ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy.

Similar presentations


Presentation on theme: "ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy."— Presentation transcript:

1 ECO-INDUSTRIAL PARKS ENVIRONMENTAL SUPPORT SYSTEM GERMANY WORKSHOP 16/ 12/2010 Dr. Zeynep Yöntem General Director Ekodenge Engineering & Consultancy

2 EPESUS PROJECT AIMS  To design decision support tool in order to develop waste and energy management  To serve Small and Medium Enterprises (SMEs) within an industrial park or any communication network,  To improve their environmental requirements, managing their resource usage and waste management  To improve their energy efficiency.  To deliver a set of guidelines and best practices to the industrialists by the help of a software tool.  To provide guidance for waste minimisation and reuse, energy saving potential and optimization for the industrial establishments of an EIP through utilisation symbiotic relations.

3 WORK PACKAGES WP 1 – PROJECT MANAGEMENT WP 2 – DEFINITION OF WASTE MANAGEMENT PARAMETERS WP 3 - DEFINITION OF ENERGY EFFICIENCY METHODOLOGY WP 4 – INFORMATION SYSTEM DEVELOPMENT WP 5 – CASE STUDIES WITHIN INDUSTRIAL PARKS WP - 6 PREPARATION OF TRAINING MATERIALS AND THE TRAINING PROGRAMME WP 7 – DISSEMINATION AND EXPLOITATION

4 Feedback EPESUS INFORMATION SYSTEM Management Support Module Industrial Establishment Support Module CASE STUDIES DISSEMINATION WP3 WP4 WP6 WP7 WP1 MANAGEMENT WP7 DISSEMINATION WP2 WASTE MANAGEMENT ENERGY EFFICIENCY TRAINING WP5 Work Programme Diagram

5 Industrial Sectors  textile processing plants,  smitheries and foundries,  large combustion plants,  building industry  polymer plants.  We need processes input output data for calculation of waste composition and quantities.  We used the pre-defined processes from the library or individually specified processes for calculation  System boundary and data gathering report that also includes identification of the standard process flow module specifications

6 Progress of work plan in the period  EPESUS project has completed its 15 months at the end of November 2010.  PR 1 has been delivered for the first eight months. PR 1 has been aimed at developing the dissemination activities of the project and also establishment of the project technical baseline.  The second eight months of the project has been focused more on the development of the technical workloads.

7 Progress of work plan in the period  Progress on work package 2 Progress on work package 2  Activities of the work package 2 aimed at development of a detailed exemplary study in order to orient the partner. Each sectoral study should be synchronized in the same line. For this reason, the first delivery of the WP2 includes standard flow diagrams for one sector. The other sectoral studies are expected to be developed in the same procedure.  The exemplary study is carried out on the polymer sector. The PVC production data is compiled in LCA vision. These documents are presented in the annex x of technical documents. “Basic Definition of Standard Process Flow Module Specifications” document includes datasheets relevant with the PVC production phases.  The sectors are shared between the relevant partners. The partners’ contribution includes the sectoral studies under their responsibility. The partner’s contribution.documents will include the system boundaries of the sectors mentioned in the EPESUS project.  Basic definition of standard process flow module specifications

8 Work Package 2 Activities Progresson work package 2Position System boundary and data gathering report that also includes identification of the standard process flow module specifications Done Evaluation report of sample process input/output flow values of industrial processes for the 5 sectors February 2011 Guideline on recovery system for each category of hazardous waste, supply chain management system August 2011 Guideline on transfer and disposal options August 2011

9 Work Package 3 Activities Progresson work package 3Delivered (yes/no) Assessment report on energy efficiency tools and methodologies for buildings after the workshop in UK no Calculation methodology for energy efficiency in industrial operations yes Calculation methodology for energy efficiency in Buildings yes Guide for environmental friendly techniques yes

10 Work Package 4 Activities Progresson work package 4Delivered (yes/no) Analysis meeting evaluation report Done Software Requirements Specification (SRS) document Done Pilot Version of EPESUS Information System Information System August 2011 Test reports December 2011 Revised Software Requirement Specification Report February 2012 Final Version of EPESUS June 2012

11 Work Package 5 Activities Progresson work package 5Delivered (yes/no) Bug-feature tracking system October 2011 Case Studies Within Industrial Parks June 2011 Business plan November 2012

12 Work Package 6 Activities Progress on work package 6 Preparation of the handbook as a user guide and case study report of the EPESUS system. October 2011 Preparation of the handbook as a software based training and user support module October 2011 Preparation of Design strategies for Eco-Industrial Parks October 2011 Preparation of Management plan of EIPs October 2011 Preparation of Financial issues of EIPs October 2011 Preparation of Sustainability of EIPs October 2011 Preparation of Waste strategies of EIPs October 2011 Preparation of Energy strategies of EIPs October 2011 Preparation of training programme and its application October 2011

13 Work Package 7 Activities Progresson work package 7Delivered (yes/no) Dissemination and project web site Yes Exploitation plan On going

14 Progress of work plan in the period Progress on Work Package I against initial objectives: Position Communication regarding project activities Contribution of subcontractors, stakeholder for preparation of reports Management of the project web site Open Management of the technical management board Management meetings

15 Progress of work plan in the period Progress regarding performance indicatorsProgress regarding performance indicators(Improved environmental performance, Better use of natural resources Economic performance / market replication)  Performance indicators aim to define medium term improvements expected on environmental and economic parameters on the covered sectors/processes. Short term improvements cannot be measured until the system is deployed, tested and the users are trained.  The indicators of short term objectives can be in monitored by monitoring a relational gradual approach to the below mentioned mid term goals, starting from the deployment and use of the EPESUS system at the test sites in WP 4 and 5 and after the wider application of the EPESUS IS starting in month 28.

16  Progress regarding market uptake and exploitation Progress regarding market uptake and exploitation  EPESUS exploitation plan asserts details on how the project results will be exploited, especially for the primary and secondary users of the project activities.  It aims to set up the successful exploitation of the results both during the project lifetime and in particular after the project has been concluded. Progress of work plan in the period

17 Work plan for the next period Evaluation report of sample process input/output flow values of industrial processes for the 5 sectors February 2011 RMPM in SofiaJanuary 2011 Guideline on transfer and disposal options August 2011 Pilot Version of EPESUS Information System Information System August 2011 Case Studies Within Industrial Parks June 2011 Guideline on recovery system for each category of hazardous waste, supply chain management system August 2011

18 Neceseary Document From Partner  Original signed Partnership Agreement  Original signed Confidentiality Agreement  Original signed timesheets (From March 2010 to November 2010)  Payroll for each month  Flight Ticket for Kick-off Meeting  Boarding Pass of Kick-off Meeting  Hotel Invoice for Kick-off Meeting  Meeting room rental invoice  Other invoices

19 Thank You..