Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.

Slides:



Advertisements
Similar presentations
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Advertisements

D EVELOPMENT & T ESTING : ADC BOARD FOR THE P ROMETEO T EST - BENCH MATTHEW SPOOR University of the Witwatersrand HEPP 2015.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Calorimeter upgrade meeting Olivier Duarte Upgrade calo FE review Comments : Digital.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
Design & test of SciFi FEB
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Status of NA62 straw electronics Webs Covers Services Readout.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
1 April 2009 NA62 DAQ meeting1 LKr calorimeter readout project H.Boterenbrood, A.Ceccucci, B.Hallgren, M.Piccini, H. Wendler.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
LHCb Calorimeter Meeting – 2 nd December 2015 Calorimeter upgrade update Universitat de Barcelona, Institut de Ciències del Cosmos ICC-UB Laboratoirede.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
New digital readout of HFRAMDON neutron counters Proposal Version 2.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
GPL Board Pattern Generator for the Level-0 Decision Unit Hervé Chanal, Rémi Cornat, Emmanuel Delage, Olivier Deschamps, Julien Laubser, Jacques Lecoq,
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Calorimeter Outline: Detector status Calibration Upgrade Yu. Guz, IHEP, Protvino.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
D. Breton, S. Simion February 2012
Calorimeter Mu2e Development electronics Front-end Review
Analog FE circuitry simulation
TVB TVB X 14 TRIG40 (tell40 structure) Selection board in barrack
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Mini-drawers, FE-ASIC , Integrator
Calorimeter Upgrade Meeting - News
Presentation transcript:

Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware. Proposal of the LEDTSB board adaptation in a new upgraded FEB crate Planning of the CALO slow control upgrade LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov Status of the CALO slow control upgrade for HV, LED and Cs calibration systems

Upgrade status of the ECAL/HCAL HV control mezzanine board;  New control mezzanine board based on IGLOO2 FPGA was developed for usage with the HV and HCAL Cs calibration systems;  Two prototype boards were produced and assembled ;  Photo of the new mezzanine board in the left;  Firmware for the HV system FPGA has been redesigned and simulated;  The functional tests of these mezzanines were started in February and now near finish. LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov Block-diagram of the High Voltage and LED intensity control signal and power supply distribution board (HV_LED_DAC). Reminder: HV_LED_DAC board Specification. Readout of the control voltages is implemented on the board by two ADCs. The DCU-ADC (on SPECS mezzanine board) readouts the HV control signals and VFC-ADC (on the mother board) readouts the LED intensity control signals. Outputs 200 outputs for the CW base control voltage distribution in range from 0 to 5 V with 12 bit precision. 8 outputs of the stabilized LV and +100 V power supplies for feeding the 8 groups of the CW bases. Voltages for CW base power: 1) +5.8 V, -5.8 V protected by fuses; 2) +100 V protected by relays. 8 connectors for distribution 16 LED intensity control signals in range from 0 V to +5 V with 12 bit precision and powering LED-PIN boards. Voltages for LED-PIN board: 1) +15 V for LED driver; 2) -30 V, +5.8 V, -5.8 V for PIN diode amplifier. Will be replaced with GBT-SCA mezzanine Will be replaced with IGLOO2 Control mezzanine

Upgrade status of the ECAL/HCAL HV control mezzanine board LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov Top level of the Smart Design diagram for the HV-LED intensity control project. Microsemi M2GL010-1FGG484 FPGA Firmware design was implemented with MicroSemi Libero SoC v11.5

Upgrade status of the ECAL/HCAL HV control mezzanine board LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov Setup for making the full functional tests of the new mezzanine with a CALO HV-LED control board

Upgrade status of the ECAL/HCAL HV control mezzanine board LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov Powerful software has been developed for making the functional tests of the new mezzanine with a CALO HV- LED control board. Finally one HV-LED_DAC board equipped with a new control mezzanine has been tested in the LHCb pit. All tests were passed except one with block transfer to memory. List of the validation tests used for debugging FPGA firmware. Example of the output plots of the linearity test (ADC counts versus DAC converter value) Nonlinearity Linearity HV channel LED channel

The LEDTSB boards will use the infrastructure of the FEB crate where they are installed.  In particular, they should use the Channel-B control lines of the crate to make synchronisation with LHC timing.  In the same time, as mentioned by LAL people, the slow control bus (as SPECS) and +5 V / -5V volt power is not foreseen in new FEB crate. CALO DCS – LEDTSB boards Proposal The LEDTSB boards have to be modified: 1.SPECS should be replaced by GBT-SCA mezzanine with e-link, a mini HDMI connector at the front panel could be used as e-link connector and -5V power will be needed for calibration LEDTSB (this is the procedure which will be done at the beginning of operation). As we will not have ±5V lines in future crates, we can arrange powering during the calibration, e.g., using a laboratory power supply. Proposal of the LEDTSB board adaptation into a new FEB crate LHCb calorimeter upgrade meeting 28/01/2016 Y. Guz, A. Konoplyannikov

Proposal of the LEDTSB board adaptation in a new FEB crates LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov Features: Dimension: 15 x 10 x 2mm (approx.) Weight: 1g Package Content: Mini HDMI Male C Type SMT+PCB Connector Possible implementation HDMI connector of e-Link -5V cable +5V cable GBT-SCA HDMI cable of e-Link LEDTSB

Planning of the CALO slow control upgrade LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov  Finish firmware debugging of the HV project in one week;  Start firmware design for HCAL Cs calibration system;  Start development of the GBT-SCA mezzanine for the SPECS mezzanine replacement PCB board design; Firmware design;  Learn software for using proposed system with MiniDAQ (planning to participate in the session of the MiniDAQ tutorial)

LHCb calorimeter upgrade meeting 2/03/2016. A. Konoplyannikov spares CALO DCS – HV-LED and INTEG boards GBTX fan-out board with VLDB Optical Link E-Link HV-LED board