.  The detailed analysis of all key voltage for every module will be completed before Run9 Kick-off on Feb. 27 th We may decide to use correction tables at any time until then in order to achieve a precision of approx. 0.01% HBD HV Control & Monitoring System Manuel Proissl Page 2 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 19 th, 2009

EN1 CALIBRATION RESULT HBD HV Control & Monitoring System Manuel Proissl Page 3 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 19 th, 2009 EN1 is off by 0.42% 1471N EN1 output: V instead 4kV New DV: V

RESISTOR MEASUREMENTS  Every resistor on every divider installed on the HBD has been measured precisely! Procedure: “Take-out” resistors were taken out one by one, then board-mounted ones, measured in nS over a stable timeframe and recorded every 100ms. Average for every second has been plotted used for further calculations. HBD HV Control & Monitoring System Manuel Proissl Page 4 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 19 th, 2009 Resistance IDSectorModuleSiemensMOhm 31T0ENEN15.03E T1ENEN11.92E T2ENEN19.91E T3ENEN15.06E M0ENEN15.03E M1ENEN13.88E M2ENEN19.98E M3ENEN12.18E B0ENEN15.04E B1ENEN19.79E B2ENEN11.92E B3ENEN15.08E X0ENEN1M4.99E X2ENEN1M9.67E X3ENEN1M9.91E T1 31T2 31T3 31M1 31M2 31M3 31B1 31B2 31B3 31T0 31M0 31B0 31X0 31X231X3 EN1

STATUS / UPCOMING  Based on discussion from last week’s meeting, the database structure has been changed accordingly and their corresponding data objects. It allows now to generate custom ramp up tables for every module and individual mesh voltages. Now the system needs to be tested before hooking up the actual detector, which will be done and tested extensively this week.  Since Friday, all N Run9 modules have been installed again on the bridge and ALL SHV cables and Trip Detector cables have been hooked up to the mainframe in their final Run9 configuration. Please see spreadsheet ( ) for the config information.  Today all cables will be hooked up to the Relay Boards and a low voltage channel test run on the board outputs will be performed.  Furthermore we’ll check if the mainframe (ON) but channels disabled and hooked up to the detector influences the noise on the readout. HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: January 19 th, 2009