LHCb Week 27/11-01/12 2006D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.

Slides:



Advertisements
Similar presentations
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Advertisements

Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
Construction and Installation of the CLIC Experimental Area
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
LEA 27 August 2008D.LACARRERE1 BUFFER AREA FOR SLIGHTLY RADIOACTIVE COMPONENTS Underground - UXA Zone (protected area) Under DELPHI Barrel UXAUXB.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Technical Support Activities in PH-ADO-PO
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
Managing the LHC Experimental Area Point 5, CMS: Martin Gastal (PH/CME) Point 1, ATLAS: François Butin (TS/LEA) Point 2, Alice: Sebastien Evrard (TS/LEA)
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 12/10/2005 LHCb - Install Meeting 12/10/05 TS/CV/DC Installations STATUS Ongoing works 1.chilled / mixed.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
7 November 2003 Status of CNGS NBI presented by K. Elsener 1 Status of CNGS Konrad Elsener CERN – Accelerators+Beams Division.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
LHCb Radiation Shielding Wall – Status Wall Description Front Part 1 Aprox. 6 m Front Part 2 Aprox. 6.6 m Labyrinth.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
V. Bobillier1 Cable installation status.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
CALO News Pascal Perret LPC Clermont 22 January 2012.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
ELENA installation progress F. Butin / ELENA collaboration.
Demineralised water cooling system
CC LLRF SM18 test plan and BA6 infrastructure
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Cabling for LHCb Upgrade
The LHCb Installation Story
LHC Experimental Vacuum Systems Status October ‘07
CE Status: Activities executed until 03/08 and ongoing
LHCb & EYETS
LINAC 3 Meeting ICL machines Injectors
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures – Status & Remaining Works  Detector Services - Progress  Safety & Access EDMS No IP8

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team2 Access - Checking Personnel & Materials A A Zone = Protected Area B Zone = Detector Area C Zone = LHC Cryo Area ACCESS PERSONNEL PZ SHAFT CHICANE MOBILE DOOR Normal Access Emergency exit IP8 MAIN ACCESS EQUIPMENT PX SHAFT ACCESS PM SHAFT RADIADION SHIELD FENCE FIG. 1 WORKSITE Oct. 06 – June 07 C OT Assembly Area B UX85 Area (Nov.06)

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team3 12/ /200704/200706/2007 FIG t heavy concrete Average thickness about 3.2 m Apertures ( 2 slits 6400 x 350 mm2) for Services & Cabling 12/2002 Chicanes for ventilation & gas extraction ducts Radiation Shield – Installation

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team4 Radiation Shield – Upper Part September 06October 06 November 06March 07 EUCLID Mockups performed by N.LEFEVRE Rail & Crane1 st layer Access structure Wall installation 4 PHASES FIG. 3

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team5 Radiation Shield – Front Part (1) April 07 EUCLID Mockups performed by N.LEFEVRE FIG. 4

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team6 Radiation Shield – Front Part (2) EUCLID Mockups performed by N.LEFEVRE May 07 FIG. 5

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team7 EUCLID Mockups performed by N.LEFEVRE June 07 Radiation Shield – Front Part (3) FIG. 6

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team8 Radiation Shield – Segmentation Basic concrete blocks 2400x1600x800 mm3 Weight = 7.5 t Nb = 350 FIG. 7

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team9 Structures – Status & Remaining Works - Access tower for HCAL : ACHIEVED Sept Extraction ducts (4) via PZ shaft : ACHIEVED Oct.06 - Additional Platforms (4) for MUON : ACHIEVED Oct.06 - Re-configuration cryo-platform for OT : ACHIEVED Oct.06 - Access structure for upper shield : Ongoing - Platform for RICH1 gas rack : ACHIEVED Nov Platforms for TT (C side) : ACHIEVED Nov Fences behind MUON chamber 5 : ACHIEVED Nov Platform above Control Access (UXA-A1) : Design ; Scheduled Feb.07 - Various modifications to barriers, fences, & grounding. 13 September 2006 In brief

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team10 Metallic Platform UXA-A1 UX85 CONTROL ACCESS A1 A2 A3 EUCLID Mockups performed by N.LEFEVRE FIG. 8

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team11 Detector Services - Progress  Installation of the cable trays : about 98% achieved; Remaining works : mainly cable trays above gantry for Calorimeters  Dec. 06  Water (mixed) pipes : major pipes ready at the proximity of the sub-detectors; Remaining piping works for such as Calorimeters & MUON towers scheduled for Sept.- Oct. 06; now re-scheduled for Dec. 06 – Jan. 07.  Gas pipes from surface (SG8) to underground area : Achieved up to UXA-A3; Remaining piping works : mainly pipes on the gantry up to the bunker (Illustration refer to next slide); sched. for Oct. - Nov. 06 ; now re-scheduled for Dec Jan.07  Other Cooling Systems C6F14 (IT, OT, TT, RICHs) : Ready to be connected.  SNIFFER System : installation achieved up to the proximity of sub-detectors.  Cabling (long distance) : well advanced (lots 1,2,3, 5 + groove); lot 4 (VELO) scheduled for Jan.- Feb. 07 (refer to V.Bobillier’s presentation at the commissioning meeting held 27 Nov. 06) In brief

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team12 GAS BUILDING SG8 SURFACE UNDERGROUND AREA UX85 A ZONE POINT 8 – GAS DISTRIBUTION SYSTEM FOR LHCb Schematic View UX85 B ZONE RB 86 SIDE RB 84 SIDE LHCb DETECTOR PASSAGE GAS CONTROL RACKS P1 P2 P3 P4 RADIATION SHIELD C ZONE CAPTION Gas pipes from surface to A area Gas pipes from A area to B area Gas pipes on the gantry to the passage IP8 P5P6 Gas Distribution System (1) ACHIEVED IN PREPARATION FIG. 9

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team13 POINT 8 – GAS DISTRIBUTION SYSTEM FOR LHCb Gas pipes (to be installed) on the Gantry P2P4 PASSAGE A SIDEC SIDE 14 pipes 16 pipes 14 pipes 19 pipes P5 P6 11 pipes P1 P3 LHCb DETECTOR 2 pipes 5 pipes to Muon Tower 5 pipes to Muon Tower Details Table 1 31 pipes Details Table 2 Including 1 exhaust Including 1 exhaust Ref. : Tech. Specs EDMS no – Drawing LHBIEGA_0035 AA Gas Distribution System (2) FIG. 10

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team14 Price Enquiries - Summary  REFERENCE DRAWING : LHBIEGA_0035 AA  TECHNICAL SPECS : edms  PRICE ENQUIRIES : DO Sept. 06; Offers Oct. 06 (week 43) 6 firms contacted; 3 offers; 3 declined; results refer to Table 1 SUPPLIERSTOTAL PRICE (for adjudication) SUPPLIER CHF SUPPLIER CHF SUPPLIER CHF Ratio Table 1: Results of DO  SUPPLIER 1 : CRIOTEC IMPIANTI S.R.L CHIVASSO -Italy  ORDER : DAI dated of 30/10/2006 – CA in Nov. 06  SAFETY DOCUMENTS : PPSPS; WP & VIC in preparation (5 Dec. 06)  STARTING WORK ON SITE (C Side) : 11 Dec. 06 until Jan. 07 ? Gas Distribution System (3)

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team15 Safety Issues  New Fire Extinguisher Network : in operation both areas A & B.  Smoke Detection System : in operation both areas A & B.  Oxygen Deficit Hazard (ODH) System : in operation (detector area).  RADMON System : in operation, except 1 monitor to be installed at the balcony - electronic racks (re-scheduled for Dec. 06).  RAMSES : major equipment installed; cabling ongoing until Oct. 06; commissioning scheduled for Nov. – Dec. 06.  ACCESS CONTROL (LHC system) : equip. installed in UX85 (Aug. 06); commissioning ongoing; in operation expected by end of 2006 REMARK : Badge Reader (ex-LEP) at surface will be replaced mid-Jan. 07 (2 weeks needed; new badge “MIFARE”) will be required & mandatory; Biometrics access will be used later (May-June 07)

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team16 September 2006 Access Control System (Hardware) UX85 – A zone MAD (Materials) Control Rack PAD (Personnel) Chicane to B zone Access (New System) FIG. 11

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team17 Summary GOOD PROGRESS AT PIT 8. NO MAJOR CONFLICTS ARE EXPECTED WITH THE MACHINE COMMISSIONING PROGRAMME, IN PARTICULAR WITH CRYOGENICS BOTH SIDES OF THE LHCb EXPERIMENT (Sectors 8-7 & 8-1). INFRASTRUCTURE IS PRETTY FINISHED EXCEPT RADIATION SHIELD FORESEEN FOR JUNE 07. THE DETECTOR SERVICES ARE ALMOST READY FOR CONNECTING TO SUB-DETECTORS

LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team18 10 November 2006 SPECIAL THANKS TO DBS (Crane drivers) & OUVAROFF (Scaffoldings) COLLEAGUES FOR THEIR EXCELLENT WORK IN UX85 AREA Acknowledgments