NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.

Slides:



Advertisements
Similar presentations
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Advertisements

ISS Institutional DTN Overview for CCSDS
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
Open Source DTN for ISS Payloads Concept Proposal, 05-Jun Open-source DTN communication software for ISS Payloads Kevin K. Gifford BioServe Space.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
SpaceOps Stockholm Page 1 SpaceOps 2012 Stockholm Col-CC Voice System Migration During On-Going Operations Thomas Mueller, DLR,
Constellation Space Transportation Planning Office July 30, 2009.
SPACE SHUTTLE PROGRAM Space Shuttle Business Office NASA Johnson Space Center, Houston, Texas Presenter Date Page 1 Space Shuttle Program Flight and Ground.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Ku - Band, DTN, and enhanced payload utilization.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIF End-to-End Process.
1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Execute Tailored Procedures (XTP) Status POIWG – July 2015 Lamar Stacy.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
Introduction to Payload Planning Will Kirby (256)
Crew Operations Team Alexia R. Matthews Cold Stowage CPE (256)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
NanoRacks, LLC Michael D. Johnson (832) Page No. 1 NanoRacks, LLC Cube Lab Cube Lab Ops TIM – Cube Lab Introduction 11/19/2009 Michael D. Johnson.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Live Video.
MOL The Mission Operations Laboratory First Contact Package June 2011 NASA MSFC Huntsville, Alabama An Introduction to the Payload Systems Team (PLST)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for KSC Payloads #3 of 5 June 5, 2013 Getting.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Status Increment.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
INTERNATIONAL SPACE STATION PTC Process Flows August 17, 2007 Robert D. Blum Payload Capability Training Lead
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory HOSC Payload Ethernet Gateway (HPEG) HOSC Service Supporting IP Access.
1 Ground Tool Development Process for PRO/DMC/PHANTOM/CPO Robbie Hawkins/PRO.
NASA MSFC Engineering Directorate Huntsville, Alabama 10/29/2012 HOSC DTN Activities October 2013.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Safety Operations at.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
POIC Safety Payload Operations & Integration Center Mitchell Moore Marshall Space Flight Center ARES Corporation POIC Safety 1.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #35 January 27-31, 2014 Ann Bathew EO03/Operations Directors.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
Date: August 5, 2004 Originator: Angela Marsh/FD42 Page: 1 Payload Planning System (PPS) User Requirements Collection (URC) POIWG Status August 5, 2004.
National Aeronautics and Space Administration (NASA) Glenn Research Center SAMS KU Forward Lessons Learned 1 Kevin McPherson NASA GRC Payload Operation.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increments
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Page No. 1 ISS_CM_019 (Rev 09/2011) Pre-decisional, For Internal Use Only Payload Safety Review Panel (PSRP) Process Updates/Status International Space.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama First Contact Package Last updated June 2011 Payload Operations and Integration Function.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for SLOSH #2 of 5 July 17th, 2012 The Operations.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Page No. 1 Overview Kelvin Nichols Payload Operations and Integration Center EO50 SSCN Delay Tolerant Networking (DTN)
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
File Uplinks Through the Payload MDM POIWG Session 15 Tuesday, September 9, 2003, 3:15 to 3:35 David Deitsch, CPO Command and Data Systems Team MSFC Flight.
ISS Institutional DTN Overview for CCSDS
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz FRR POIF/POIC Readiness Lamar Stacy Payload Operations Director Increment 19/20 Lead

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 2 POIF/POIC CoFR Overview  POIF/POIC submits CoFR endorsements to OZ/Space Station Payloads Office.  POIF/POIC CoFR requirements are defined in ISS Program Payloads CoFR Implementation Plan (SSP Rev E), Table G-1.  POIF/POIC/MOL endorsement for 18S CoFR was submitted on 17 February 2009 in memo EO03 (02-09) which was copied to Courtenay McMillan JSC/DA8.

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 3 Payload Manifest  New Payload activities:  Bodies In Space Environment (BISE)  New POIC capabilities  Delay Tolerant Network (DTN) command capability delivered in Enhanced HOSC Software (EHS) build on 1 April.  CGBA hardware will utilize commands in the 2J/A database delivery as a test bed for DTN  The transition to the 2J/A products is scheduled earlier than normal to accommodate Program directed DTN tests in April.

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 4 POIF/POIC Open Work for 18S  Standard Open Work:  Payload Imagery Reqts. and Transit EvaluationECD 5 March 09  Baseline of Crew Procedures (BISE) ECD 12 March 09  Control Center tools are complete and readyECD 20 March 09  Baseline of POIC Transition Timeline to 2J/A MOPECD 20 March 09  POIC Operators are TrainedECD 25 March 09  POIC/TSC Ground I/F & software verificationECD 31 March 09  POIC to IP Control Center software verificationECD 31 March 09  TSC/PI Console Operator Training (BISE) ECD 25 March 09  POIC Transition to EHS & 2J/A MOP  Payload Teams verify command/telemetry products ECD 31 March 09  DTN Specific and 2J/A Transition ECD 1 April 09  POIC/JSC Integrated Testing (MCT) ECD 17 April 09  No issues with standard open work  Non-Standard Open Work:  None

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 5 Summary of Flight Readiness  Pending completion of Open Work:  POIC FCT has been trained and certified.  PODF is baselined for crew and ground command procedures.  HOSC facility, remote interfaces, and EHS software are verified.  No open payload anomalies are a constraint to launch/flight.  Flight documentation is ready.  POIF/POIC has no exceptions to 18S CoFR. for Increment 19/18 Soyuz

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 6 Payload Acronyms BISEBodies In Space Environment CGBACommercial Genetic Bioprocessing Apparatus DTNDelay Tolerant Network ECDEstimated Completion Date EHSEnhanced HOSC Systems FCTFlight Control Team HOSCHuntsville Operations Support Center MCTMission Configuration Test MOLMission Operations Laboratory MOPMission Operations Project PIPrincipal Investigator PODFPayload Operations Data File POICPayload Operations Integration Center TSCTeleScience Center

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Back Up Charts CoFR Endorsements

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 8 CoFR Endorsements

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 9 CoFR Endorsements cont’d

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 10 CoFR Endorsements cont’d

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 11 CoFR Endorsements cont’d

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 12 CoFR Endorsements cont’d