Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
New I-65 Interchange at Worthsville Road Welcome!.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
The US 101 Mobility Study will -  Examine current and future conditions, identify key deficiency areas and propose multi-modal improvement packages along.
Dowell Road Widening From South of HG Truman Road To South of Bean Road Calvert County, Maryland.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Design for Health May 2007 Preliminary Checklist Cairssa Schively Design for Health.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
US 101 Corridor Plan Prepared by: Oregon Department of Transportation May 2013.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Public Hearing PROPOSED HIGHWAY IMPROVEMENTS I-95 DEFENSE ACCESS ROADS RAMPS TO THE ENGINEER PROVING GROUND Fort Belvoir, Virginia AUGUST 20, 2008.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
Traffic Flow Parameters Surface Street Application.
STA Safety Project PID #76439 December 12, 2006.
Secondary & Cumulative Effects Analysis Training Program Module 4: How to Develop SCEA Land Use Information How to Develop Land Use Information.
Problem 1: Determination of Facility Types for Analysis.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Secondary & Cumulative Effects Analysis Training Program Module 2: How to Establish the SCEA Geographical Boundary.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
Geometric Design: General Concept CE331 Transportation Engineering.
Summary of the WILMAPCO Congestion Management Process Prepared for T3 Webinar September 18, 2007.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
Transportation System Comments Santolina Level ‘A’ Master Plan.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
River to Sea TPO Meeting US 92/International Speedway Boulevard
General Tab Project, Cost Schedule, and Work Limits Roadway Character
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what resources should be considered in the SCEA Cultural Resources Community Wetlands Surface/ Groundwater Parks Wildlife Farmlands

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Scoping and initial SCEA activities Initial SCEA resource identification Data Sources Scoping and initial SCEA activities Initial SCEA resource identification Data Sources Overview

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Scoping and Initial SCEA Activities Incorporate into project planning process during preliminary alternatives development. Identify environmental resources and SCEA issues in the project area. (Directly impacted resources are the starting point. More resources may be identified based on secondary impacts or if new alternatives, with other/new impacts, are looked at.) Coordinate with resource agencies to: -obtain input on resource identification and analysis methodologies -inform them of missing information which could become an obstacle -seek their approval Incorporate into project planning process during preliminary alternatives development. Identify environmental resources and SCEA issues in the project area. (Directly impacted resources are the starting point. More resources may be identified based on secondary impacts or if new alternatives, with other/new impacts, are looked at.) Coordinate with resource agencies to: -obtain input on resource identification and analysis methodologies -inform them of missing information which could become an obstacle -seek their approval

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Initial SCEA Resource Identification Identify resources directly impacted by each proposed project alternative. Identify potential secondary impacts from project alternatives in coordination with local planners and developers. Identify resources directly impacted by each proposed project alternative. Identify potential secondary impacts from project alternatives in coordination with local planners and developers.

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Identify readily available data sources. Create resource matrix identifying: -each resource -data availability -data units -data sources -analysis methodology (Modules 4 & 5) Identify readily available data sources. Create resource matrix identifying: -each resource -data availability -data units -data sources -analysis methodology (Modules 4 & 5) Prepare SCEA Resource Matrix for Presentation at the Interagency Field Review Identify Potential Secondary Impacts Identify Direct Impacts Develop SCEA Resource Matrix Determine Data Availability

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Key Data Sources

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Middle River Employment Center Access Study (MRECAS)

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Middle River Employment Center Access Study (MRECAS) Purpose of the Project: To improve access from regional transportation network to enable planned economic development. To increase utilization of established employment areas in the Middle River Employment Center. Need for the Project: There is a need for a sufficient level of access and mobility for the Employment Center. Support of economic development. Existing roads in the study area lack the capacity and continuity to provide adequate access to the entire MREC from the existing highway network. Purpose of the Project: To improve access from regional transportation network to enable planned economic development. To increase utilization of established employment areas in the Middle River Employment Center. Need for the Project: There is a need for a sufficient level of access and mobility for the Employment Center. Support of economic development. Existing roads in the study area lack the capacity and continuity to provide adequate access to the entire MREC from the existing highway network. Project Purpose and Need

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Middle River Employment Center Access Study (MRECAS) Study Area Boundary

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Middle River Employment Center Access Study (MRECAS) Note: Strikethroughs indicate items that are inappropriately listed as SCEA resources. Resource Matrix

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Rationale for Removing Items From the SCEA Rationale for Retaining Resources in the SCEA NOTE: “Disruption to Community” as it is termed in the MRECAS environmental impact matrix, is not a resource and was not analyzed in the SCEA. However, “communities” is considered a resource and can be analyzed as such in other SCEAs. Middle River Employment Center Access Study (MRECAS)

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation improvement Project MD 5 Location Map

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project MD 5 Direct Impacts Study Area

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project The purpose of the MD 5 - Hughesville Transportation Improvement Project is to alleviate congestion and to address safety hazards along MD 5 at the MD 5/MD 231 intersection in the Hughesville area. MD 5 through Hughesville experiences a high accident rate due to a constrained typical section, limited capacity at the MD 5/MD 231 intersection, and numerous driveways with direct access onto MD 5. Traffic congestion and safety along MD 5 during morning and evening rush hours have become significant problems in recent years and conditions are expected to increase to 85 percent with the projected growth by year 2020 near Washington D.C., Lexington Park, and along the MD 5 corridor. The MD 5/MD 231 intersection currently operates at LOS "F" in the evening peak hour. The purpose of the MD 5 - Hughesville Transportation Improvement Project is to alleviate congestion and to address safety hazards along MD 5 at the MD 5/MD 231 intersection in the Hughesville area. MD 5 through Hughesville experiences a high accident rate due to a constrained typical section, limited capacity at the MD 5/MD 231 intersection, and numerous driveways with direct access onto MD 5. Traffic congestion and safety along MD 5 during morning and evening rush hours have become significant problems in recent years and conditions are expected to increase to 85 percent with the projected growth by year 2020 near Washington D.C., Lexington Park, and along the MD 5 corridor. The MD 5/MD 231 intersection currently operates at LOS "F" in the evening peak hour. Project Purpose and Need

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project No-Build - This alternative would not provide any significant improvements to MD 5 in the Hughesville area. Minor improvements would occur as part of normal maintenance and safety operations. These improvements would not measurably affect roadway capacity or reduce the accident rate. Possible minor improvements include items such as curbing, sidewalks, striping, signing, lighting, rumble strips and additional drainage. Alternatives Retained for Detailed Study

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project Widen Existing MD 5 - This alternative proposes widening existing MD 5 to a seven-lane curbed section, with two through lanes and an auxiliary right turn lane for both the northbound and southbound directions and a continuous center left turn lane. This alternative would have three northbound and southbound lanes near the MD 5/MD 231 intersection. The posted speed limit would be 40 miles per hour (mph), similar to existing MD 5. This alternative requires the additional widening of MD 5 at the MD 5/MD 231 intersection. The widening creates the necessary storage to efficiently move peak hour traffic through the MD 5/MD 231 intersection. Alternatives Retained for Detailed Study

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project Eastern Bypass - This alternative is a four-lane divided highway located east of MD 5 from south of Gallant Green Road to north of Carrico Mill Road. The Alternative 5 design speed is 60 mph. This alternative bypasses the town of Hughesville to the east. Alternative 5 is access controlled, providing only three points of access to the town of Hughesville. These points of access are at either end of the bypass and at MD 231, where a diamond interchange is proposed. The controlled-access Alternative 5 would safely and efficiently accommodate the 90 percent through traffic projected for this facility. Construction of the bypass will also safely accommodate traffic on existing in Hughesville. By intercepting the high volume of through traffic traveling between Calvert County and Lexington Park prior to Hughesville. Alternatives Retained for Detailed Study

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Summary of Direct Impacts As Presented in the EA MD 5 - Hughesville Transportation Improvement Project

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA Summary of Direct Impacts As Presented in the EA (Not Appropriate for SCEA) MD 5 - Hughesville Transportation Improvement Project Note: Strikethroughs indicate data sources that should not be included in SCEA Assessment

Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA MD 5 - Hughesville Transportation Improvement Project Rational for Including or Excluding Resources from the SCEA