Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Welcome to the Grafton Village Town Hall Meeting! March 14, :30-7:30 pm.
Progress and Status COMPANY SWITCHES INSTALLED A/V CABLE INSTALLED THEATRICAL CABLE INSTALLED ORCHESTRA LIFT IS OPERATIONAL STAGE.
Standards for Rehabilitation
CAPITOL COMPLEX MULTIPLE PROJECT UPDATE. OBJECTIVES Overview of Scheduled Capitol Complex Projects Review of Various Projects Locations Scopes of Work.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
SUNY Canton Facilities Project Update Miscellaneous.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
WESLEYAN P BID PACKAGE #19
October 2009 Construction Progress. University City School District Bond Wolfe Architects – architect McCarthy Construction – construction manager Barbara.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
Glen Ridge Free Public Library Capital Needs for Bonding Consideration January 2007 Children’s Room, early 1920s.
Instructor: J. S. Gretsuk.  24 state of the art computers  Drafting table work stations  Laser Printer  Color Plotter  Blueprint Machine.
3. The Roof Has Problems If the roof has water damage, it may be caused by old or damaged shingles, or improper flashing. It's cheap and relatively easy.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
General Contractors  Over 10 years of Service  Commercial  Military Institutions  Government Agencies  Female Owned and Operated Firm  Teamed with.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
On-the-Workforce Training Status  Plan for Jobs to be created: 300  Jobs Created to Date: 233  Tentative Selection for Hire to date: 201  Re-Advertised.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Frank c. havens elementary school CONCEPT DESIGN II Refinement of hybrid October 24, 2007 R. P. Gallagher Associates Structural Engineers.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
Community Meeting September 9, 2015 COMMUNITY CENTER IMPROVEMENT PROJECT BENNING PARK COMMUNITY CENTER.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Capital Reserves. What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs – Stormwater pond repair,
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Orthographic Drawings
Plans to achieve our goals were approved unanimously by the Temple Board on June 11, 2008, and by the congregational meeting on June 22nd without a dissenting.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Ontario School Boards 72 district school boards in Ontario Approximately 4,900 schools TDSB presently operates 551 active schools Approximately 11.3% of.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Gates County Schools Maintenance Department Maintaining and Renovating Today’s Schools For Tomorrow’s Students.
REQUEST FOR GRANT TO Kenai Mountains-Turnagain Arm Board of Directors.
1 City of Portland Bureau of Development Services Staff Presentation to the Portland Landmarks Commission Historic Design Review LU HDZ Appeal.
Presentation Title Here Additional Line if Needed Date Here Eden Park Pump Station Building Assessment Strategic Growth Committee June 26, 2012.
Welcome to the Stafford Elementary Town Hall Meeting! January 12, :30-7:30 pm Mary W. Foreman, Stafford Elementary Principal Alexis White, Stafford.
Introduction to Elevations
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Buy Online RV Exterior Led Lights at Affordable Price
Buy RV, Trailer & Motorhome LED Interior Lighting Fixtures: Free Shipping
Old world craftsmanship... timeless beauty.
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Introduction to Elevations
Northwood Lakes Condo Association
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
House Construction Budget Plan
Building & Property Committee
Downtown Building Improvement program
Certificate of Appropriateness 528 E 14th Avenue Folsom House
Capital Outlay Workshop
Repair roof rafters / joists, soffit and fascia boards in this area.
Community Practice Asset Management.
ENGINEERING PERFORMANCE STANDARD
The Edge Extreme Makeover.
Presentation transcript:

Stone Avenue Train Station Renovation Project Board Workshop June 7, 2010

Agenda Overview Status of Project Development Presentation – Revised Scope of Work and Cost Estimates Necessary Renovations Potential Upgrades Discussion Village Board Consensus and Direction

Team Introductions Marc Rohde, AIA, LEED AP, Legat Architects Patrick Davis, LEED AP, Senior Estimator, Mortenson

Existing Station and Platform Aerial Perspective

Current Conditions Existing Site and Floor Plan

Current Conditions Existing Building Elevations

Necessary Renovations Existions – Train Station

Necessary Renovations Existing Conditions – Outbound Platform

Necessary Renovations Existing Conditions - Site

Proposed Building and Platform Renovations - Repair and paint plaster walls and ceiling - Replace wood trim, fascia, moldings, and soffits with historically accurate no maintenance material - Consider additional period appropriate detail work inside station - Replace existing exterior windows & doors with historically accurate replacements units - Replace existing interior & exterior light fixtures with new, energy efficient, historically accurate light fixtures - Fabricate new exterior signage at the inbound station and outbound platform - Replace exterior gallery flooring with brick pavers around platform Plaster Repairing Tools Source: NPS files Repointing using mortar Photo: John Speweik

Necessary Renovations 1. New Aluminum Doors and Frames

Necessary Renovations 2. New Gutters, Downspouts, Roofing and Fascia

Necessary Renovations 3. New Aluminum Windows

Necessary Renovations 4. New Light Fixtures

Necessary Renovations 5. Basic Interior Upgrades

Necessary Renovations 6. Clean and Repair Exterior Masonry and Stone

Necessary Renovations 7. Replace Deteriorated Beadboard Soffit

Necessary Renovations 8. Provide ADA Compliant Ramps

Necessary Renovations 9. Brick Pavers at Outbound Shelter

Discussion and Consensus

The Next Steps Finalize conceptual scope of work Design Project (plans, specifications, bids) Continue to Pursue Grant Funding Opportunities Continue to coordinate design and grant agreement process with Metra / BNSF

Questions & Answers