Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.

Similar presentations


Presentation on theme: "Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration."— Presentation transcript:

1 Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration Center Page: 1

2 Page: 2 HAL3 Update No configuration files are being delivered for 1E, therefore Columbus module Limit checking must enabled by PLMDM bundle. Enable limit checking for Caution and Warning : FSL, BIOLAB and EDR. Changes Autonomous H+S Processing for ANITA Payload. Increase efficiency to AP_HAL3_ER4 for ANITA daily commanding

3 Page: 3 Installation on the PLMDM Files are uplinked to the PLMDM (Primary and Backup), effectively overwriting current file contents presently on-board File names - AP_HAL3_ER4 and AP_HAL3_PLMDM. PRO will HALT and REMOVE from the Timeliner executor the AP_HAL3_PLMDM bundle and the AP_HAL3_ER4 bundle.

4 Page: 4 Installation on the PLMDM PRO will Install the AP_HAL3_PLMDM Bundle which will become active automatically and continue with nominal operations No further file maintenance is required as uplink/overwrite does this for us.

5 Page: 5 Review & Approval History HAL3 Content reviewed and accepted by MSFC Auto-Procedure Control Panel ___ HAL3 PLMDM Update was presented to the PLOT and approved on _______ HAL3 PLMDM Update was presented to the PSCP and approved on __ ___ HAL3 PLMDM Update was presented to the TORP and approved on ____ HAL3 PLMDM Update received POIC Automated Procedure Control Panel ECR approval on _________ HAL3 PLMDM Update received US PODF CB approval on ______________ ( ECR EO30-07-007 ). Uplink and Execution OCR (xxxxxxxx) approval on _____________ Ops Tag (NASA Internal) on ____________ Approved for uplink and execution via Flight Note # ____________ on ___________.

6 Back up Charts

7 Page: 7 HAL History HAL-1 was first installed on the PLMDM, April 18, 2005. HAL-1 was the 1st continuously executing set of sequences on ISS. HAL-1 included the following functionality:  A monitoring procedure that automatically installed and removed payload RT bundles based upon power status.  A monitoring procedure that automatically issued H&S startup/shutdown notification commanding for the MSG Rack and messaged for all other payloads (Proof of Concept).  A Ku monitoring procedure that messaged to the ground when Ku AOS and LOS were detected.

8 Page: 8 HAL 2 Capabilities HAL-2 was first executed on the PLMDM 9/30/2005. One command PLMDM transition recovery Automatic installation and removal of Timeliner procedures based on power status of RTs Automatic H&S startup/shutdown notification for all racks and payloads. Automatic limit check enablement for all racks and payloads. Automatic bundle management  Configuration control of Bundle Management Autonomy  Decrease workload of POIC CPO Ku Band AOS/LOS flag is written to memory and available for use by other bundles (MSRR is the first RT with this requirement) Shared memory for inter-bundle communication 1 Hz Telemetry status via Ku of the complete HAL system Direct text messaging to the ground operator (CPO) Direct Man-In-The-Loop interface (HAL Configuration Requests)

9 Page: 9 HAL 3 History PLMDM Bundle programmed for ULF1.1-12A.1 Payloads Adds Command to increase the number of CHeCS Recording Files to 15 within the Initialization Sequence. PEHG1 and PEHG2 Monitoring Bundles


Download ppt "Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration."