WBS 1.6 - Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

LArTF and MicroBooNE Installation
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Federal Aviation Administration Project Status Update: R90 Tracon, STL ATCT, MCI ATCT, mold and moisture issues Presented to : CSA Terminal and Technical.
14 Foundation Plans Chapter Permission granted to reproduce for educational use only.© Goodheart-Willcox Co., Inc. Objectives Identify the primary features.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Construction Documents - Consultants Consultants Documents  Aesthetics  Space Requirements  Examples Project: Floor Plan.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Fermilab 1 AP Dept. Activities Report September 20, 2006Dixon Bogert AP Dept. - Activities Report Dixon Bogert - AP Dept. Meeting September 20 th, 2006.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
Construction Drawing Occupational Safety and Fundamentals
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Vertical Test Stand in IB1 C.M. Ginsburg (Fermilab) for the IB1 VTS Group SRF R&D Meeting 6.July 2006.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Conventional Construction Working Group Meeting Tom Lackowski L2 Conventional Facilities Mu2e Working Group.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Fermilab 1 SNUMI Civil Issues September 18, 2006Dixon Bogert SNUMI Civil Design & Site Considerations; Issues and FESS work Dixon Bogert SNUMI Meeting,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
April 5, 2005 PPD Informal FLARE Review T. Lackowski 1 FLARE Conventional Civil Construction.
Residential Construction Drawings
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MicroBooNE Working Group Meeting March 08, :00– 2:00 PM Black Hole (WH2NW)
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
WBS Experiment Infrastructure: LArTF GPP Project Status Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 11/02/12.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
Upon completion of this module, you will be able to:
THIS IS JEOPARDY.
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Construction Documents
CONSTRUCTION MASTERS BONUS BONUS
Total Fitness Gym By Student Architect Jhonatan Rubio
Fire Protection Survey Procedure
Instructor: C. Koutsougeras
1 Semester Project Design A Multi Story Office Building
Collaborative Project
NERC Reliability Standards Development Plan
Planning and Zoning Board – October 14, 2004
NERC Reliability Standards Development Plan
Polarized 3He target installation
DS20k Integration Workshop
Presentation transcript:

WBS Experiment Infrastructure: Design Status Discussion Dixon Bogert Prepared for the MicroBooNE Collaboration Meeting 6/17/11

Enclosure Design - Progress  CMT is working on the facility design. As reported at the last collaboration meeting, the Purchase Order for design services was modified to complete the design as fast as possible. The design is scheduled to be complete by mid August.  CMT Progress Meetings were held on May 25 th and June 9 th. The next CMT Progress Meeting is Scheduled for Monday June 20 th. Work is moving ahead rapidly.  A 60% review is scheduled for early July.  The soil borings requested by CMT were completed June 3 rd.  At the May 25 th progress meeting FESS personnel presented some comments based upon their recent reviews of this work. This led to a few changes in the design basis. The most significant change included the recognition of the code requirement that any structure more than 30 feet deep (MicroBooNE is 40 feet deep) requires two independent exits if it is not to be classified a “confined space.” CMT was directed to include a second “stair tower” reflected across the cylinder. The cryogenics staff at Fermilab is revising the equipment layouts in conformity with this change. The above changes were incorporated in the drawings presented at the June 9 th meeting MicroBooNE Collab Slides 06/17/11– D. Bogert 2

 Added 2 nd Stair  Filter skids moved MicroBooNE Collab Slides 06/17/11– D. Bogert 3

MicroBooNE Facility Design  As reported at the last collaboration meeting, CMT and FESS architects have relocated the electronics room. This relocation is accepted.  A formal “life safety” report on the design as it now exists has been requested from a consultant.  Fermilab MAY change the facility to a GPP Project.  Information on the exact elevation of the neutrino beam center at the proposed cylinder center STILL needs to be forwarded to CMT immediately.  Given the accuracy desired, this has proven not be trivial  Information presently in-hand can locate BNB centerline on the order of one or two feet – x,y and z.  We are expecting the “best that metrology can do” Monday the 20 th. MicroBooNE Collab Slides 06/17/11– D. Bogert 4

Civil Drawing from CMT - Location 5 MicroBooNE Collab Slides 06/17/11– D. Bogert Size of the hole to dig Enclosure

What’s Happening Now and Next 6  Current CMT Design efforts:  One piece removable steel frame roof with easy weather seals  Platform supports and materials  Location of exterior pads for electrical and HVAC equipment  We will push the CMT work as fast as possible.  We should conduct the WBS 1.6 Enclosure Internal Review!  Include location accuracy; equipment layout; support needs of the detector elements  We will prepare draft purchase reqs for a number of items that may be considered for long-lead purchase to present at the CD 2/3A Review.  We are considering entry requirements with energy conservation in mind. MicroBooNE Collab Slides 06/17/11– D. Bogert

Drawing from CMT – Plan Views 7 MicroBooNE Collab Slides 06/17/11– D. Bogert X-Sections at the elevations of each Stair Landing Pit Platform

Drawing from CMT – Overall Plan View 8 MicroBooNE Collab Slides 06/17/11– D. Bogert Ground Level

MicroBooNE Collab Slides 06/17/11– D. Bogert 9 Removable Roof Section Ground Level Platform Level Pit Level Pit level floor you walk on is a grating above a containment volume – 15” deep You can enter both stair columns from outside, or from within the enclosure. You can exit one stair, cross the enclosure, and enter the other stair, at the Ground Level, the Platform Level, and the Pit Level

MicroBooNE Collab Slides 06/17/11– D. Bogert 10

Drawing from CMT – Exterior Elevations 11 MicroBooNE Collab Slides 06/17/11– D. Bogert

Drawing from CMT – Exterior 3D Rendering 12 MicroBooNE Collab Slides 06/17/11– D. Bogert

Final Comments 13 MicroBooNE Collab Slides 06/17/11– D. Bogert  I will try to modify the TDR in real time as drawings come in.  The work by Linda Bagby, Cat James, and Jim Kilmer and Co. in locating equipment in the facility has been of the utmost help in working with CMT to prepare the plans for the platform and electrical service panel and transformer locations, etc., as well as more general features of the design. I appreciate their efforts greatly.