OC Team Ops Notes. Jenn Whitworth I2 PRO 256-961-1604 2 What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)

Similar presentations


Presentation on theme: "OC Team Ops Notes. Jenn Whitworth I2 PRO 256-961-1604 2 What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)"— Presentation transcript:

1 OC Team Ops Notes

2 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 2 What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO) method of documenting pre-flight problem reports and on- orbit anomalies and their associated workarounds Ops notes cover: –system workarounds –EXPRESS Rack workarounds –payload (subrack or facility) workarounds –International Partner payload workarounds –Ground System workarounds

3 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 3 How are they developed? KSC testing – PR’s and IPR’s generated during stand- alone and integrated ops testing in PRCU or PTCS Development inputs – JSC, EXPRESS, and PD’s provide inputs for known problems, limitations, or features Equipment degradation or failure documented by Payload Anomaly Reports (PAR) Simulations and ground system tests

4 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 4 Ops Note Form

5 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 5 Ops Notes Naming Convention ON – Designates this is an ops note Payload/system – designates the payload and or system affected. For I2 this is EHS, EXPRESS, HRF, PLDs, ADVASC, CGBA, CPCG, MAMS, SAMS, STES9, STES10, TCS, EPS, ECLSS, PLMDM Category – Electrical (ELE), Fluids (FLD), Hardware (HW), Mechanical (MECH), Software (SW), ISS Systems (ISS), Ground Support Equipment (GSE) Number – Automatically assigned in database Example: ON-EXPRESS-SW-4

6 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 6 Where do we stand now? At the current time we have 54 ops notes written –39 Software –6 Ground Support Equipment –5 Hardware –3 Fluids –1 Electrical

7 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 7 Ops Note Maintenance PSE will maintain database Life of Ops notes may be: –Permanent –Increment/Flight specific –Closed Once an Ops note is closed it will be archived Ops notes will be viewable on the RICO webpage under “real-time products”

8 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 8 Ops Note Flow PRE-INCREMENT SOURCE: KSC Testing (PRs/IPRs) Training, Planning SPRs, NCs Safety Data Package EI GL & C Document Changes made to appropriate documents POH JOIP GCP Crew Procedures Flight Rules/Payload Regs Console Handbook ECR Process REAL-TIME SOURCE: PARS System Anomaly Reports (SAR) Software updates ORU replacements OCR Process At TBD Interval Existing Ops note revised as needed New Ops notes added Closed Ops notes archived

9 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 9 Forward Work Develop SOP to define process for maintaining Ops Note Database Expand database to include IP payloads

10 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 10 Acronym List ADVASC- Advanced Astroculture AOS- Acquisition of Signal CGBA- Commercial Generic Bioprocessing Apparatus CPCG- Commercial Protein Crystal Growth CPO- Command and Payload MDM officer ECLSS- Environmental Control and Life Support Systems ECR- Engineering Change Request EHS- Enhanced HOSC system EI- EXPRESS Integration ELE- Electrical EPS- Electrical Power System EXPRESS- EXpedite the PRocessing of Experiments to Space Station FLD- Fluids GCP- Ground Command Procedures GL&C- Guidelines and Constraints GSE- Ground Support Equipment HRF- Human Research Facility

11 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 11 Acronym List HW- Hardware IP- International Partner IPR- Interim Problem Report JOIP- Joint Operations Interface Procedures LOS- Loss of Signal MAMS- Microgravity Acceleration Measurement System MECH- Mechanical NC- Nonconformance OC - Operations Controller OCR- Operations Change Request ORU- Orbital Replacement Unit PAR- Payload Anomaly Report Paycom - Payload Communications Manager PCG-STES- Protein Crystal Growth - Single Thermal Enclosure System PD- Payload Developer PLD- Payload

12 Jenn Whitworth I2 PRO 256-961-1604 jennifer.whitworth@tbe.com 12 Acronym List PLMDM- Payload Multiplexor/Demultiplexor POH- Payload Operations Handbook PR- Problem Report PRCU- Payload Rack and Checkout Unit PRO - Payload Rack Officer PSE- Payload Systems Engineer PTCS- Payload Test and Checkout System RIC- Rack Interface Controller RICO - Realtime Interface Coordination Officer SAMS- Space Acceleration Measurement System SAR- System Anomaly Report SOP- Standard Operating Procedure SPR- Software Problem Report SSPC- Solid-State Power Controller SSPCM- Solid-State Power Controller Module SW- Software TCS- Thermal Control System