11 th January 2012 Thanks to everyone who gave me transparencies.

Slides:



Advertisements
Similar presentations
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Advertisements

Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
The new MEF Group S. Baird 12 th December The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.
DTO Day – Report for EN Ofelia Capatina, DTO of EN Department.
Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Mid Term Review Meeting, 26 September 2012E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
MEF - Machines & Experimental Facilities Linac4 project EN/MEF roles & responsibilities EN/MEF group meeting October J.Coupard1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Planning & Installation meeting New working group EDMS th October 2014LIU PLI meeting - J.Coupard1.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
CNGS Operation Summary Edda Gschwendtner, CERN. Outline Introduction CNGS Performance Highlights since last NBI 2010 in Japan Issues Summary 2E. Gschwendtner,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
TE-CRG Activities D. Delikaris, TE-CRG.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
I. Bergevoet - Training preparation
CERN Construction Planning and Scheduling (LHC installation)
ICE SECTION The coolest place to be! Elias Métral
Framework Schedule from EYETS 2016 to LS2
Injector De-cabling Project
LHC schedule.
Looking back on 2014 and Perspectives for the MPE Group in 2015
East Hall under construction
Experimental Areas – LS2 planning
East Hall under construction
Presentation transcript:

11 th January 2012 Thanks to everyone who gave me transparencies

EN-MEF Group Meeting New Faces MARS and the CERN Competency Model Challenges and Object1ves for 2012 & LS1 Concentrate on the changes & new challenges How can we meet these challenges? And not neglect our existing activities ….

New Faces 10 new faces in the last few months! Plus a few old faces…. Nos quatre mousquetaires de la sécurité = Michel, Manu, Cyrille, & John

December 5, 2011Roberto Saban4 Safety is important

CERN Competency Model (CCM) What we do is important but how we do it, is also important Technical Competencies (What) CERN Values and behavioural competencies (How) The CCM is replacing the criteria used for:- Assessment for recruitment Mid and end of probation reports MARS assessments LD to IC process Career review and promotions exercises See

2012 MARS & CCM See online MARS guideonline MARS guide Results of the 2011 MARS objectives will be assessed in 2 ways What (i.e. the results obtained, objectives meet etc….) How (i.e. Competencies demonstrated … up to 2) There will be no rating of the competences, but competences demonstrated and any areas of improvement should be high-lighted and, if necessary, addressed. Overall performance qualification will not change i.e. Particularly meritorious Meritorious Non-meritorious

2012 MARS & CCM Work and supervisory objectives will be set as follows:- Covering 3-5 areas Results defined in measurable terms on a clear time scale Indication of resources needed (if appropriate) Development objectives replace the training objectives These can be either technical or behavioural They can refer to specific training courses if appropriate They can also refer to any areas of development identified in the 2011 assessment Where necessary Safety form OHS must be completed as part of the MARS exerciseOHS-0-0-3

Supervisors have taken both CCM and MARS training courses There are half-day training MARS training courses organised for all CERN Staff to:- Help you understand the use of the CCM in today’s MARS process Help you and your supervisor complete a fair assessment of your work, your objectives and your development needs for the future Please follow this half-day MARS training… MARS & CCM

Challenges and Objectives for 2012 & LS1 Preparing for LS1 LHC, R2E, Injectors and Injector upgrade programs Tracking changes to accelerators Non-LHC physics in 2012

Preparing for LS1

LS1 Organ. & safety Conclusions Xmas S 12 P1P1 S 23 P2P2 S 34 P3P3 S 45 P4P4 S 56 P5P5 S 67 P6P6 S 78 P7P7 S 81 P8P8 N ov. D ec. J an. F eb. M ar. A pr. M ay J un. J ul. A ug. S ep. O ct. N ov. D ec. J an. F eb. M ar. A pr. M ay J un Draft skeleton schedule PT Cool-down Powering Tests Warm-up Cryo Maint. Powering TestsSplices Warm-upPreparation for cool-down Cool-down Cryogenic maintenance Splices 24-Nov K. Foraz - R2E review 2011

LS1 Organ. & safety Conclusions Xmas S 12 P1P1 S 23 P2P2 S 34 P3P3 S 45 P4P4 S 56 P5P5 S 67 P6P6 S 78 P7P7 S 81 P8P8 N ov. D ec. J an. F eb. M ar. A pr. M ay J un. J ul. A ug. S ep. O ct. N ov. D ec. J an. F eb. M ar. A pr. M ay J un Draft skeleton schedule PT Cool-down Powering Tests Warm-up Splices Powering TestsSplices Warm-upPreparation for cool-down Cool-down R2E Cool-down 24-Nov K. Foraz - R2E review 2011

LS1 Organ. & safety Conclusions Xmas S 12 P1P1 S 23 P2P2 S 34 P3P3 S 45 P4P4 S 56 P5P5 S 67 P6P6 S 78 P7P7 S 81 P8P8 N ov. D ec. J an. F eb. M ar. A pr. M ay J un. J ul. A ug. S ep. O ct. N ov. D ec. J an. F eb. M ar. A pr. M ay J un. J ul. A ug. S ep. O ct. N ov. D ec Jan. Draft skeleton schedule – Physics to physics PT Cool-down Powering Tests Warm-up Splices Cryo Maint. Beam Commissioning Physics No Xmas break Cool-down 24-Nov K. Foraz - R2E review 2011

Preparing for LS1 Not just planning Prepare the changes

Intégration R2E

Preparing for LS1 Not just planning Prepare the changes Track the changes

Configuration Management Linac4 1.0 version Converging data between optics and mechanics Release notes ready to be circulated SPS version ECRs circulated, database updated, release notes circulated LHC Collider version ECRs (finally!) entirely collected Data Release Notes being circulated for approval in EDMS

Preparing for LS1 Not just planning Prepare the changes Track the changes LHC methods already extended to SPS… PS complex is next…

Machine Booster Machine SPS

YEA01.SWY=151 YEA03.PSR = bis BATIMENT 151 BLINDAGE DEVANT EX- 122bis BATIMENT 151 MUR DE BLINDAGE ACTUELLE PORTE 122 bis MUR DE SOUTIEN PARTIELLEMENT REPRESENTE!!! PORTE FIN DE ZONE PORTE ACCES / MAINTENANCE Intégration contrôle d’accés complexe PS

Preparing for LS1 Not just planning Prepare the changes Track the changes LHC methods already extended to SPS… PS complex is next… Access system, ELENA, LIU…

LS1: Work in Meyrin Site Machines, Facilities and in SPS: known Maintenance requests V.Chohan Progressiv e RESTART : Injectors

New Access System : Meyrin Site Machines/Areas V.Chohan

New shielding design New shielding design Bld.361 Route Goward Concrete Iron Steel Earth Asphalt Cellulose Cellulose PS tunnel For reasons of clarity, the complete surrounding earth is not shown here 25

LINAC4 Commissioning in LS1 LINAC4 Commissioning in LS1 ( M. Vretenar ) Start of beam commissioning (3MeV): May 2013 End of beam commissioning (160 MeV): April 2014 (version November 2010) 5 commissioning stages: (on intermediate dumps) 3 MeV10 MeV50 MeV100 MeV160 MeV Linac4 ready : end of April 2014 V.Chohan

2012 Fixed target Physics CNGS

CERN GPS LNGS GPS horns muon detectors   t=57ns 10500ns 524ns CNGS Activities as a Consequence of the OPERA Results on the Neutrino Velocity Measurements CNGS nominal beam is 10500ns long A lot of statistics needed for time of flight analysis Many possible systematic effects along the secondary beam line  Send LHC type bunched beam to CNGS Precise timing of each neutrino interaction Many systematic effects excluded - bunched beam was set up very efficiently - operation from 21 Oct to 6 Nov bunches, each 2ns long, separated by 524ns  Results included in final OPERA paper

2012 Fixed target Physics CNGS HIRADMAT

Preparing for experiments Interface table for installation of experiments Remote operations Test of collimators Test of materials

2012 Fixed target Physics CNGS HIRADMAT NA62

2012 Fixed target Physics CNGS HIRADMAT NA62 EAST & NORTH area experiments and test beams EAST Hall renovation: EAST Hall day on 1 st February TCC2/TDC2 Consolidation starting in 2012

TCC2/TDC2 consolidation plan

2012 Fixed target Physics CNGS HIRADMAT NA61, NA62 EAST & NORTH area experiments and test beams EAST Hall renovation: EAST Hall day on 1 st February TCC2/TDC2 Consolidation starting in 2012 Studies for Long and Short baseline neutrino experiments

38 LAGUNA_LBNO / FP7 Design Study ( ) New design study, extending that of LAGUNA, including the neutrino beams from CERN CN2PY (Pyhasalmi)  Initial : beam from SPS (500kW - 750kW)  Long term: LP-SPL + HPPS - 2MW CNGS - Umbria  Beam from SPS (500kW)  No near detector possibility 2300 km 130km CN2FR (Frejus)  HP-SPL + accumulator ring (5 GeV – 4 MW) Synergy with β-beam (γ=100) 730 km ‣ Beam options for unique physics opportunities in Europe ‣ Profit from experience gained with the CNGS operation ‣ Incremental approach with competitive physics goals at each stage ‣ Synergy with other ν-beam options under study: β-beam, NF ‣ Collaboration in a global scale, profit from know-how in other ν-beam facilities in US and Japan

How can we meet these challenges? Group organisation has not changed since 1/1/2009 New factors Arrival of Safety Coordinators Real shutdowns are very rare, but very long LS1 = 23 months for LHC & 15 months for Injectors New Projects ELENA, LIU-PS, LIU-SPS… Organisation of the Group should reflect these factors and the future activities of the group

MEF Group Group LeaderDeputy GLSecretary S BairdI EfthymiopoulosF Girard-Madoux INJDCINTLEEBETo de decidedTo be decidedSI V ChohanS ChemliY MuttoniI EfthymiopoulosS EvrardK ForazS GrillotM Wilhelmsson R BrownS BartolomeJP CorsoL GatignonF ButinM ArnaudM Ben RomdhaneA Coin N GilbertJ Muffat-JolyF GalleazziE GschwendtnerA PardonsC BedelG BertuolV De Jesus D HayB NicquevertJM LacroixD LacarrerreM JeckelM BernadiniM DecombazF Fayet D McFarlaneP TrilheS MaridorS MataguezS GirodJ CoupardA MassonA Ebn Rahmoun F Bais AL PerrotM LazzaroniJ EtheridgeG PastorG Canale R Zalyalov (PJ)E Zografos (F) D De PaoliH GaillardP Pinget A Apyan (PJ) E Paulat B Biskup (D)T Rutter (F) C Bontiou (UP)E Harrouch (VIA)M Barberan (F) N Charitonidis (D) L Deacon (F) O Hansen (D) A Kurup (UP) C Lazaridis (PJ) Y Martinez (F) D Pfeiffer (F) G Prior (PJ) Planning and Coordination for the Injector chain Database and Configuration Management Integration with support from KA & Acrotechna Design & Operation of secondary beam lines & areas. R2E. Interface with Experimental physics Community Engineering support, planning and coordination for secondary beams lines and experimental areas Organization & Scheduling for LHC and specific projects. Safety CERN Support for Installation. Gas supplies, mechanical works, cabling activities, scaffolding… LHC site coordination & Worksite supervision

Not forgetting our external support teams FSU EN6 LHC site coordination, gas supply, mechanical design work EN15 Mechanical support Contracts C200 Cabling and small works Scaffolding New contract is in preparation KA & Acrotechna Design support for Integration They form an essential part of the Groups activities

MEF Group: New posts 5 in 2012 LHC Planning Coordinator already hired in 2011 & starts in March 5 th Safety Coordinator Technician for Injector shutdown and installation Coordination Beam line Physicist for Experimental Areas Technical Engineer for PS Configuration Management The 4 Vacancy Notices are in preparation In more posts are planned Replacements for leaving staff

Conclusion These are very exciting times for CERN Preparing LHC for nominal operation (includes injectors) Developing present and future physics programs MEF and the EN department have a vital role to play Thank you all for your attention, your support and hard work and all the best for 2012