Presentation is loading. Please wait.

Presentation is loading. Please wait.

HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.

Similar presentations


Presentation on theme: "HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008."— Presentation transcript:

1 HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008

2 QUICK UPDATE  “HBD Real-time Simulation Project” since December 7 th, 2007 – making HV control crash tests in the PHENIX environment possible  Discharge Resistor changed to 10K  discharge time issue solved | now ~ 1ms  LeCroy’s attempt to self-restart after trip has been completely blocked by recovery routine on PIC18F4620/8722 Microcontroller on relay board  HV Control for experts with enhanced features, like P/T data life remote access and threshold control, in development Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 1 of 5 Connect Relay Discharge Relay From LeCroy 1471 To Resistor Chain 10K

3 QUICK UPDATE Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 2 of 5 ROOT Interface Loop over channels Check / Verify Stat. [every 15sec] Respond to users HV Server (va022) – PHENIX HV Client LeCroy 1458 Mainframe LC 1471 Mesh / GEM Test Box 1 module to serve 16 ……… Divider Test Box HV Client hvdb HBD Server 8 Trip Det. TS hbd1.phy.bnl.gov HBD Lab – Physics, BNL Switch secret IP 8  Logically the HBD is sitting in the IR private network CAEN SY 1527 Mainframe 11 chn. Mod. 14 ……… P/T, etc.

4 QUICK UPDATE  New Lab for HV studies since February, 2008 at Physics, BNL LeCroy 1458 w/ 1471s and CAEN SY1527 w/ (11 chn. Board) in test Triple-GEM & Divider Test Box – runs with both MFs in parallel Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 3 of 5

5 QUICK UPDATE  New Lab for HV studies since February, 2008 at Physics, BNL Two high-speed HBD servers: Automatic read-out of P/T data from hutch at PHENIX [in progress] (so far by Bob and Jason) HV Detector performance data accessible, etc Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 4 of 5

6 QUICK UPDATE  New Lab for HV studies since February, 2008 at Physics, BNL ADAM 5000E Data Acquisition system tests in session (access via OPC servers) High Precision (~ 0.1% offset) HV Control Feedback system in development for Run9 – independent from PS (LeCroy or CAEN) State-of-the-art high-speed system for HV Detector Simulations, Maxwell 3D, Crash Tests, etc. installed in HBD lab Upgrades For Run8 | PHENIX, BNL HBD HV Control System HBD Meeting :: March 4 th, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 5 of 5 Ethernet PHONCS8 OPC Server A Fiber Interface 38.4Kb TXD RXD Fiber Interface RMCS-3 CMW1 -0x98 CMW2 -0x90 -0x91 CME -0x80 HBD Heater -0x82 -0x83 DAQ RoomInteraction Region OPC A-4


Download ppt "HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008."

Similar presentations


Ads by Google