SARMa Emilia-Romagna & Parma Activity report End of June, 2010 Budapest, June, 28th.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Launch of the ESPON 2013 Programme Procedures for Call for Expression of Interest under Priorities 2.
1 PRODUCTION OF A MANUAL FOR STATISTICS ON ENERGY CONSUMPTION IN HOUSEHOLDS MASTERHOUSE Kick-Off Meeting Luxembourg, 26th January 2012 Administrative Matters.
Nutrition Cluster - South Sudan Nutrition Cluster Coordination Meeting UNOCHA conference hall. 11:00 am -12:30 pm.
ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.
Social Inclusion by Proactive Design InclusiveByDesign Second project meeting June 2001 Florence, Italy.
B A V E N O March AGENDA | 2 DAY 1 TimeOrder of AgendaPartner 9.30hWelcome 9.45h Project Overview & Next Steps Balance of activities Interim report.
NATIONAL GPAR PROGRAMME : INITIATION PLAN PRESENTATION TO LOCAL PROJECT APPRAISAL COMMITTEE June 23, 2011.
Action Plan for AWM WP5: Establishment of Permanent Adriatic Welfare Observatory Welfare Mix Days Ulcinj, July Andrea Russo Adriatic Welfare Mix.
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden 4. Implementation of the BSR INTERREG IIIB Neighbourhood Programme.
SARMa – Sustainable Aggregates Resource Management WP3 Leader Kick off meeting June, Region of Emilia Romagna, Bologna Institute of Geology and Mineral.
MINISTRY OF HEALTH Update on the implementation of SOI Milestones Hanoi, March 2010.
SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa PROJECT STATUS END OF JUNE 2010.
SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa.
Session 13 CPIP Formulation Process Project for Capacity Development for Implementing the Organic Law at the Capital and Provincial Level (PILAC 2)
MARIFISH (Era-Net) Programme – Sequencing of Activity Work Packages Jul-10 Implement communications strategy Jan-07Jul-09Jan-10Jul-07Jan-08Jul-08Jan-09.
SUSTAINABLE AGGREGATES RESOURCE MANAGEMENT SARMa STATUS OF THE PROJECT & IT’S IMPACT Quality Management Board meeting Budapest, June 28, 2010 Lead partner:
Kick-off Meeting Granada, 16-17/04/2009 Agri-Multifunctionality II: Planning and partners’ tasks.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Ad hoc meeting WP3 progress Received information and future plan 28 June 2010, Budapest.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
The FNR_Rio Project Financial Progress Report FNR_RIO Project Team_Eritrea, in By: Mr Yonas Tekie.
Partner’s Roles Valuable partners, I want to remind our roles in project. And I want to get feedback from you about this. These are our roles in project,
SARMa Sustainable Aggregates Resource Management Kick off meeting June 2009 Bologna WP3 Activities 3.3: Recycling re-use of quarry and demolition.
2 Why do we need a “data revolution”? What do we want to achieve? How will we do it? Who should be involved? When will it be done?
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
South East Europe project: SARMa Sustainable Aggregates Resource Management Slavko Šolar Geological survey of Slovenia LEAD PARTNER.
ASTRONET Coordinating Strategic Planning for European Astronomy T HE N ETWORKING.
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
WP1 Project management Project progress + To do list Reporting Financial overview Urška Zelič, Alianta d.o.o. 7 th Consortium Meeting Ljubljana, 19 September.
2 nd Consortium meeting WP3 progress Preliminary evaluation of received information 4-5 February, Split.
SARMa – Sustainable Aggregates Resource Management WP4, Activity 4.1 workplan Tamás Hámor (MBFH) Second consortium meeting 4-5th February 2010, Split,
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
Green Partnerships Local Partnerships for Greener Cities and Regions Regional Energy and Environment Agency from North Alentejo (PORTUGAL) 5th SC Meeting.
4th Steering Committee Meeting Patras, July CHERPLAN Enhancement of Cultural Heritage through Environmental Planning and Management WP-6: Cultural.
Hungarian Central Statistical Office Handbook on Seasonal Adjustment STES WP June 2007 Methods and Practices on Seasonal Adjustment in the European.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Add the logo Of your institution Here. Goto -> View Master Sustainable Aggregates Resource Management in South-East-Europe (SARMa) The first EU project.
Regional Workshop to disseminate Water Supply and Sanitation Standards of Service, adapted to LDCs Préparation to the ISO TC 224 Drafts Standards test.
Antonella Fresa Roma, 12 December 2005 kick off meeting.
NATO CCMS Pilot Study Meeting, Athens 2006 | Slide 1 Applying Innovative Land Remediation Johan van Veen (TNO) NATO CCMS Pilot Study Meeting Athens, June.
Add the logo Of your institution Here. Goto -> View Master SARMa – Sustainable Aggregates Resource Management WP5 G.Tiess, M.Allaraj Montan University.
Essnet STAND-PREP Rome, 6-7 June 2011 Rome, 6-7 June 2011 ESSnet “Preparation of standardisation” WP1 report: outline of the report, content, responsibility.
SARMa – Sustainable Aggregates Resource Management WP3/Activity 3.3 (Recycling) G.A. Blengini, E.Garbarino Politecnico di Torino 3-5 February 2010, Split,
Meeting WP indicators May 31 - June 1, 2007; focus on development of the ECHIM shortlist Pieter Kramers Task Force on Major and Chronic Diseases Luxembourg.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Citizen Stewardship Outcome Kick Off Meeting 11/18/2014.
Scientific Coordination Project 3.2. Scientific coordination: from ESPON I to ESPON II ● Data ● Guidance on policy relevance and recommendations ● Research.
SAFESPOT Integrated Project CORE GROUP MEETING September the 12th 2006, Venaria Roberto Brignolo - IP Coordinator Centro Ricerche Fiat (Italy) September.
2050AP Project WP5: “Conclusions” UPM Madrid 11 de Octubre 2013.
WP7Joint and sustainable transport in health and care Action plan for the period July-December Dr Snežana Manić AdriHealthMob, Steering Committee.
EMSPI WP4/WP5: Indicators manual/guideline Project Meeting Duisburg, 10 th March 2015.
1 PRODUCTION OF A MANUAL FOR STATISTICS ON ENERGY CONSUMPTION IN HOUSEHOLDS MESH PROJECT 2 nd Working Meeting Madrid, 4 th May 2012 WP1: Administrative.
1 st Consortium Management Team Meeting University of Belgrade 27 th -28 th November 2014 WP8 - Management Progress Presentation (month 1- 12) Prof. dr.
Brussels, January 16th, Overview and status of the project.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
BENCH-CAN Internal evaluation 2nd semester
System Planning To Programming
Marine Environment and Water Industry Unit
Progress of the ESS.VIP ADMIN Special focus on the ESSnet on quality of multiple sources statistics. DIME/ITDG SG, Fabrice Gras, unit B1.
SARMa – Sustainable Aggregates Resource Management WP3 – Action 3.2
ESS.VIP ADMIN Sorina Vâju.
The basics ESSnet on SDMX prepared in 2008/2009
Work plan and next steps – RDE-LDV working group
Passenger Mobility Statistics 11 October 2018
SARMa – Sustainable Aggregates Resource Management WP5
RESOURCE MOBILISATION FOR SNA 2008 PROJECT
Aurora Hoxha & Drini Imami
Paolo Valente UNECE Statistical Division
Presentation transcript:

SARMa Emilia-Romagna & Parma Activity report End of June, 2010 Budapest, June, 28th

WP1 - Partner Project Management (of project relevance) ANPAR withdrawal – ER acquisition of activities and budget ANPAR activities revision WP2: international meeting at ECOMONDO, Rimini, Nov WP3: 2 new pilot sites in ER territory, best definition of LCA manual output WP4: Best integration of Recycling in WP4.2 (ER task leader) in term of Sustainable Supply, Planning, GIS Proposal under valuation by JTS New partnership agreement under signing ANPAR budget revision

WPCOMPLETEDIN PROGRESSNEXT STEPS OPEN PROBLEMS WP 2.2 Parma (Nov 2009) SARMa presentation Local Bologna (Dec 2010) WP3 – Pilot sites, GIS Regional\national Parma (May 2011) WP4 – Model sites, GIS, SSM Regional\national - WP 2.3 Bologna (Jun 2009) Project Kick-off Rimini (Nov 2010) Ecomondo WP3.3, 3.4 Recycling International -- WP2 – Meetings directly managed by ER+Parma

WPCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP3.1 pilot site quarry restoration SDB, BSR, PSR--- WP3.2 pilot site Illegal quarrying SDB, BSR, PSR PSR update final results of LIDAr remote-sensing experimentation -- WP3.3 coord. (See Blengini report for details) -  Coordination BSR-R, SDB-R  LCA document,  C&DW document  Ecomondo Nov 2010  C&DW manual will be presented  a draft of the LCA guidelines will be provided Several documents by other partners are still missing: see Blengini report WP3.3 pilot sites recycling - SDB-R, BSR-R for the new pilot sites “Madregolo” and “Castellarano” - Some problems in collecting required information at “Castellarano” WP3.4 synthesisSQSQ-R- In Italy data are difficult to gather at national/regional scale (provincial scale may be the best) WP3 – 3.3 Task coordination (dark colors); 3.1, 3.2, 3.4 contributions

WP ACTIVITIESCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP4.1 SQ SQ4.1 (some details are under revision of translation) - How about the SSM opinion pool by Tamas ? (for which stakeholders? In national language?) WP4.2 coordination Preparation of SQ4.2; GIS activities workplan Definition and preparation of BSR for 3 Model Site (MS) 4.2  Collecting SQ4.2;  Sinthesis Report 4.2 (+statistical synthesis from web questionnary ) Synthesis Report 4.2: 3 boxes Model Sites: Pella (???), Trebbia (natural area), Styria (economy) 1 box GIS-ER  GIS activities require contributions of Deborah and Fotini (Nikos); no contribution from Pella for Model Site WP4.2 SQ Model site (MS) quarrying in natural area SQ4.2 draft; Model Site Report (MSR) draft SQ4.2 MSR - WP4/5--  Contr. to Recommendations for GIS;  Contributions to WP4+5 final reports about “Planning for sustainability” - WP5.3- Contribution for WP4+5 manual: Best Practices for post- quarrying restoration - WP4/5 – 4.2 Task coordination (dark colors); 4.1, 5.3 contributions

WP ACTIVITIESCOMPLETEDIN PROGRESSNEXT STEPSOPEN PROBLEMS WP 2.2 Meeting Parma SARMa presentation (11/09) Meeting Bologna WP3 (12/10)Meeting Parma WP4 (05/11)- WP 2.3KOM Bologna (6/09)Ecomondo WP3.3, 3.4 (11/10)-- WP 3.1 (Lanca dei Francesi) SDB, BSR, PSR--- WP 3.2 (Taro River) Required: SDB, BSR, PSR* Indirect: LIDAr survey of the Taro river alluvial fan Integration to PSR (addendum including the final results of LIDAr remote-sensing sperimentation,). -- WP 3.3- SDB-R, BSR-R for pilot sites “Madregolo” and “Castellarano”. - Some problems in collecting required information at “Castellarano” site. WP 3.3 coordination-  Coordination BSR-R, SDB-R  LCA document,  C&DW document  Meeting Rimini (Ecomondo): 3-6 Nov 2010  C&DW manual will be presented  a draft of the LCA guidelines will be provided Several documents are still missing: see note below WP 3.4SQSQ-R- Some data are difficult to gather at national/regional scale, whereas at provincial scale may be easier. WP 4.1SQ4.1*- SSM opinion pool Tamas ??? (for stakeholders? national language?) WP 4.2-SQ4.2 (final draft); PSR Trebbia (final draft)Box GIS-ER in Sinthesis Report 4.2- WP 4.2 coordination  Preparation of SQ4.2;  GIS activities workplan  Preparation of BSR for pilote site 4.2  Collecting SQ4.2;  Sinthesis Report 4.2 (+statistical synthesis from web questionnary ) 3 Boxes pilot-sites 4.2: Pella (???), Trebbia (natural area), Styria (economy) in Sinthesis Report 4.2  GIS activities require contributions of Deborah and Fotini (Nikos);  no contribution from Pella for Pilot Site. WP 4/5--  Contr. to Recommendations for GIS;  Contributions to WP4+5 final reports about “Planning for sustainability” - WP Contribution for WP4+5 manual: Best Practices for post-quarrying restoration - ER+Parma Technical report (June, 2010) - summary table Dark colors for activities at Project coordination level – ER task leader