MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

RF Specification discussion MICE RF workshop 16 th April 2012.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
RF systems for MICE Andrew Moss The MICE RF Group and the TIARA WP7 Team Contributions include Daresbury, RAL, CERN, LBNL, LANL, FNAL, Strathclyde & Sheffield.
Andrew Moss Daresbury Laboratory Collaboration Meeting th 19 th October 2012 RAL MICE RF System review.
Andrew Moss Daresbury Laboratory August 2013 Latest results of MICE amplifier testing.
THE MICE RF SYSTEM J.F.Orrett* A.J.Moss, ASTeC, Daresbury Laboratory, WA4 4AD, UK Accelerator Science and Technology Centre
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
1 UKNF/MICE Oversight Committee Open session Integration of the MICE project Background & local history Progress since 2007 Schedule & planning considerations.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
Daresbury MICE Progress Andrew Moss Joe Orrett Peter Corlett.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
RF Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration Meeting.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
Andrew Moss Daresbury Laboratory Collaboration Meeting th -16 th February 2013 Coseners House MICE RF HP System rprogress.
Collaboration meeting, DL, 19 h – 23 h October 2008 Andrew Moss ASTeC Collaboration meeting, DL, 19 th – 23 th October 2008 MICE RF distribution system.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
1 MICE RF Daresbury Laboratory Support Joe Orrett - ASTeC.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE RF – TIARA and General Progress Tim Stanley RAL 5 June 2013.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
Andrew Moss ASTeC Collaboration meeting CM29 15 th - 18 th February 2011 MICE RF System.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Electrical & Control Power Supplies Trevor Hartnett.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Progress on the MICE RF High Power Drive Systems K Ronald, University of Strathclyde For the MICE RF team 1MICE CM38 RF Parallel Session.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
RF Review CM37 Andrew Moss. Amplifier results at Daresbury 2MW at 35kV, good efficiency and gain.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Standalone Commissioning Plan in MICE Hall K Ronald, University of Strathclyde For the MICE RF team 1MICE RF Review 9th Sept 2016.
RF Module Integration Colin Whyte University of Strathclyde on behalf of the MICE collaboration 1RF Review 9th & 10th Sept '15 Abingdon.
UK Project Plan (Finance & Risk) Alan Grant STFC DL RLSR 5 th April 2016.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE HPRF Up-date Tim Stanley RAL – Testing 212 kW achieved from driver stage 4616 #1 at DL, ready for endstage 116 #2. Good experience, in tuning.
Schedule and Milestones Colin Whyte STFC RAL Resource Loaded Schedule Review 5 th April 2016.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Chris Booth Sheffield 29th March 2006
MICE RF System Power Supplies, Control and Monitoring Status report
MICE Target Report Video Conference 29/11/07
MICE CM31 Schedule summary
Presentation transcript:

MICE RF – Installation at RAL Tim Stanley, MICE RF Engineer, RAL 2 June 2014

RF Amplifiers – Performance at DL

RF Amplifiers - Performance 2 MW RF output was achieved at Daresbury, in July 2013, on amplifier chain #1. PSU trips were mitigated to allow high enough HT supply voltage (35 kV) to achieve the 2 MW RF Amplifiers and PSU racks were dismantled and arrived at RAL MICE Hall mid-August.

TIARA System – Plan A

End-stage, ground floorDriver stage and PSU racks

TIARA System – Plan B

Preparations for Installation Alternative layout, of o/p co-ax, was implemented; avoided further delays in lead-time for upper floor mods. Limited demonstration, for TIARA milestone, to 500 kW Safety Case document written by TS, and approved by ISIS- MICE Safety board. – Included Risk Assessment and Method Statement – Included HT, ionising and non-ionising radiation safety – Radiation monitoring schemes were developed in conjunction with RAL Radiation Protection Superviser TS appointed EMF Protection Advisor. (RF and microwave fields).

Procurement of RF Components MEGA, in the USA, fulfilled full order of parts for entire MICE RF (full Step VI)system. Importation, under MoU, via Univeristy of Mississippi, achieved late September Many components of the RF system were procured by University of Mississippi under and MRI grant; thanks to Don Summers, and his colleagues.

Procurement of RF Components Components included: Co-ax RF transmission-lines for the whole project (a vast consignment!) HT reservoir capacitors HT charging PSUs LLRF boards 3 new 4616 tubes and an amplifier i/p cavity

Procurement of RF Components MoU allowed waiver of UK import taxes Several components immediately used for build of amplifier system #1 for TIARA milestone

Arrival of a batch of TX lines at RAL

6” co-ax

6” co-ax – assembly practice

Mechanical Installation PSU and Control racks (5) craned into position during August. End-stage amplifier craned-in during September

Mechanical Installation – End-stage

Mechanical Inst: HT PSU and SSPA

Mechanical Inst – HT PSU Rack 2

Mechanical Installation Co-ax feeds from Driver stage to Endstage, and Endstage to Dummy-load, were fitted; co- ax is rigid piping. Careful, accurate siting of amplifiers required. Laser-based survey imminent. For full runs to cavities, considering some pre- assembly and fitting-checks in R9 lab at RAL in due course.

Mechanical Installation – 3” co-ax

Mechanical installation Driver stage accurately fixed in position

Electrical Installation Done by DL engineers with local Elec technician at RAL Some re-work required owing to config of End-stage HT port.

Services - Water De-mineralised cooling water supply plumbed to MICE RF area. Dedicated closed-loop, but shares cooling with chilling system for magnets. Aimed for 21 to 24 degrees C at flow input. New system will be fully separate. Flow-rates per water circuit, and conductivity at flow and return, were monitored and used for safety-trips. (Conductivity < 0.5 uS/m achieved)

Services - Water 8-channel water distribution panel quickly designed by sub-contractor. Performed OK but RAL design review likely to improve fit in the confined space for RF plant in the MICE Hall Bleeding-points, in 4616 amplifiers, to be fitted.

Services - Water

Services - Air Supply, of dry and clean compressed air, provided to RF area in MICE Hall; local distribution and interlocks fitted. STEP V system will need nitrogen pressurisation of co-ax TX lines (~ 2 Bar) to improve voltage stand-off.

Programme Owing to protracted test-programme at DL to mid-2013, to resolve technical issues, RAL installation programme was very compressed. However, teams, at RAL and DL, were able to bring a high level of commitment to the project, within the constraints of other high-priority work. Avoiding the proposed mods., to mezzanine floor, won some time. EMR Runs during October reduced hall-time by ~ two weeks.

Staff MICE mechanical and electrical fitting work relied heavily on two RAL technician staff. Two more technicians now being hired for the project.

TIARA Milestone Success Dec Amplifier chain functional; 531 kW RF power delivered to load; TIARA milestone achieved! Two weeks ahead of deadline.

Ready for Testing

RF Powers in MICE Hall

Rogues Gallery

2014 Amplifiers were further run for detailed operating familiarisation by Tim S and Pierrick H. Good preparation for generating protocols for design of remote-control system this year. All 5 PSU racks, and 4616 amplifier, returned to DL in April, for re-assembly RF testing, at DL, to resume ~ Summer 2014

Tentative Programme RF amplifiers #2 aim to be ready and tested by end of FY 2014/15 Lock-out from MICE Hall, for STEP IV running, for one year from April 2015 PSU racks #2 aim to be ready by end of FY 2015/16 Installation of two amplifier systems at RAL for STEP V readiness during 2017

Tentative Programme Perhaps introduce test cavity to pre-testing programme Build of X-ray screening would be required

Enhancement of STEP V?? Perhaps option to increase E-field with amplifiers systems 3 and 4. Would need some re-config. of co-ax layout and some new components. Might invoke SF6 pressurisation of lines.