Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Pinwheel Build-It-blocks Creative Robotics.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Typical Walk-in Closet with elfa® décor
Pneumatic Arm Assembly Instructions
Scratch Robots Catapult. Premium Quality Junk Modules Catapult – Step 1 Parts: - 8.5” x 11” cardboard - 4”x6” Foamie - 1 Starbucks.
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
USE A SHEET OF LINED PAPER AND FOLLOW THE INSTRUCTIONS PLEASE NOTE: We are using lined paper to make the drawings easier for you. 1.DRAW A HORIZONTAL.
DESIGNING AND BUILDING A PROJECT By Dr. Kenneth Holmes.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
PLAN #PartProcessTools and equipmentQuality controlSafety *Aprons must be worn is ALL stages of manufacture Tim e 1 MDF base Mark out on MDF piece Pencil,
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Hybrid Integrated Circuit
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
This is a fold-down clothes bar that will hold up to 12 plastic clothes hangers or even more wire hangers. As I don’t have a trailer wall to put it on,
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
FVTX Review, November 16th, FVTX Mechanical Status : Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. PowerPoint to accompany Krar Gill Smid Technology of Machine.
Another "Aha!" puzzle “Blockhead”
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
QMUL 2/2/12 1  Current status of new alignment system.  Drawing status update.  Laser alignment.  Module removal from frames for new kit.  Stave(lets.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Homework: Use the information that you gathered this week to draw out your plan view working drawing, 1:1 scale. Use sheet 6. Hand in next week. Start.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Bridge Project. Materials – 8 pieces of wood, glue, cutters, masking tape and a ruler.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Stave production.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
 Segmented Bowl Senior Woodwork. Overview  Materials and machines  4 step procedure: layout, cutting, laminating, turning.  Final product.
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
VEA’s proposal of automated assembly system WP6 meeting, 16/01/14.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
BM&N STS ladders assembly in VLHEP
GEAR CUTTING PREPARED BY SOUNDHAR.A
The Complete Guide to Mounting Images
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Build-It-blocks Creative Robotics
Micro Vertex Detector of PANDA Strip Detector
Gluing jigs for Demonstrator
Reminder of Stave250 Tooling Design
GEAR CUTTING.
Braze Test.
Presentation transcript:

Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014

Manufacture status Foam block alignment jig – Making 2 sets – Main parts (alignment frame) have finished – End clamping pieces to be done, hopefully by middle of next week C channel placement jig – Making 2 sets – Main frame parts have finished – Side clamping pieces to be done, hopefully by the end of next week 1 of gluing bath jig (for gluing the top face sheet) 1 of masking ruler Other parts: – Allcomp foam blocks – machined the grooves for the cooling pipe and to the correct sizes (See back up slide for the procedures). – Z=0 End closeout (PEEK) – 2 off – Z=1.3 End closeout (PEEK) – 2 pairs – 10mm and 8mm in diameter location pins (4 off each) Later next week

Foam block alignment jig

C channel placement jig

New locking point: extended part to stave core Lock arm Proposed new locking point Need to know the locking point spacing. Does the locking point has to be placed between the two modules? (The current spacing showing on the drawing are arbitrary.) On the back face of the CF C channels, the square holes for the extended arm of the locking points into the stave core, need to be cut, before gluing to the face sheet. Locking arm housing will be glued to the face sheet after C channels are glued. (Tooling for this process needs to consider.) In-core locking arm housing

Back up

Use the double sided sticky tape to stick the foam block onto these area before machining. Reference faces By Bob Cooke