S. Smith LCLS Facility Advisory October 12, 2006 1 Beam Position Monitors Facility Advisory Committee October 12, 2006.

Slides:



Advertisements
Similar presentations
Arduino Guitar Pedal Ian Andal IME 458 Dr. Pan.
Advertisements

Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Dayle Kotturi and Stephanie Allison Facility Advisory Committee Meeting April 20-21,
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
APS BPM and power supply applications on micro-IOCs W. Eric Norum
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Fast Fault Finder A Machine Protection Component.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
TBL BPMs: electronics Antoni Gelonch, Yuri Kubyshin, Xavier Millán, Gabriel Montoro CTF3 Collaboration MeetingCERN, January 16-17, 2007 In collaboration.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
- CLICK WORKSHOP, October BPM for TBL: status of the amplifier Gabriel Montoro*, Antoni Gelonch, Yuri Kubyshin Universitat Politècnica de.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
PADME Front-End Electronics
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
ERL BPM System Mike Billing, Mark Palmer
LCLS Event System - Software
Low Level RF Status Outline LLRF controls system overview
Beam Current Monitoring with ICT and BPM Electronics
Low Level RF Status Outline LLRF controls system overview
EEG Probe Project Grant G. Connell.
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
SuperB Linac Beam Position Monitor
SuperB Linac VME Beam Position Monitor
Low Level RF Status Outline Overview showing hardware instances
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
Breakout Session SC3 – Undulator
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Presentation transcript:

S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006 Action Items from previous review Requirements / Specifications System overview Status Schedule

S. Smith LCLS Facility Advisory October 12, Action Items from Previous FAC Decide on a Digitizer Echotek glitches, lockups, lack of progress Plan B  Plan A: Select 4 channel PAD digitizer. Fix schedule Still schedule trouble Plan barely finishes on time No schedule contingency

S. Smith LCLS Facility Advisory October 12, Full document: PRD

S. Smith LCLS Facility Advisory October 12, Beam Position Monitor System Analog Frontend Version Three

S. Smith LCLS Facility Advisory October 12, Beam Test 100 machine pulses Effective beam charge 0.35 nC  y = 2.5 microns

S. Smith LCLS Facility Advisory October 12,  200pC Resolution vs. Charge Measured with beam in machine Tightest machine requirement: 5 micron 200 pC Achieve 4 micron 200 pC Resolution scales like 1/Q for the three measured bunch charges, as expected

S. Smith LCLS Facility Advisory October 12, Linearity Measured IP3 of BPM signal path found IP3 within a few dB of calculation Bench test of apparent position vs. amplitude looks good Test consists of 15 kHz AM of 140 MHz signal Results impeccable. But beam test shows big amplitude  position modulation Discovered prototype not built to schematic Gain distribution wrong  Fixed Took further steps: Raise amp idle current 90 mA  140 mA Reduce bandwidth of first filter, raise that of second filter Narrowband filter before 2 nd gain stage

S. Smith LCLS Facility Advisory October 12, Status Prototype meets resolution requirement Stability not well established Long weekend test looks great But doesn’t apply controlled temperature cycles Attempt to resurrect CPE environmental chambers not successful Thermal cycle tests yet to be performed Proceeding with first article production

S. Smith LCLS Facility Advisory October 12, Calibration Calibrate through BPM Via stripline-stripline coupling Not prototyped

S. Smith LCLS Facility Advisory October 12, Schedule What should be done: (E.M. 9/20/2006) PCB layout – end of September - 29 ? PCB fabrication – one week – October 9 ? PCB assembling – one board here – October 13 Chassis layout – September 28 Panels punching and painting - early October buy the rest of the components – connectors, resistors, capacitors, etc. buy 23 chassis Write detailed test procedure

S. Smith LCLS Facility Advisory October 12, Software & Interface VME IOC EVR SLC - Aware Waveform->U,V,S X,Y,TMIT Archive FIFO Timing EPICS PVs Calib. Timing + Cal Data Dedicated Ethernet PAD IOC AFE AFE CTL diagnostic EPICS PVs ADC Acq.

S. Smith LCLS Facility Advisory October 12, BPM Controls Description User Interface Layer (EPICS, SLC-aware) VME IOC Converts raw waveforms into X,Y,TMIT and feeds them (timestamped) to SLC. Conversion parameters are Pvs Controls calibration PAD IOC Sends raw data upstream (dedicated ethernet) Diagnostic EPICS PVs

S. Smith LCLS Facility Advisory October 12, Software Functionality (Day 1) From SLC-aware IOC averaged BPM readings buffered acquisition EPICS raw waveforms conversion params. (raw position -> x,y) attenuator settings diagnostics

S. Smith LCLS Facility Advisory October 12, Functionality (Near Future) Calibration [some features may be present at day one; untested]. More sophisticated history buffers [other than SLC 'buffered acq'] Filtering of beam codes in EPICS Adjusting to beam charge in 'real-time'

S. Smith LCLS Facility Advisory October 12, Conclusions Good performance demonstrated Schedule critical