Agreement on W 0 Value. Tide Gauge comparisons limited to where SST models exist 2 62,636,856.00 m 2 /s 2.

Slides:



Advertisements
Similar presentations
Texas Behavioral Risk Factor Surveillance System (BRFSS) Turning Information Into Health.
Advertisements

Supplemental Figure 1 A No. at risk T T T
ROSS 4/3/2014. Overview  ROSS NexGen  Background  Next Steps  ROSS Operations and Maintenance  Field Reviews.
Who “Owns” the Data? Who “Owns” the Data? Dr. Joy Hatch Harford Community College EDUCAUSE Southeast Regional Conference.
Comparison of Gravimetric Geoid Models Over the Great Lakes Region Daniel R. Roman and Xiaopeng Li.
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
Job Survey Results For MSW Graduates University of Michigan School of Social Work Office of Student Services.
Citrix Systems Moving From a Printed Paper Process Problem –Supporting the New Hire Orientation process with limited staff and resources Audience –New.
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
45 th Annual Alaska Surveying & Mapping Conference February 21-25, 2011 Hilton Anchorage Hotel Impact of Airborne Gravity Surveys on Geoid Modeling in.
©SHRM 2008SHRM Weekly Online Survey: February 13, Benchmarking Metrics Sample comprised of 423 randomly selected HR professionals. Analyzing 423.
NOAA Hurricane Conference 1 December 2009 Miami, FL NOAA Aircraft Operations Center MacDill AFB, FL Jim McFadden, Jack Parrish, Paul Flaherty and Nancy.
 Objective: Collaborate with the DWR’s Division of Integrated Regional Water Management’s Regional Offices to produce land and water use data for the.
1 Applications of the CORS System Richard Snay & Giovanni Sella National Geodetic Survey National Ocean Service, NOAA NOAA GNSS Workshop Boulder, Colorado.
Research Support Services UCH Facility Use Approval Workflow Management Update Jennifer Holcomb.
Case Study Milford Wind Corridor Project Presenter: Lucas Lucero, Washington Office Project Manager Phone:
GRAV-D Project Update Vicki Childers, Ph.D. GRAV-D Project Manager.
Rate Reform Research and Communications Committee April 7, 2011.
Navigation Systems Assignments for “TOP” Priority “Verify” 1/3 of the PATONs in each patrol area. These aids will be scheduled and will list.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
Massachusetts All-Payer Claims Database: Technical Assistance Group (TAG) June 09, 2015.
Training begins in… 15:00 minutes Training begins in… 14:00 minutes.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
SLC Parks & Public Lands Athletic Field Reservations and Fee Changes January 9 th, 2013.
Continuous Learning Module (CLM) Status Update Defense Acquisition University.
Do Work Safely DOE Hanford Site Recovery Act Support to New Workers Ted Giltz Hanford Site Recovery Act Project Manager
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
CIVILIAN HIRING REFORM Future Army Hiring Process – The Future Is Here! Civilian Human Resources Agency 1.
NAME 2004 Field Operations and Procedures NAME Special Session Field Operations Center Concept: Define requirements for, and conduct the day-to-day operations,
Department of Energy EVM Update NDIA Program Management Systems Committee August 17, 2005 Mike Donnelly Office of Engineering and Construction Management.
Just Culture Collaborative Jill Hanson and Stephanie Sobczak Certified Just Culture™ Champions WHA 1.
HR: Leading People, Leading Organizations © 2006 SHRM SHRM Weekly Online Survey: October 31, Holiday Schedule Sample comprised of 502 randomly.
 Updated the NMAC organization chart to reflect membership changes; USFS representative is Steve Gage and NMAC Group Coordinator is Susie Stingley-Russell.
United States Joint Forces Command Joint Warfighting Center United States Joint Forces Command Joint Warfighting Center Ken Enriquez Joint Support Division,
RIDE III Financial Update October 8, Revised Estimates  At last meeting, briefed an eight-year revenue estimate of $530M.  Since last meeting,
California Integrated Waste Management Board Scope of Work for the Enhanced Enforcement, Security Assistance, Education, Training, Investigative Assistance,
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
State Wide Managers’ Meeting-May 11, 2015 Sandy Williams Barbara Burkett.
National Agriculture Imagery Program 2006 NAIP Contract Plans December 5, 2005 USDA NAIP Planning Meeting Salt Lake City, Utah W. Geoffrey Gabbott, Contracting.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES NOAA’s National Ocean Service Center for Operational Oceanographic Products and Services.
Progress towards a common North American Geoid in 2012 Daniel Roman, Yan Wang & Xiaopeng Li National Geodetic Survey Geosciences Research Division.
1 August 26, 2009 LTG Mikio Shibata Commanding General, Central Readiness Force Japan Ground Self-Defense Force Future Direction for International Cooperation.
Technology Open House STScI Technical Training Program Status Mark Abernathy December 2 nd, 2004.
GRAV-D: NGS Gravity for the Re- definition of the American Vertical Datum Project V. A. Childers, D. R. Roman, D. A. Smith, and T. M. Diehl* U.S. National.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
Building Division FY2011 Second Quarter Report. 2 nd Quarter Revenues October$93,154 November$53,049 December$50,033 Average Monthly Revenues$65,412 Total.
Photos by Susie Fitzhugh Bell Times Analysis Task Force Review, Update and Recommendation Subgroup 5/14/2015.
Georgia State University’s Budget System (GSUBS) Denise Floyd & Mary Renfroe Office of Budget & Planning.
Information Technology Update October 20, 2014 Lawanda Parnell Chief Information Officer.
PR70007 – MarkeTrak Ph2 ERCOT Marketrak Task Force February 7, 2008.
THE HOT AIR BALOON Dimitris Silitzoglou.
Phase 2 Tollgate Review Discussion Template
Matt Erickson, Office of the CIO
Overview of the PAT Implementation Process Materials Developed by The IRIS Center at the University of Maryland.
Phase 2 Tollgate Review Discussion Template
How is timetabling changing in the new structure
Chester County Hospital Penn Chart Update
Program Highlights
Phase 2 Tollgate Review Discussion Template
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Contoso Human Resources
LUCAS SURVEY 2015: an update on current survey
GA Safety Performance Final FY17 GA Summit 2017.
PCS User Group Vienna, 13th September 2017.
NRC Type B Package Certification Process, Issues and Updates
Welcome! _________________ October 13 and 14, 2009 HR Forum
Customer Service Update
Dates with availability
Army Team C4ISR BRAC Update
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

Agreement on W 0 Value

Tide Gauge comparisons limited to where SST models exist 2 62,636, m 2 /s 2

Q1: 32% Q2: 34% Q3: 36% Q4: 40% STATUS RISKS FY13/14 TIMELINE Survey surveying Sandy Supplemental blocks, almost complete with 2 nd and 3 rd in Pennsylvania and Maryland BLM Pilatus survey started out of Omaha Data Release Northern Alaska released in October Sandy Supplemental next in priorities  Backups for Field Team  More stability in field teams would reduce need for continuous training and uncertainty, hiring in process but very slow  In addition to HR, hiring contractors has been frustrating  Sandy Supplemental  Additional work of QC and troubleshooting with two surveys  Strain on office staff  Permission for Mexico Flights  Uncertainty of how permission for flights over Mexico will proceed. A backup plan for surveying will be developed, but the survey may need to be adjusted at the last minute. GRAV-D Monthly Update – October FY13 For Internal Use Only Prepared 11/4/2013 High risk Medium risk Low risk FebSepOctNov NH13MD13NC13 NE14 BLM Pilatus PC-12 Fugro Cessna Conquest II or King Air E90 Navy King Air C-12 NOAA Turbo Commander Aircraft: Sandy Supplemental - exact schedule determined by contractor DecJan TX14 MarAprMay AK14 Jun * We spent more than is shown and have more labor costs but this hasn’t been updated yet in MARS