Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’

Slides:



Advertisements
Similar presentations
Preparing a Curb Ramp Project December 15, Tiers of Project Types Non-Signalized Curb Ramp Reconstruction - Typically utilizing standard plans.
Advertisements

Unit 12 Construction Surveying
Construction Surveys
Subdivision Plat Submittals Subdivision Plat Submittals
Phase I Environmental Site Assessment
Legal Descriptions and Site Plan Requirements
Cost Estimation System Tool
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Elements of Surveying (CEL271)
Standards of Practice Route Surveys Title 46 Professional and Occupational Standards Part LXI. Professional Engineers and Land Surveyors 1.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Earthwork for Designers. What needs to get done first? Request Conventional/Photometric Survey Preliminary Plans - should be prepared once horizontal.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Layout a Project. OVERVIEW Familiarize you with techniques and procedures in staking / laying out a project using an Trimble S6 and R8 GPS – Controlled.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Contour and Topo map Applications Profile View (Longitudinal Sections): Roads, Canals, Pipes,… Cross-Sectional View, Roads, Canals, Pipes, Building,…
ENGINEERING SURVEYS DEFINITION Surveying has to do with the determination of location of points on or near the surface of the earth. It is the art/science.
Civil Engineering Surveying
CASE STUDY PLSS 3 MILE RULE SUBDIVISION OF SECTIONS (INDIAN LANDS) Warm Springs Indian Reservation.
Working with 3D Models in Design & Construction Panel Discussion 1.
How GIS and Land Surveying at Created by: Riley Lindsay Created by: Riley Lindsay can help local government?
Blue Prints.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Chapter 14 Legal Descriptions and Site Plan Requirements.
Engineering and Technical Plans Description, process and standards Dh 2005.
Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Essential Skills: Reading and Interpreting.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
MnDOT-ACEC/MN Annual Consultant Conference March 5, 2012 Leveraging SUE Data for Utilities on Projects Tom Swafford- Utility Mapping Services, Inc.
Chapter 12 Legal Descriptions and Site Plan Requirements.
Civil Engineering Surveying Prepaid by:
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Chapter 46 Commercial Construction Projects. 2 Links for Chapter 46 Types of Drawings Floor Plans Elevations Site Plans.
Chapter 15 Site Plan Layout. Driveway style and Slope Design Considerations  Minimum lawn slope of 5% for first 10’ (5/8” per foot)  Minimum concrete.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
What is a map? Civil Drafting?
CE303: Introduction to Construction Blueprint Lab.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Introduction Left: Old Kenston High School was built in 1950 Right: New Kenston High School was built in 2006.
Planning Construction Chapter 15. Private Sector  Most buildings and other structures are built for ordinary people. These people make up the private.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
Dagnabbit, this is good stuff !!! SURVEYING ENGINEERING SURVEYS USDA - NRCS Construction Inspection for Field Office Activities 1.
Chapter 1 Introduction to AutoCAD Civil 3D 2009 Learning Objectives: Understand basic features of AutoCAD Civil 3D Start AutoCAD Civil 3D Understand.
Chapter 2 Reading Site Plans. Chapter Overview Introduction to Reading Site Plans Understanding Legal Descriptions Site Plan Fundamentals Topography Reading.
PowerPoint Presentation
ARCHITECTURAL DRAWINGS
Profile Leveling.
CONSTRUCTION MASTERS BONUS BONUS
Common Surveys Used For Commercial Real Estate Transactions
Coursework guidelines
Commercial Construction Projects
Civil Engineering Surveying
Chapter 15 Site Plan Layout.
Architectural Drafting Unit 2
Site Plan Requirements
INTRODUCTION OF GEOMATIC
Competency: Create site plan drawings
Walker Street Reconstruction Project 25% Design Public Hearing
Chapter 6 Site Construction.
Presentation transcript:

Civil Engineering Surveying Roy Frank

Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’ to 1”- 200’) 2.Identify Alternative Routes (corridors) 3.Corridor Study 4.Public Hearings on selected corridor

Basic Route Survey and Design 3.Alignment Design 1.Preliminary medium scale mapping of corridor 2.Paper location study 3.Choose desired alignment 4.Field location survey 1.Set PI’s 2.Measure angle and distance between PI’s 3.Choose and design curves 4.Compute alignment 5.Set centerline stations (Hubs at 100’ STA. + PC & PT) 5.Modify alignment if needed

Basic Route Survey and Design 4.Roadway Design 1.Supplemental Large Scale Mapping 1.Horizontal mapping 2.Cross section baseline 2.Design typical sections 3.Design roadway items 4.Draft plans 5.Compute quantities 6.Prepare specifications

Basic Route Survey and Design 5.Right of way surveys 1.Requires parcel and strip maps 1.Determine ROW widths required 2.Perform property surveys 3.Prepare legal descriptions 4.Stake parcels

Basic Route Survey and Design 6.Construction surveys 1.Reference PI, PT, PC 2.Slope stake for rough grade 3.Stake drainage and structures 4.Layout roadway items 5.BlueTop for subgrade of final grade 6.Progress measurements and cross sections for pay quantities 7.As built surveys

Sewer Projects 1.Firm under contract 2.Preliminary studies 1.General layout map 2.Buildings located on general layout 3.Treatment site search 4.Preliminary paper layout 1.Make sure every building and potential building site can be served 2.Manhole system placed on general layout

Sewer Projects 5.Preliminary filed work 1.Preliminary profiles 1.BM system established 2.Manholes set 3.Profiles run 4.Basement elevations acquired 2.Design mapping 1.Final plans 3.Treatment area 4.Boundary survey 5.Complete topo of area

Sewer Projects 3.Design process 1.Sewer line design 1.Preliminary profiles drawn 1.Basement elevations plotted 2.Manholes placed on profiles 3.Slope between manholes computed 4.Problem areas – alternate service routes selected 1.Manholes set in field 2.Profiles run 3.Revert to 3A

Sewer Projects 2.Treatment plant design 1.Topo map prepared 2.Type system verified 3.Treatment system sized based on existing and projected population 4.System designed 3.Plans drafted 1.Sewer plans normally prepared on plan/profile sheets

Sewer Projects 2.Treatment plant drawn using plan sheets and cross sections 3.Quantities computed 4.Specifications 1.Written instructions on how every item to be built 2.Include contract documents and bid proposal 4.Bidding procedure 1.Notice of bid advertised on local paper 2.Pre-bid meeting

Sewer Projects 3.Bidding 1.Each contractor submits sealed bid 2.Bids opened and tabulated 3.Engineer reviews proposals 4.Engineer recommends which bid to accept 4.Contract awarded

Sewer Projects 5.Construction 1.Surveying 1.Contractor required to hire surveyor for stakeout 2.Manholes referenced 3.Staking methods 1.Batterboard method 2.Laser method 4.Measurement of quantities 6.As Built

Water distribution systems 1.Put under contract – water district formed 2.Preliminary studies 1.General layout prepared 2.Water district signs up users 3.Water source located 4.Waterlines placed on general layout 1.Hydraulic gradient plotted from USGS topo

Water distribution systems 5.Pump station and water storage sites 1.Property acquired by perpetual easement or purchased 2.Boundary survey performed for each site 3.Topo each site 3.Field work 1.Plan preparation 1.Normally photogrammetrically 1.Flight plan sent on general layout 2.Take photos and post measure horizontal control 3.Plan sheets marked on photos using template

Water distribution systems 2.Waterlines placed on plan sheets 2.Crossings and easements 1.Every location where waterline crosses paved road, railroad – has to be topo, cross sectioned, and tied to nearest stationing or milepost 2.Crossings plotted and permits applied for – railroads, state DOT, township and county roads 3.Easement descriptions prepared

Water distribution systems 4.Final design 1.All waterlines and appurtenances on plans, easements, acquired and in docket form, rock excavation on plans 1.Quantities computed 2.System driven to make sure nothing missed 2.Tanks and P.S. 1.Designed and sized 2.Quantities computed

Water distribution systems 5.Bidding 6.Construction 1.Water distribution system 1.Waterline stakeout 1.Each easement plotted on plans 2.Crossings as permitted staked 2.Quantities 2.Tanks and PS 1.Foundation staked 2.Must be checked for plumb 7.As built

Architectural Projects 1.Firm Under contract 2.Preliminary fieldwork 1.Boundary survey 1.Description provided 2.Fieldwork 1.Monument search, traverse site 2.Compute data and analysis 3.Final stakeout 3.Easement and encroachment search 4.Plat of survey

Architectural Projects 2.Topo – grid method most common 1.Grid pattern 25’ – 100’ 2.BM – USGS 3.Entire tract topo and adjacent areas to access 4.Utilities – nearest tied in 5.Include all objects above, on or below, ground 6.Prepare topo map 7.Field check map

Architectural Projects 3.Construction 1.Control 1.If large building – you may want to establish TBM’s on control Mon. 2.Stakeout 1.Convert architects dimensions to engineering 2.Layout clearing and excavation limits 3.Layout underground piping

Architectural Projects 4.Layout footings and foundations 5.Layout building corners and supports 6.Locate roads and parking areas 7.Locate lighting and other project extras 3.As built

Structure and Terrain Movement Used to monitor: 1.Movement of buildings ( x, y, and z) 2.Movement of bridges 3.Movement of dams 4.Landslides and earthquakes 5.Amusement park rides

Structure and Terrain Movement Description – error within system must be less than smallest movement to be observed 2 groups of monuments installed 1.Reference or control monuments 2.Deformation or movement monuments

Structure and Terrain Movement Control – generally concrete pillars extending 3-4 feet out of ground with tribrach permanently attached Movement monuments – for earthquake or landslide may be similar deep monuments

Structure and Terrain Movement Equipment: 1.GPS 2.Turned angles 3.Angle/Distance 4.Leveling