Unit 17 Building Regulations Assessment Number 3 Date of issue : June 5 th 2015 To be submitted by: June 26 th 2015 This assessment provides an opportunity.

Slides:



Advertisements
Similar presentations
Writing an Extended Essay in Peace and Conflict Studies
Advertisements

Purchasing Card Training Uintah School District. How do I get a purchasing card? Each building/program administrator assigns cards as needed at their.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Michael Martin - Cert IV - Codes and Standards 2012
EDD/581 Action Research Proposal
Completing your Production Log. Page no.ContentsCompleted by.... Page 1 Front sheet  Completed by candidate, signed by both candidate and supervisor.
EvalS Application User Guide version September 17, 2011.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
Internal verification and external standards moderation.
Visitability Standards Dan McNabb, Deputy Building Official Planning and Development Review Department.
Lesson One – Introduction & History
Information Processing Information Technology and The Law The Web-site Assignment.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
ASPEC Internal Auditor Training Version
Quality Representative Training Version
Assessment Activities
Responding to Inspection Findings
1 Licensing Scheme for Drug Dependent Persons Treatment and Rehabilitation Centres.
Learning projects An overview. Learning projects A learning project allows a learner to design and undertake an independent and unique short program of.
BY Karen Liu, Ph. D. Indiana State University August 18,
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
Authorization and Inspection of Cyclotron Facilities Inspections.
ONLINE FILING WORKSHOP Presented By: The Indiana Lobby Registration Commission 1.
Welcome to BLT Online NQT Induction. Points We Will Cover: What is BLT Online NQT Service? What are the advantages of using it? User roles on the site.
Entry Pathways General Administration September 2012.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
The Basics of the Effort Certification and Reporting Technology (ECRT) System.
Instructional Plan | Slide 1 AET/515 Instructional Plan December 17, 2012 Kevin Houser.
What Documentation Needs to be Submitted With an Approval Application?
COMP 208/214/215/216 – Lecture 8 Demonstrations and Portfolios.
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Take One! January 28, How Do I Become A “Good” Teacher?
WELCOME MESSAGE! Welcome to your distance learning Preparing to teach in the Lifelong Learning Sector (PTLLS) COURSE, my name is Prisca Kennedy and I am.
COMPULSORY BRIEFING SESSION Enterprise Wireless Solution (Wi-Fi) RAF /2015/00022 Date: 18 January 2016 Time: 11:00.
King Saud University- College of Engineering- Dept of Chemical Engineering GUIDELINES AND RECOMMANDATIONS FOR THE PREPARATION OF GRADUATE PROJECT I AND.
Code Officials and the Code Process.  Concentrates on the code process as a whole.  Different type of code officials  Various steps that are taken.
Level 2 Unit 1 Exploring the Engineering World Engineering Diploma Level 2 Unit 1 Exploring the Engineering World An Approach to Unit Delivery and Assessment.
Unit 17 Building Regulations Assessment Number 2 Date of issue : April 21 st 2015 To be submitted by: May 19 th 2015 This assessment provides an opportunity.
Building Act Post Moratorium Reforms Occupancy Certification System Department of Lands, Planning and the Environment May 2016.
Responding to Invitation to Tenders Michael Fowler Category Manager – Procurement Brian Davies Senior Procurement Officer.
Collecting Copyright Transfers and Disclosures via Editorial Manager™ -- Editorial Office Guide 2015.
Student name: ………………………………………….…. Course of study: (Please tick)  National Award (pt)  National Award (ft)  Extended Diploma (ft) Unit 1 Health, Safety.
UNIT 5: NON EXAMINED ASSESSMENT PRESENTATION JANUARY 2016 This presentation has been amended following the publication of the revised JCQ regulations for.
M253 Students Study Guide Mrs. Fatheya Al Mubarak – AOU Dammam.
Module Code : AURH453 Management Principles Assessment Number 1 (a) Nature of Industry In the form of an illustrated written report Weighting : (part)
CHIETA Regional Skills Forum 2016: Learner Administration Matters Thapelo Modisaemang 1.
Student name: ………………………………………….…. Course of study: (Please tick)  Subsidiary Diploma(pt)  Extended Diploma(ft)  Diploma (ft Yr 2) Unit 51 Civil Engineering.
Student name: ………………………………………….…. Course of study: (Please tick)  Subsidiary Diploma(pt)  Extended Diploma(ft)  Diploma (ft Yr 2) Unit 51 Civil Engineering.
Unit 17 Building Regulations Assessment Number 1 ‘History and Purpose’ Date of issue : March 23rd 2015 To be submitted by: April 29th 2015 This assessment.
Rehearsal Skills and Live Music Performance (Criteria)
Welcome to BLT Online NQT Induction.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2015/00010 & RAF/2015/00011 Date: 18 June 2015 Time: 11:00.
ASSESSMENT COVER SHEET
TCP LIMS – Animal Use Protocol Management
Office Alterations RAF/2012/00027 Compulsory Briefing Session
The Public Sector Equality Duty (PSED) & Integration Joint Boards
Please send completed application form to:
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
EDD/581 Action Research Proposal (insert your name)
LO3 - Be able to Present Business Solutions to Stakeholders
Information and Site Visit for tender: “supply and installation of furniture and related services” EIOPA/OP/50/2014 Frankfurt, 12 May 2014.
EDD/581 Action Research Proposal (insert your name)
2017 HUFS∙YTN Middle and High School Student English Debating Contest
NATIONAL QUALIFICATIONS FRAMEWORK AMENDMENT BILL
Project journal: Project title goes here
PERSONAL DETAILS OF NOMINEE
Introduction Fact-Finding Meeting Proposal Meeting
North Carolina Department of Insurance Office of State Fire Marshal
Unit No.5: Working with Parents and Others in Early Years
Presentation transcript:

Unit 17 Building Regulations Assessment Number 3 Date of issue : June 5 th 2015 To be submitted by: June 26 th 2015 This assessment provides an opportunity to complete the criteria described in the shaded boxes below. Please refer over the page for the assessment tasks you will need to do to satisfy the criteria identified. Signed: Date: Tutor Signed: Date: IV pre-issue Signed: Date: IV post-assessment Please turn over for assessment tasks…….. Achieved? 1stfinal P1Examine the factors that have influenced the historical development of building control and explain their significance P2Discuss the legislation and documentation associated with building control and their application P3Identify the various Approved Documents that comprise the building regulations P4Describe the application and enforcement of the Building Regulations P5Explain the approval procedures used in Building Control P6Evaluate the documentation used to support Building Control applications. P7Discuss the powers of local authority Building Control officers and approved inspectors P8Produce a specimen Building Regulations application, with all necessary documentation M1Explain the particular implications of the Building Regulations for low rise domestic and commercial construction M2Propose answers to two queries related to the interpretation of the Building Regulations M3Explain the procedures used to enforce the Building Regulations D1Justify the proposed solution to two separate Building Regulation issues D2Evaluate the specimen Building Regulation application, with all necessary documentation Student name: ………………………………………….…. Course of study: (Please tick)  Extended Dip. in Const. (ft)  Diploma in Const. (pt) tutor Jamie Owens

Unit 17 Building Regulations Assessment Number 3 T his assignment is intended to further expand upon your knowledge of the application process; the powers of approved inspectors, the procedures of enforcement and an evaluation of the application process. Scenario : You have been employed as a construction consultant to manage the refurbishment and part new build project of mixed use project on behalf of your client, a Property speculator. The Ground and 1 st floors are to be given over to office / retail space with the 2 nd floor given over to residential accommodation in the form of flats. Part of the refurbishment works include: Rewiring of electrical circuits, including new installations Addition of a number of bathrooms – both in the residential areas and commercial areas. Blocking up of a number of internal doorways and forming openings in structural walls. You have been asked by your client to produce a Building Regulation FULL PLANS submission for the removal of part of an internal structural wall to create a large open space in the ground floor, such that building regulations approval can be obtained. You will need to consider all related aspects to create a habitable, fully serviced and functional space, complying with the regulations. Consider: adding to existing electrical circuits, ensure fire separation and integrity between the Commercial GF and residential upper floors is maintained, add in a small kitchen area with cloakroom. Tasks; 1.Discuss the powers of local authority building control officers and approved inspectors. Evidence, in the form of a report, should include details of what each does and when each first appeared in the construction and built environment sector. Any differences between how the two work must also be included. (P7) 2. Produce a specimen Building Regulations application for the detailed property and scenario above (discussed in class), complete with associated documentation including drawings, utilising the documentation issued via . The appropriate forms must be completed and accompanied by relevant drawings, specifications, etc (P8) Note – access the forms via WCBC Building ControlWCBC Building Control 3. Explain the procedures used to enforce the Building Regulations. Evidence must include procedures for notifying the enforcement authority at certain stages of the building work and the role of the inspector in verifying compliance with the regulations. (M3) 4. Evaluate the specimen Building Regulations application together with all necessary documentation. Learners should suggest how the application and documentation could be improved (D2)

Authenticity; I certify that the work I have submitted for this assessment is entirely my own and that all other material has been properly referenced. Signature;………………………………………………………………………… name;………………… ……… Date;…………………………. Nb: If anything written or illustrated is not your own work you must provide footnotes to identify the reference source/s (book, website, handout etc.) you have used. Submit your illustrated written report through the reception window on or before the submission date, with this sheet at the front. Your work should be attached ‘behind’ this sheet, with the authenticity statement (at the bottom of this page) acknowledged by signature.