Nicola Bacchetta September 24, 02 DOE review1 Baseline Readiness Review September 24, 2002 Nicola Bacchetta INFN-Padova and Fermilab Run IIB Silicon Project.

Slides:



Advertisements
Similar presentations
10/24/2003Yu Chul Yang(CHEP,KNU) Layer0 Prototype Test Abstract,,,,,,,, Shabeer Ahmad Mian( ),,,, ( ),,, ( ). We have carried out prototype test for Silicon.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
ISL David Stuart, UC Santa Barbara May 11, 2006 David Stuart, UC Santa Barbara May 11, 2006.
For high fluence, good S/N ratio thanks to: Single strip leakage current I leak  95nA at T  -5C Interstrip capacitance  3pF SVX4 chip 10 modules fully.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
C. Haber 6-Mar-08 Integrated Stave Electrical/Mechanics/Cooling Update March 6, 2008.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Andrei Nomerotski, Fermilab Silicon Electronics & Readout Silicon Electronics & Readout Andrei Nomerotski, D0/Fermilab April , Temple Review Overview.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
Vertex ‘99, 6/21-25/1999 p. 1 CDF Run II SiliconAlan Sill, Texas Tech University CDF Run II Silicon Tracking Projects 8th INTERNATIONAL WORKSHOP ON VERTEX.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Brenna Flaugher Sept. 24 th Lehman Review1 Run IIB Silicon Upgrade: Cost and Schedule Lehman Review Sept. 24, 2002 Brenna Flaugher Run IIB Silicon Project.
CLAS12 Drift Chamber Prototyping
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
DOE Rev of Run IIb Sep 24-26, Run IIb Silicon Mechanical Design  Run IIa and IIb geometries  Sensor dimensions, numbers, and drawings  Hybrids,
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
R. Lipton Vertex ‘98 Santorini, Greece The D0 Silicon Microstrip Tracker (D0SMT) Outline  Design  Detector Studies Coupling capacitors Radiation Damage.
Run2b Silicon Detector Design goals of Run2b Si system Stave design Silicon sensors Schedule K. Hara (U. Tsukuba)
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Dzero Collaboration Meeting, Sept. 14, M. DemarteauEric Flattum - Fermilab 1 Slide 1 Alice Bean Fermilab/University of Kansas for the D0 Run2b silicon.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Si Sensors for Additional Tracker
Markus Friedl (HEPHY Vienna)
Status of the CDF II silicon tracking system
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
FNAL Production Experience
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

Nicola Bacchetta September 24, 02 DOE review1 Baseline Readiness Review September 24, 2002 Nicola Bacchetta INFN-Padova and Fermilab Run IIB Silicon Project Co-leader For the CDF collaboration Run IIb Silicon Upgrade: Technical Presentation

Nicola Bacchetta September 24, 02 DOE review2 Run IIb Silicon - Outline uOverview of Goals and Constraints uLayout uStave Concept uComponent Details uL0 design uConclusions

Nicola Bacchetta September 24, 02 DOE review3 uIn the fall 2000 a working group was formed to calculate the longevity of the IIa silicon detector èIIa cannot survive above ~4 fb -1 uRadiation damage consequences with the new detector: èSensors should operate at high voltage(~350V). èSensors should be directly cooled (~-5C) èIC circuits in the detectors need higher level of radiation tolerance. uTo cope with higher doses during runIIb we need: èNew readout chip (1/4um tech.) èSingle sided sensors operating at high voltage èNew H/L voltage distribution system èNeed to directly cool the silicon uPresent technology allows all of the above to be achieved. Radiation Tolerance Implications IIb conditions:  L = 2-4  cm -2 sec -1 at 396ns or L = 5  cm -2 sec -1 at 132ns  ∫L = 15fb-1

Nicola Bacchetta September 24, 02 DOE review4 Silicon Upgrade for Run IIb uDesign Goals: èRobust, simple, flexible and reliable design èMinimize the cost èMatch or exceed performance of Run IIa silicon detector èMinimize changes to infrastructure: DAQ or cooling systems èIntegrate CDF experience from SVX, SVX’ and SVXII èPursue common solutions with D0: –Svx4 chip –Technology of silicon –Direct cooling –Hybrid technology –L0 technology

Nicola Bacchetta September 24, 02 DOE review5 RunIIb Layout uFinal layout choices are the results of many internal reviews with inputs also from Laboratory committees. uMain Layout Choices: è6-fold symmetry è1 stave design for all 5 outer layers èFill all space available up to ISL èMaximum flexibility in the choice of Axial/Stereo layers èInnermost layer (L0) similar to the present L00

Nicola Bacchetta September 24, 02 DOE review6 Run IIb Layout Details 94% of sensors and hybrids are 4-chip

Nicola Bacchetta September 24, 02 DOE review7 RunIIb Layout uEmphasis on simplicity and flexibility u Easy to be mass produced uMinimum number of parts: è1 hybrid (4 chips) è2 sensors (axial and stereo) Single stave design: èMinimize R&D èMinimize tooling èMinimize production time Carbon fiber bulk-heads with inserts for precision alignment of staves

Nicola Bacchetta September 24, 02 DOE review8 Stave: conceptual view Mounting holes Chips Hybrid Pitch Adapter Cooling tubes Wing Cable Mini PC Mounts Sensors 2 sensors + hybrid = 1 module 3 modules per side 1 MPC per stave 1 readout unit per stave Stave is 66 cm long

Nicola Bacchetta September 24, 02 DOE review9 Stave:end view Hybrid electronics Foam core Peek Cooling channels 2.9 x 5.6 mm Silicon Sensors 4mm separation Material/stave:  1.8% RL  124 grams Fraction of Total RL:  Sensors 39%  Hybrids 13%  Bus Cable 17%  CF/Coolant 29%

Nicola Bacchetta September 24, 02 DOE review10 Stave:cooling issues uTemperature specs for silicon: èKeep silicon cool to limit the amount of noise increase due to leakage current and limit the reverse annealing effect èStudies of these effects set temperature limits: –Layers 4-5: T<15 o C –Layers 2 and 3: T<10 o C –Layers 0 and 1: T<-5 o C èRequires active cooling of silicon uStave design incorporates cooling tubes (Peek) which meet specs uTotal heat load very similar to Run IIa ~3KW uPlan to use existing cooling system with increased glycol concentration (43%) for operation at -15 o C

Nicola Bacchetta September 24, 02 DOE review11 Barrel assembly Outer Bulkhead 2 mm thick CF (z = 66 cm) Inner Bulkhead 1 mm thick CF (z = 0 cm)

Nicola Bacchetta September 24, 02 DOE review12 Barrel in Spacetube z = 0 z = 66 cm z = 100cm Spacetube (CF +core) Similar to Run IIa Two half cylinders – glued together Supports weight of barrels Attaches to mount points on ISL end flanges

Nicola Bacchetta September 24, 02 DOE review13 Layer 0 Design uInner Layer (L0) follows Run IIa L00 design: èSmallest possible pitch – 25/50 micron pitch èFine pitch cables connect sensors to hybrids èHybrids are located out of tracking volume (~z=70cm) èPositioned at small radius (2.1 cm) èHybrids ~similar to outer layer, but 2 chips èWill be supported by outer barrel (not beampipe) uLow mass construction is of utmost importance for 1 st measurement uSensors are identical to L00 sensors uCables: èAll cables designed and the longest has been fabricated by KeyCom (Japan) èSome technical issues with the L0 cable sorted out BUT yield must be improved èWe are pursuing other possible vendors with also the option of splicing the cable.

Nicola Bacchetta September 24, 02 DOE review14 L0 Layout Sensors Fine pitch cables  Max. length 59cm  100um pitch  50um pitch at ends Hybrids Beampipe and CF support Cooling tubes L0 Module - 2 sensors + Fine pitch cables + one hybrid = one readout unit

Nicola Bacchetta September 24, 02 DOE review15 L0 hybrids and cables Cable flare out in radius (to ~4cm) after passing through bulkhead Cables from successive modules pass underneath hybrids from lower z modules Cooling tubes integrated into hybrid support structure

Nicola Bacchetta September 24, 02 DOE review16 Run IIb Status –outer layers uOur r&d effort pivots on the stave tests uAll stave prototype parts are in hand: èPrototype sensors èPrototype Hybrids èPrototype module fixtures are ready and tested èPrototype Bus cables èPCB version of the mini Port Card (BeO version expected at the end of September) èPrototype stave cores èTest Stands (= final DAQ system) are ready and used for testing uMain point is to verify the noise coupling between the Silicon and the Bus Cable. uExpecting results in late October  2 Prototype modules built (9/13)

Nicola Bacchetta September 24, 02 DOE review17 Silicon Sensors All detectors are single sided and based on the high voltage operation layout (CMS,ATLAS,L00) èEasy to build, test and handle èMinimal R&D necessary èPrototype (identical to final sensors) already in hand èHigh yield and high quality (0% bad channels grade “A” and 0.07% grade “B”) èFull charcterization in progress (radiation damage studies in early October)

Nicola Bacchetta September 24, 02 DOE review18 SVX4 chip uIt is a 0.25um translation of the SVX3d chip uDesign started in fall 2000 as a collaboration between LBL, FNAL and INFN-Padova. B.Krieger (LBL) lead engineer. u1st full prototype submission in April ‘02 uChip back in June ‘02 èTested both at LBL and FNAL èNo major problems found (so far) èSome adjustment required to meet production quality

Nicola Bacchetta September 24, 02 DOE review19 Hybrids uHybrids are fabricated on a Beryllium Oxide substrate for improved thermal performance and long radiation length. uHybrid layout uses advanced fine pitch technology for reduced area. uIntegrate SVX-II (a) experience into design, materials choices, and components to enhance reliability and simplify fabrication, assembly, and test. uHybrid appears to work with no apparent problem seen yet. uSVX4 chip performance on hybrid same as single chip on test board.

Nicola Bacchetta September 24, 02 DOE review20 Mini Port Card uUses the same BeO substrate as the hybrid uConnects to the top and bottom bus cable (directly and via a foldable “wing”cable) uControls all data, commands and power going in/out of the stave uAn FR4 version has been produced to allow start of electrical stave tests. uBeO prototype expected by end of September u5 transceiver chips are mounted for data control uTransceiver: èA new (0.25um) transceiver chip has been designed and submitted to MOSIS èNew transceiver simplifies connectivity and eliminates the need for an extra power line èNew transceiver fits in the silicon space left over by the svx4 chip èMPC is also compatible with the old transceiver which we have already plenty left over from IIa

Nicola Bacchetta September 24, 02 DOE review21 Module uFirst two modules fully assembled uMechanical procedures are satisfactory uPreliminary results confirm our expectations.

Nicola Bacchetta September 24, 02 DOE review22 Summary of Run IIb design uNew naturally Radiation hard chip required for Run IIb luminosity. èPrototype is in hand and functioning well! uDAQ simplified wrt Run IIa èNo optical components èNew Power Supplies: off-the-shelf, not custom èNumber of readout chains (252) much lower than available in existing infrastructure (408): more spare parts will be available ! uUniform stave design for ~94% of the detector èOnly one type of fixturing to develop for outer layers èL0 ~ L00 type construction uSmall number of different style parts èOnly 2 types of hybrids – 4 chip on outer layers, 2 chip on Layer 0 èL1-5 have 2 sensor types (axial and small angle) èL0 sensors = L00 sensors.

Nicola Bacchetta September 24, 02 DOE review23 Conclusions uGreat effort put into design simplification, ease of construction and low risk technology uDesign relies heavily on experience with previous silicon detectors at CDF (SVX, SVX’, SVXIIa, L00 and ISL) uWe expect the total mass in the tracking volume to be below the present value in spite of the increased number of sensors and need for direct cooling uDAQ simplified, active components are more accessible uAll prototype parts are in hand and testing is under way uPreliminary test results agree with expectations!