State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.

Slides:



Advertisements
Similar presentations
1 FM 2499 From: Spinks Road To: FM 1171 PUBLIC HEARING November 16, 2004.
Advertisements

Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
I 65 Added Travel Lanes Project Clark County Ivy Tech Community College Thursday, March 12, 2015.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
New I-65 Interchange at Worthsville Road Welcome!.
U.S. 33 Northern Connector Alternative
U.S. 421 Bridge DES# Thursday, July 17, :30 p.m. Frankfort Community Public Library 208 West Clinton Street, Frankfort, IN.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
I-65 Added Travel Lanes Project in Tippecanoe County
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Connecticut Department of Transportation Bureau of Policy & Planning.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
U.S. 224 Road Reconstruction Project from the St. Mary’s River Bridge to just east of Jackson Street in Decatur, Adams County 6:30pm Presentation Erekson.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
New I-65 Interchange at Worthsville Road April 11, 2013 Welcome!
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
USA Parkway Project Welcome Public Information Meeting to the
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
State Route 268 Rutherford County, TN DESIGN PUBLIC MEETING June 2, 2015.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
HAMILTON COUNTY SR-317 (Bonny Oaks Drive) Widening From SR-17 to I-75 January 21, 2016 Robert Rodgers - C.E. Manager 2 TDOT Region 2 Project Development.
Tonight’s Schedule Introduction Presentation Question and Answer Session Open House Staff at displays to answer questions Complete comment cards and/or.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
EAST BATON ROUGE PARISH PECUE LANE/I-10 INTERCHANGE EAST BATON ROUGE PARISH CITY/PARISH PROJECT NO. 09-CS-US-0041 STATE PROJECT NO. H FEDERAL AID.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
I-4 Express Lanes Project Development and Environment (PD&E) Study From east of 50 th Street to the Polk Parkway (SR 570) WPI Segment No: Polk.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Project Status & Right-of-Way Acquisition
US 181 Harbor Bridge Project
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
SEQRA as a Tool to Review Energy Projects
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
S.R. 26 Road Rehabilitation in Clinton County
Walker Street Reconstruction Project 25% Design Public Hearing
I Street Bridge Replacement Project
Presentation transcript:

State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018 Wilder Road Grimsley, Tennessee

Meeting Purpose Provide the public with the latest information on the SR-28/US-127 Improvements Project; Gather feedback regarding the content of the environmental document; Solicit comments and concerns; Answer questions; and Meet the requirements of the National Environmental Policy Act (NEPA).

Please Pick-up an information package; View the project displays; Ask TDOT representatives for assistance; and Provide comments.

Your Comments Are Important and Will Be Considered 1.Submit a statement to the Court Reporter. o See the representative at the Court Reporter’s table. 2.Submit written comments tonight. o Comment card is included in your handout. 3.Mail written comments to TDOT postmarked by April 5, *Please make sure to include your name and address on your submitted comment form or letter to be included in the official record.

Project Location Project Termini ▫Begin Project: SR-62 in Clarkrange, TN ▫End Project: Improved four-lane section three miles north of Grimsley, TN Project Length: ▫Total project length is 9.3 miles

Project Background Tennessee General Assembly passed legislation to connect all county seats by a four-lane highway to the interstate system (TCA § ). In 1999, local officials requested a feasibility study to identify deficiencies along SR-28/US- 127 from Interstate 40 to Jamestown, TN (county seat). The feasibility study was completed in TDOT initiated an Environmental Assessment (EA) in 2008.

Project Background Continued TDOT held a Public Meeting on the EA in June Federal and state agency review of the project area held in September Technical studies (Ecology, Air, Noise, Geology, Traffic, Hazardous Materials, Archaeology, and History) were completed in 2009 and The Federal Highway Administration (FHWA) approved the EA on December 22, The Notice of Availability was published in February The EA was distributed for public review at the Fentress County Library and the TDOT Construction Office in Crossville in February 2011.

Purpose and Need Provide a direct link between Jamestown and Interstate 40 in Crossville as part of the Tennessee County Seat Connector Program; Improve operational efficiency; and Promote economic development.

Alternatives Evaluated in the Environmental Assessment No-Build Alternative ▫No improvements would be made to the existing roadway network other than routine maintenance. ▫SR-28/US-127 would not be widened and would remain a two-lane roadway. Alternative A (Build Alternative) ▫Would widen SR-28/US-127 to a four or five lane roadway.

Alternative A (Build Alternative) Alternative A is comprised of two typical sections: In the vicinity of SR- 62 to Banner Roslin Road: ▫Two 12-foot travel lanes in either direction. ▫12-foot continuous center turn lane. ▫10-foot shoulder on either side of the roadway. ▫ Two-foot gutters and 10-feet of utility strip on either side of the roadway. ▫Within approximately 104 feet of right-of-way.

Alternative A (Build Alternative) From Banner Roslin Road to the northern project terminus at Wright Frogge Road: ▫Two, 12-foot travel lanes in either direction (Divided Highway). ▫52-feet of median between travel lanes. ▫ 12-foot shoulders. ▫Within approximately 300 feet of right-of-way.

Transportation and Land Use Impacts Alternative A would: Improve mobility and safety of traffic. Improve access for traffic. Improve traffic operational efficiency. Converts 82 acres of land to highway right-of- way. Is consistent with regional and state planning efforts.

Social and Economic Impacts of Alternative A No effect on social/community cohesion. No disproportionate effects on minority or low-income communities/persons. 48 residential relocations (nine of which are presently vacant). 11 business relocations. One non-profit relocation. Clarkrange Fire Department

Social and Economic Impacts of Alternative A Continued Possible increase in taxable property. Increased opportunities to attract new businesses and industries. Possible increase in number of job opportunities.

Cultural Resource Impacts of Alternative A Architectural/Historic: No adverse effect Archaeological: No adverse effect Recreational Resources: No effect Section 4(f) and Section 6(f) Resources: No effect Aesthetics and Visual: No adverse effect

Physical Environment Impacts of Alternative A Air Quality: No Impact Noise Level Range: No substantial increase over existing noise levels. Geology: No Impact Hazardous Materials: Right-of-way may be required from potentially contaminated sites; recommended Phase II Contamination Assessment may be carried out at some of these sites. Floodplains: No Impact Energy: No Impact

Natural Resource Impacts of Alternative A Farmland: Direct conversion of some prime farmland. Streams: 10 stream crossings Wet-weather conveyance: four crossings Ponds: three ponds Wetlands: 21 wetlands 303(d) Listed Streams: No streams listed in project area. Wild and Scenic Rivers: No Impact

Natural Resources Impacts of Alternative A Continued Federally Listed Threatened and Endangered Species: ▫May affect, but not likely to adversely affect, three listed species. State Listed Threatened and Endangered Species: ▫May affect, but not likely to adversely affect, three listed species.

Permits Required National Pollutant Discharge Elimination System Permit, U.S. Environmental Protection Agency; Class V Injection Well Permit, Tennessee Department of Environment and Conservation; Aquatic Resources Alterations Permit, State of Tennessee; and Section 404 Permit from the U.S. Army Corps of Engineers.

Schedule of Remaining Tasks Hold Public HearingMarch 15, 2011 Public Comment Period EndsApril 5, 2011 Prepare Final Environmental Document Spring and Summer 2011 Approval and Distribution of the Final Environmental Document Summer and Fall 2011* *As of March 2011, this project does have not funding for design or right-of-way acquisition. Therefore, the final environmental document cannot be approved by FHWA until dedicated funding is allocated.

Remember – Your Comments Are Important and Will Be Considered Please let us know what you think by: Submitting statements to the court reporter; Submitting written comments tonight; and/or Mailing comments to TDOT postmarked by April 5, *Please make sure to include your name and address on your submitted comment form or letter to be included in the official record.

For More Information on the Project Please Contact: Mr. Ralph Barnes, PE TDOT Project Manager (615) Visit the project website at: