MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-

Slides:



Advertisements
Similar presentations
Strategic Environmental Assessment: Methodology Mary M. Matthews, Ph.D. SEA Consultant for European Delegation.
Advertisements

Concurrent Plan Updates?. Plan Update Requirements Cost-Affordable Transportation Plan Horizon Year Due December 2014 Hillsborough County Comprehensive.
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
Slum Situation Analysis
Introduction to Urban Planning Dr. A.M. Khan Department of Civil & Environmental Engineering CIVE4303, GEOG4303 September 2005.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
MTF Rail Development Forum
1 CHAPTER 12 INTERNATIONAL FINANCING AND NATIONAL CAPITAL MARKETS.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
SOCIAL IMPACT ASSESSMENT. WHAT IS SOCIAL IMPACT ASSESSMENT The systematic analysis in advance of development or policy changes that will bring social.
CASE OF NAIROBI.  A public space is a social space that is open and accessible to all which offer important opportunities for sport and outdoor recreation.
1 URBAN PLANNING PROCESS AND MASTER PLANNING Prof. Dr. S. Shabih-ul-Hassan Zaidi B.Sc. CRP (UET, LHR); M.Sc. HSP (AIT, Bangkok); Ph.D. URP (Birmingham.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Convention on Biological Diversity AOSIS Workshop on Trade and Environment Montego Bay, December 2001 The sustainable planning and management of.
AGENDA Prayer Prayer Introduction – TLB Chairman Introduction – TLB Chairman Proposed Approach in Ngamiland – BDC Proposed Approach in Ngamiland – BDC.
3 September UNDERSTANDING THE SEA 20 th May 2013 Presented by: K. Florence.
EMOBILITY WORKS Integration of e-mobility in European municipalities and businesses IEE/13/706/S March 2014 – August 2016.
Urban stress and sustainable solutions in LEDC cities
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Project Implementation Plan and Principal Activities
LOCAL BUFFER SUPPORT PROGRAM 1 May 2014 MAV. Liveability, growth and waste As Melbourne continues to grow, we need secure the right mix of resource recovery.
Minsk, October 8 th, 2014 Martin Smutný Integra Consulting Ltd.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Climate Change Council November 2011 draft ACT Planning Strategy.
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
UNECE WPLA Workshop Athens, December, 2012 Informal Settlements (Azerbaijan) Dr. Elshad KHANALIBAYLI State Committee on Property Issues Republic.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
1 Policy Analysis for RISPO II National Workshop XXXXX 2006.
Workshop Conclusions and Recommendations   To establish a responsibility system for EIA management and enhance the accountability of government officials.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
Key Principles for Preparing the DCSD Community Plan 1.Integration – Social, Economic, Environmental Well-being focused on outcomes and people centred.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
Environmental Impact Assessment in the Slovak republic.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
UNFCCC Workshop on the use of the guidelines, Mauritius, 8-11 april 2003 Part IV : General description of steps taken or envisaged to implement the Convention.
Urban & Regional Development Policy On Bangladesh
State Planning Policy 5.4 Noise and Freight Considerations in Land Use Planning Evan Jones and Kareena May August 2014.
Mombasa gate city master plan
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
EKURHULENI METROPOLITAN MUNICIPALITY CITIES ALLIANCE PUBLIC POLICY FORUM.
Linking SEA and City Development Strategy (CDS) in Vietnam Maria Rosário Partidário, Michael Paddon, Markus Eggenberger, Minh Chau, and Nguyen Van Duyen.
Tshepo Makhanye Information Section: Research Unit.
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
UDIA HOT TOPICS – STRUCTURE PLANNING REFORM & LIVEABLE NEIGHBOURHOODS REVIEW 26 SEPTEMBER 2012 PAUL ELLENBROEK PROJECT MANAGER – LIVEABLE NEIGHBOURHOODS.
Sustainability – why is it way beyond the Triple Bottom Line ?
Neighborhood Planning Process Lacoochee/Trilby Neighborhoods.
INSTITUTE OF CERTIFIED PUBLIC SECRETARIES OF KENYA Governance, Integrity and Investment Conference Venue: Travellers Beach Hotel, Mombasa Session: County.
WEDNESDAY 27 NOVEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB.
MHPP Forum James Shuttleworth Planning and Infrastructure Manager, MCC 9 December 2015 Greater Manchester Spatial Framework.
Initial Budget Proposals 2015/16 Initial Budget Proposals 2015/16 Presentation by Leader of the Council and Portfolio holder for Performance and Efficiency.
FRIDAY 29 NOVEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
GOOD GOVERNANCE LEARNING NETWORK INTEGRATED DEVELOPMENT PLANNING WORKSHOP, 11 AUGUST 2007, SHF OFFICES plan Act Making towns & cities work for people.
Local buffer support Program
ARCH – 4601 Feasibility Study Presentation
Somewhereville town centre regeneration - EXAMPLE
Emilija Manic, PhD, Associate Professor The Faculty of Economics
60th National Town and Country Planners’ Congress
Shaping the future of Laverstock and Ford Parish
Objectives To promote mental health through public
Local buffer support Program
STREET LED APPROACH IN SLUM UPGRADATION
GCF business model.
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Presentation transcript:

MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY- LANG’ATA VENUE- KIBERA DC PLAY GROUNDS

INTRODUCTION The proposed NIUPLAN has the potential to generate environmental, social and economic impacts to the citizens of Nairobi County and its environs. SEA is therefore a necessary tool to evaluate potential environmental, social and economic impacts of the proposed NIUPLAN.

WHY SUBJECT NIUPLAN TO SEA?  Legal requirement: EMCA 1999; SEA Guidelines 2012;  It’s a consultative tool used to capture people’s concerns on expected impacts of the NIUPLAN.  To ensure that identified issues are fully studied and appropriately addressed at the earliest stage of planning and decision-making.

STUDY AREA

P ROGRESS SO FAR ACTIVITYPERIOD 1 stakeholder workshop conducted prior to the scoping study: 5 August 2013 Preliminary 18 public meetings conducted during the scoping study stage: Late August to Early September 2013 Submission of Scoping Report and Terms of Reference for the Detailed SEA Study to NEMA for approval 28 September 2013

IssueCommentsQuestions on Way Forward Social amenities Nyayo Highrise had no public health centre and primary schools and the Master Plan should address the provision of such essential facilities The proposed Master Plan should set aside Pieces of land for Markets and low cost housing projects that would cater for the low income groups who reside in slums The Master Plan should set aside spaces for technical institutes and colleges since all the previous middle level colleges have been upgraded into universities. In a large settlement like Kibra, a number of social facilities such as police stations, prisons and rehabilitation centres should be provided for in the NIUPLAN. What is the precise shortcoming (for each sector) within these facilities including: Physical presence Facilities Man-power Accessibility (Distance and cost) ISSUES ARISING FROM FIRST PHASE OF PUBLIC MEETINGS FOR FURTHER DISCUSSION

IssuesCommentsQuestions on Way Forward Land use systems The master Plan should create avenues for wealth creation by allowing for mixed land uses as long as there is an acceptable level of compatibility. Which uses do you consider to be compatible with industrial uses? Which uses do you consider to be compatible with residential uses? What would you consider to be a functional mixed use development? PerceptionThe proposed Master Plan should change the image of Kibra from the already negativity that it is perceived with and tackle the issue of poverty tourism How would you wish kibra to be reformed. ISSUES ARISING FROM FIRST PHASE OF PUBLIC MEETINGS FOR FURTHER DISCUSSION cont..

IssueCommentsQuestions on Way Forward Infrastructure in relation to vulnerable groups. The nature and design of the infrastructure such as roads and transportation system, that will be included in the master plan should take care of the needs of persons with disabilities especially those on wheelchairs. Propose measures on how to implement this in the NIUPLAN. Informal settlements and slumsSprawling, unplanned development (Kibra) What improvements do you think would be a priority to improve the situation.

ISSUES ARISING FROM FIRST PHASE OF PUBLIC MEETINGS FOR FURTHER DISCUSSION cont.. DISCUSSIONS

FUTURE CONSULTATIONS