Eastern Alberta Trade Corridor - Local to Global Forum – Port of Wild Horse Business Plan - Status Report - PROLOG Canada Inc. The Van Horne Institute.

Slides:



Advertisements
Similar presentations
Oregon 62: I-5 to Dutton Rd. (Medford) Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
Advertisements

Oregon 62: I-5 to Dutton Rd. (Medford) for Jackson County Planning Commission May 9, 2013.
La Entrada al Pacifico: Potential Impacts on Communities Border to Border Conference April 18, 2007 McAllen, Texas.
Idaho/Canada Border Issues Transportation Border Working Group Meeting Coeur d’Alene, ID April 22-23, 2008.
OnRouteBC Project Update November 17, 2014 By: Ministry of Transportation and Infrastructure for The BC Trucking Association 1.
PUBLIC BORDER OPERATORS ASSOCIATION BORDER INFRASTRUCTURE PROJECT UPDATES Canada – United States Transportation Border Working Group Meeting Vancouver,
1 Canada Border Services Agency Transportation Border Working Group - Border Infrastructure Updates Quebec City October, 2010.
Border Infrastructure Project Updates Transportation Border Working Group – November , Ottawa, Ontario.
Dan O’Neal, Chairman Washington State Transportation Commission.
Transportation Border Working Group Montreal October 22 and 23, 2013 CBSA Project Update.
Transportation Border Working Group Chicago Plenary - Ottawa Update April 29, 2009 Ted Mackay, Transport Canada.
Freight Data - A Transportation Perspective September 2010 Michael Sprung – FHWA, Office of Freight Management and Operations.
1 Evaluation of Ports of Entry (POE) for the International Border in the El Paso MPO Study Area.
Transportation Border Working Group Border Infrastructure update Ministère des Transports du Québec October 27 th Québec.
An Opportunity for Sustainable Investment
-TRED Study Overview- Director Jim Lynch Montana Department of Transportation January 28, 2006 Glasgow, MT.
Transportation Development Division Oregon Integrated Land Use and Transportation Models Part 1: Statewide Model Part 2: MetroScope Part 3: Land Use Scenario.
Bruce Warner, Director Oregon Department of Transportation A Bi-State Project: Lessons Learned.
INTERNATIONAL RELATIONS OFFICE. What is the International Relations Office? 2 T he Office was created in 1994 in response to the North American Free Trade.
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Canada Auto industry Part 2. Historical Maps
Cross Border Rail Passenger Service Transportation Border Working Group Buffalo, New York – April 8, 2014.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Montana Ambassadors Helena, Montana February 25, 2011.
REGIONAL FREIGHT PERSPECTIVES: QUESTIONS ABOUT THE FUTURE OF VOLUMES Bill Anderson Ontario Research Chair in Cross-Border Transportation.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
U.S. Department of Transportation Federal Highway Administration Transport Transports Canada Canada Transportation Border Working Group New York State.
California Marine Transportation System: Challenges and Potential Solutions Presented to: Western Cargo Conference San Diego, CA October 16, 2004 Gill.
The Cumulative Impact of the U.S. Land Border Customs and Security Measures on the Canadian Trucking Industry Presentation to Transportation Border Working.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
Transportation Border Working Group Rob Tardif Ontario Ministry of Transportation Action Plan Working Sessions: Border Data Action Plan Working Sessions:
A Generic Model of Motor- Carrier Fuel Optimization Yoshinori Suzuki.
Canada Border Services Agency Update Presentation to: Transportation Border Working Group Bellingham, Washington June 7, 2006.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
Engaging Freight and Supply Chain Representatives in Public Sector Projects.
PRAIRIE CREEK MINE: ALL SEASON ROAD ENVIRONMENTAL ASSESSMENT SCOPING June, 2014 June, 2014 PRAIRIE CREEK MINE: ALL SEASON ROAD ENVIRONMENTAL ASSESSMENT.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
5 th Bi-Annual Border to Border Conference Performance Measures at Commercial Ports of Entry Juan Carlos Villa.
Regional Border Infrastructure Update SR 539 / Lynden-Aldergrove Port of Entry Improvements Todd Carlson Planning and Engineering Services Canada-United.
Interstate 95 Corridor Improvement Program June 20, 2012.
Estimating Economic Impacts of Border Wait Times in the San Diego-Baja California Region February 24, 2006.
Regional Goods Movement Study for the San Francisco Bay Area presented by Michael J. Fischer Cambridge Systematics, Inc. November 12, 2004 Agenda Item.
Public Border Operators Association Border Infrastructure Project Updates United States – Canada Transportation Border Working Group Meeting October 27.
Transport Development and Trade Facilitation World Bank – UNOHRLLS June 13th
MEXICO’S NORTHERN ECONOMIC CORRIDOR November, 2014.
Canada’s Asia-Pacific Gateway and Corridor Initiative 2006.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
October 23rd 2013 Ministère des Transports du Québec (MTQ) involvement at the Canada / United States border Transportation Border Working Group.
Trusted Trader Initiatives - Beyond the Border Action Plan Transportation Border Working Group April 17, 2012.
21 st Annual International EMME Users Conference EMME Users Conference 12 October, 2007 Modelling Needs of Peel Region in the Context of the Emerging.
World Bank Transport Knowledge and Learning Program on ITS Cross Regional Cooperation and Freight and Logistics Applications June 22, 2010 I ntelligent.
PORT IMPROVEMENT PROJECTS AT SAN LUIS/SAN LUIS RIO COLORADO CONGRESSIONAL BORDER BRIEFING PHOENIX, ARIZONA NOVEMBER 3, 2015 A Key Gateway for Trade, Tourism.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Darrin Roth American Trucking Associations, Inc. INTERNATIONAL SYMPOSIUM ON ROAD PRICING.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
1 Forecasting Traffic for a Start-Up Toll Road 12 th TRB National Transportation Planning Application Conference May 18, 2009 David Schellinger, P.E. Vice.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Objective Transportation Assets Strategic Intermodal/International Points Next Steps & Discussion Critical Issues for Ohio.
Illinois Intrastate Shuttle Sponsor: America’s Central Port, Granite City, Illinois Route: M-55 Marine Highway Route (Illinois River) Project Snapshot:
February 19, 2007 Unsolicited New Mississippi River Bridge Public-Private Partnership Proposal presented to the Missouri Department of Transportation June.
Transportation Border Working Group - Vancouver October 21 and 22, 2014 CBSA Infrastructure Project Update.
New Brunswick / Maine Border Crossings Trans Border Working Group June 11, 2003 Burlington, VT.
The I-465 West Leg Reconstruction Project
A Bi-State Project: Lessons Learned
New Generation Wide Based Single Tires by Kim Durdle, P. Eng
Ministry of Transport Viet Nam
NVCOG Regional Transportation
Downtown Valdosta Truck Traffic Mitigation Study
Acton Extension Update
Presentation transcript:

Eastern Alberta Trade Corridor - Local to Global Forum – Port of Wild Horse Business Plan - Status Report - PROLOG Canada Inc. The Van Horne Institute Medicine Hat, Alberta March 10, 2016

Port of Wild Horse Business Plan PROLOG Canada Inc. & The Van Horne Institute - have been retained by - The Palliser Economic Partnership & Bearpaw Development Corporation To investigate the potential to stimulate economic activity in Southeast Alberta and Northern Montana through extended operating hours and/or enhanced services at the Port of Wild Horse

Port of Wild Horse Business Plan Study objectives: To prepare a business case for service improvements at the Port of Wild Horse: Hours of operation Commercial port facilities Highway approaches To thereby stimulate economic activity in both Southeast Alberta and Northern Montana.

Port of Wild Horse Business Plan Study tasks: 1.Research relevant studies and reports. 2.Visit existing facilities, contiguous regions and supporting highway systems. 3.Conduct user group surveys, i.e. truckers, agricultural sector. 4.Conduct stakeholder interviews. 5.Prepare a case for service improvements. 6.Specify proposed improvements and staging thereof.

Port of Wild Horse Business Plan Existing Wild Horse operation: Restricted hours: –May-Sept: 8:00AM to 9:00PM –Oct-May: 8:00AM to 5:00PM –vs 24/7 year-round at Coutts/Sweetgrass Permit (pre-approved) port – no inspection facilities 2-lane approaches at W.H. vs 4-lane + Interstate at Coutts/Sweetgrass 2-way truck traffic: ±3,000/year

Port of Wild Horse Business Plan Desired improvements: Extended hours, e.g. Summer hours (8:00AM-9:00PM) year- round. Commercial port facilities. Joint Canada/U.S. facility à la Coutts/Sweetgrass for cost savings. Improved highway approaches. Planned CBSA improvements – timing unknown: $114 million targeted to Prairie Ports. New modular operations building. Staff housing to overcome commuting.

Port of Wild Horse Business Plan Proposed CBSA improvements: $114 million targeted for 77 Prairie ports. New modular operations building at Wild Horse. New staff housing at Wild Horse to minimize commuting. Timing of improvements unknown.

Port of Wild Horse Business Plan Traffic by the numbers (2012): 94.5% of all trade by truck over the Canada-Montana border was handled at Coutts/Sweetgrass. 28% of the trade destined for Alberta originated in Texas. 12% of the trade originating in Alberta was destined for Texas.

Port of Wild Horse Business Plan COMPARATIVE ROAD DISTANCES: Duluth-Wild Horse1,530 km Duluth-Coutts/Sweetgrass1,680 Houston-Wild Horse2,980 Houston-Coutts/Sweetgrass3,060 Denver-Wild Horse1,360 Denver-Coutts/Sweetgrass1,440 Salt Lake City – Wild Horse1,170 Salt Lake City-Coutts/Sweetgrass1,110

Port of Wild Horse Business Plan Preliminary truck survey findings: Extended hours at W.H. is expected to attract more truck traffic Expected traffic diversion rates to W.H. with extended hours varies by carrier from 5% to 50% One carrier alone would divert 1,250 annual crossings Each W.H. crossing from points east of Havre would result in $750 truck trip savings vs Coutts Greater use of W.H. should seek harmonized truck size and weight regulations as over Coutts to Shelby

Port of Wild Horse Business Plan A Billings based trucker hauling fertilizer for CF would divert 50% of its traffic to W.H. if hours extended A propane carrier in Malta, MT, uses 232/41 for all its business, 200 loads/yr. Shortest route to Medicine Hat. Supports extended hours. Carriers more inclined to use Hwys 41 and 232 if road improved between Havre and TransCanada Hwy, i.e. shoulders and ditches Carriers also identified need for more pull-outs and better winter road maintenance Several carriers expressed concern about Hwy 41 at Elkwater, particularly in winter 2,500 additional diverted trips over W.H. would generate $1.5 million in trucking cost savings

HIGHWAY 41- SOUTH OF TCH HIGHWAY 41 – SOUTH OF TCH NEAR PORT OF WILD HORSE

CANADIAN PORT OF ENTRY – WILD HORSE

U.S. PORT OF ENTRY – WILD HORSE

HIGHWAY 41 – NORTH OF TCH

SOUTH SASKATCHEWAN BRIDGE – HWY 41

Port of Wild Horse Business Plan Conclusions: We will build a business case for service upgrades at the Port of Wild Horse that: Will be based on the findings of our research, surveys and interviews; Will be designed to attract more traffic to the Wild Horse crossing; Will be based on fiscal realities; and May be phased in over time.