Presentation is loading. Please wait.

Presentation is loading. Please wait.

NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.

Similar presentations


Presentation on theme: "NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction."— Presentation transcript:

1 NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y SKS-1 SKS-2 MAJOR MAINTENANCE FY 14 BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES DATE: 06/11/13

2 REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y SKS-3 DATE: 06/11/13SKETCH NO. NOTE: REMOVE EXISTING FLOOR AND FASCIA BOARDS AS REQUIRED TO COMPLETE THE WORK, REPLACE THE TONGUE & GROOVE DECKING AND FASCIA BOARDS TO THE LIMITS SHOWN ON THE PHOTO SHEETS. BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

3 REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y SKS-4 DATE: 06/11/13SKETCH NO. BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

4 NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-103-1 DATE: 06/11/13 INSTALL NEW PIER. PLUMB & LEVEL COLUMN ABOVE PIER. REMOVE / REINSTALL EXISTING RAILINGS AS REQUIRED EAST ELEVATION SOUTH ELEVATION BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

5 PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-103-2 DATE: 06/11/13 REMOVE EXISTING FRAMING AND REFRAME AS REQUIRED TO COMPLETE THE WORK. REPLACE EXISTING FASCIA BOARD. BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

6 PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-103-3 DATE: 06/11/13 BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

7 PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-103-4 DATE: 06/11/13 BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

8 PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-103-5 DATE: 06/11/13 INSTALL NEW TONGUE & GROOVE DECKING TO THE LIMITS SHOWN. INSTALLATION SHALL RUN UNDER THE RAILINGS TO THE EXTERIOR FASCIA BOARDS FOR A COMPLETE REPLACEMENT IN THIS AREA. ALL NEW DECKING SHALL RUN PERPENDICULAR TO THE JOISTS. THIS AREA ALSO IDENTIFIES THE LIMITS OF THE NEW FASCIA BOARDS TO BE INSTALLED. BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES

9 PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-103-6 DATE: 06/11/13 BID PACKAGE #21 200 HIGH ST – MASONRY PIER REPLACEMENT / CARPENTRY REPAIRS SECTION 00020 – STRUCTURAL REPAIR SKETCHES


Download ppt "NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction."

Similar presentations


Ads by Google