Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Status Report Linac Startup plans 12/05/2012.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (Joe Compton - shutdown) – Additional Meetings/Notes.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
ORBUMP Power Supply... 16x3 SCR’s Pulse Forming Network (PFN) - looks like a very slow transmission line. Flat top ~ (10 usec)*(number of cells). Reduced.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Source Meeting, August 8, 2003 – E. Prebys 1 Major Projects in Linac/Booster  New Linac Lambertson  (4) New EDWA magnets in MI-8 line  (3) New.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PIP Update July 29 th Agenda Summary Update – Current Activities – Updates Tom Kubicki (Station 20,21,22 – Gallery and Equipment Work) – Additional.
PIP Update August 12 th Agenda Summary Update Current Activities Update – Ryan Crawford - Booster Anode Power Supplies – Dave Johnson - Laser Notcher.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Proton Economics Eric Prebys FNAL Accelerator Division.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Presentation transcript:

Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…

Booster Status, September 4, 2003 – E. Prebys 2 Collimator Status  Collimators complete and fiducialized.  Finalizing our grouting/leveling procedure.  Must wait until beam pipe is out to complete ALARA plan.

Booster Status, September 4, 2003 – E. Prebys 3 Other Projects  L3 Work  New dogleg stands arrived today at IB-2  Magnets should be ready to in about end of next week.  New C-magnet and hanger stand design complete and being fabricated.  Scheduled for 4 th week of shutdown.  Prototype RF Cavities  Power tests and characterizations under way.  Still scheduled for installation in 8 th week of shutdown.  Lambertson and EDWA installation.  Very good shape except for radiation concerns.  All other projects.  No real worries.

Booster Status, September 4, 2003 – E. Prebys 4 SunMonTueWedThuFriSat Sept Oct Lambertson (LInac Tunnel) Collimators (with ironworkers) – Assumes collimators have been assembled in access bay! Collimators (ironworkers move to EDWA installation) EDWA Installation Dogleg Modification at Long 3 Install Damper Cavity BOOSTER OFF- Cool down and miscellaneous prep work Proton Source Shutdown Schedule Prep L6 and L3 for collimator placement

Booster Status, September 4, 2003 – E. Prebys 5 SunMonTueWedThuFriSat Oct Nov Install Prototype RF Cavities Commissioning and Studies. Test MI-8 extraction on weekend. Commissioning and Studies. Possible weekend extraction tests. Return to normal operation Shutdown Schedule (cont’d) Vertically align Booster

Booster Status, September 4, 2003 – E. Prebys 6 ORBUMP Issues  New SCR-network and charging supply controller will not be ready until probably December.  Recent flow restrictor replacements have greatly reduced the operating temperature.  (Original) capacitors are beginning to leak oil.  Still seem to work.  Full set of replacements coming over the shutdown.  Must investigate a longer term solution.  Over the shutdown, we will add some plastic baffles to reduce the effect of water line breaks.  -> We feel we can push the supply to the 6.5 Hz needed by full MiniBooNE operation when called upon to do so.

Booster Status, September 4, 2003 – E. Prebys 7 What to expect after the shutdown  We think there’s a good chance that after the 10-week shutdown, we will be able to deliver “more” beam to MiniBooNE than we do now. This statement is based on our experience in the Feb. “dead dog” test, and our experience with the prototype collimator system.  Optimizing the system will take some time  Tuning new lattice  Commissioning collimator system  Establishing new safety protocols without power meter (B:BPL5MA).  Estimate 2-3 months to approach full performance.  We’re “cautiously optimistic” that this full performance will be the MiniBooNE baseline request.