1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Design Advice Request #2 – 2/27/14 EA 13-224797 DAR Goat.

Slides:



Advertisements
Similar presentations
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Advertisements

The Rivage Site corner of Ridge, Kelly and Calumet at the Falls Bridge.
TRADITIONAL NEIGHBORHOOD DEVELOPMENT (TND) ARTICLE City of Columbus
Roosevelt Road Form-Based Zoning Berwyn City Council Committee of the Whole December 8, 2009.
Height Recommendations September 25, 2008 Zoning Commission Case No The District of Columbia Office of Planning’s Comprehensive Review of Zoning.
Zoning Ordinance Update Planning Commission February 25, 2015.
City of Waynesboro Entrance Corridor Design Guidelines.
Advisory Committee Meeting April 16, :30pm Downtown Livability Initiative.
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Converting Raw Land into Saleable Lots and Desirable Communities
City of North Richland Hills TOD Code Overview. Comments from November 20 Work Session Need to ensure the preservation of key historic assets in the Smithfield.
Land Use Study for the Community of Winchester May 21, 2012.
City Council 2642 Second Street Appeal of Landmarks Commission Approval of Certificate of Appropriateness 07CA-009 February 12, 2008.
Marissa Berardi and Brent Myers-Lawson
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
Shireen Abdelrahman Lecture 5. Individual development projects - new construction, expansion, or renovation - can affect the surrounding environment in.
Community Development Department Community Development Department Shoppes of Palm Coast Nonresidential Controlling Master Site Development – Tier 2 Application.
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
HUMPHREY STREET OVERLAY DISTRICT 2015 Proposed Zoning Bylaw Amendment Public Information Session.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) April 28, 2009 Board of County Commissioners PUBLIC HEARING.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
Westside Revised Draft Community Plan and Development Code.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Development in Austin. West Campus Redevelopment.
Integrating Uses.
South Lake Union Urban Design Framework Report to the Seattle Design Commission September 17, 2009.
Board of County Commissioners Second Public Hearing August 10, /10/
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments December 16, 2009 Department of Safety & Inspections / Department of Planning.
Design Standards in Saint Paul Proposed Design Standards Zoning Amendments October 16, 2009 Department of Safety & Inspections / Department of Planning.
SITE/PLOT PLANS APPLICATIONS OF TECHNOLOGY. DESIGNING A BUILDING ON A SITE Architects must consider the following about a site when designing a building.
Lowe’s Site Plan Application No. SP-MAJ Lot 3.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission EA DA Front 17.
Employment Re-designations Accommodating more jobs inside the UGB Planning Commission
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
4650 Alhambra Circle Building Site Separation. Request: The applicant is requesting consideration of a building site separation in accordance with Section.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZ Glisan Commons May 17, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
1 City of Portland City Council Public Hearing on an Appeal of the Land Use Hearings Officer’s Decision Presentation by BDS Staff: Mark Walhood, City Planner.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
Block 37 Zoning & Design Guideline Evaluation May 15, 2014.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
Board of County Commissioners PUBLIC HEARING Village Planned Development Code (Horizon West) June 2, 2009 Board of County Commissioners PUBLIC HEARING.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Staff Presentation to the Portland Design Commission June 2, 2016 DAR #1: April 14, 2016 CITY OF PORTLAND, OREGON Design Review Hearing EA DAR.
How Closely We Live With Each Other
Staff Presentation to the Portland Design Commission June 2, 2016 CITY OF PORTLAND, OREGON 1st Design Review Hearing DZM Block 20 Residential.
Community Input Meeting #4 July 8 & 9, Agenda City Staff & Project Team Why we are here Project overview Summary of previous community meetings.
1 City of Portland Bureau of Development Services Staff Presentation to the Adjustment Committee Land Use Review LU AD Adjustment.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Review Hearing LU DZM AD – Grant.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Type III Design Review LU DZ SW Yamhill,
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
South Waterfront Greenway Design Guidelines Portland Design Commission Briefing April 3, 2008.
253 South Los Robles Avenue Predevelopment Plan Review
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
83 North Lake Avenue Predevelopment Plan Review
Place Type: Community Center
City Council Meeting April 23, 2018
254 East Union Street Pre Development Plan Review
With funding from the Appalachian Regional Commission
Creating Streetscapes With Conventional Zoning
Article XIII – Form Districts Community Meeting
Article XIII – Form Districts Community Meeting
115-Unit Mixed-Use Project (711 E
Section 8: SIGNS.
Presentation transcript:

1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Design Advice Request #2 – 2/27/14 EA DAR Goat Blocks Redevelopment

2 Summary & Process Superblock redevelopment with multiple buildings, parking, large and small retailers, and housing; Overall site redevelopment includes approx. 84,000 sf of retail, 257 apartments, and significant auto parking. Type III Design Review will be required. Jan. 6, 2014 – First DAR Jan. 28, 2014 – First DAR notes out, revised drawings rec’d. Feb. 6, 2014 – Second DAR cancelled – snow day Feb. 27, 2014 – Second and final DAR ( plans evolved this month - DZ submittal early March – completeness/second DAR notes crossover )

3 Zoning Map EXd, Central City Plan District/Central Eastside Subdistrict 3:1 FAR (6:1 with housing bonus) 50’ maximum height 95’ if 120Ksf FAR bonus earned 125’ if additional criteria met ( E.4.a-f) Belmont: Required Building Line, Parking Access Restricted Max. Transit Setback: 100% on Belmont, 50% on 11th TSP Belmont: City Walkway, Major Transit Priority 11 th : City Walkway, Transit Access 10 th : Local Service Not a pedestrian district

4 CCPR, Superblock, Modifications, Guidelines CCPR likely required if over 60 non-residential Growth Parking spaces SUPERBLOCK regulations apply to large block. Min. 6,000sf total public walkway/plaza/landscaping (e.g. 30’ x 200’ public access easement), single plaza/atrium space of min. 1,840sf MODIFICATIONS (TBD – no full drawing set/plan check) , Required Building Line (75% building within 12’ of lot line) , Ground Floor Windows ( Active uses behind glass facing Belmont) C.1.d, Maximum Transit Street Setback (100% of building within 10’ of Belmont lot line, 50% on 11th) B, Height (Stairwells no more than 10’ above height limit) ADJUSTMENT F.6, Parking Access Restricted Street (Belmont access) SIGNS – TBD, possible Adjustments/Modifications Central City Fundamentals Central Eastside District Guidelines

5

6 DAR #1 Feedback Belmont Edge/Enclosure/Building Orientation Raised and/or hidden retail is problematic, especially when not visible from street. Grocery entries should be more accessible. Belmont edge needs to be stronger, more urban, pedestrian-focused. East-West Superblock – Yamhill ‘Alley’ More direct, accessible connections to sidewalk, greater width and more retail might help, enclosure and scale is important (need sections), internal walkways need to feel public and open. Other Driveway access onto Belmont is problematic, work with PBOT With any AD/Mod, signage should be special, integrated, high quality Overall Project exciting, general support for concept Maintain authenticity in concept, fertile connection to streetscape/neighborhood is critical (avoid elevated ‘big box’ center) Small-scale/incubator spaces should be accessible from street Baseline street condition at all edges should be excellent, beware of elevated retail Resolving program and architecture conflicts is the biggest issue, landscaping has a key role to play in making this project a success (bring landscape designer)

7 Design Changes since first DAR (1/22/14 drawings) Full 12’ public sidewalk along SE Belmont is now proposed (standard dedications, improvements) Large/grocery retail and small/west retail has been moved closer to Belmont Corner stairs at 10 th & Belmont revised ‘Alley’ in alignment with Yamhill has been re-designed with more retail frontage, regularity, and lowered grade with ramp-only (no stairs) from upper/11 th Avenue side, stadium-like seating added by stairs descending to 10 th Applicant has made changes since 1/221/4 submittal, to be presented today

8 Discussion Topic #1: Belmont Edge/Modifications Is revised massing concept along Belmont successful? Are additional moves/further refinement necessary to strengthen the Belmont frontage? Massing and footprint/stair changes? Is corner at 10 th & Belmont successful? Modifications may still be needed, all related to pedestrian/transit environment along Belmont (Ground Floor Windows, possibly Required Building Line and Maximum Transit Street Setback – TBD)

9 Discussion Topic #2: Yamhill ‘Alley’ and ‘Market Walk’ Have the changes made to this area successful in terms of grade, pedestrian/visual access, and activity/retail on the edges? Are the proportions, width, and sense of enclosure at these spaces successful? Further changes and refinements needed to grades, design, use locations abutting these walkways?

10 Discussion Topics #3 - 5: #3: Materials/Architecture Are conceptual elevations/materials moving in the right direction? Too much cement panel? Other design feedback for individual buildings/spaces helpful. #4: Ground Level/Pedestrianscape South building on main block has many blank walls/service areas at street level – may trigger Ground Floor Windows Modifications. Vegetated trellis screens need to work on their own without plants. Ground level wood panels and durability? Any major red flags on how the project meets street level? #5: Belmont Driveway AD Drawings still show a driveway onto Belmont. If PBOT supports based on use limitations, is this approvable? Other topics at Commissioner Discretion

11 Discussion Topics Summary Belmont Edge/Modifications Is the retail/building wall/stair orientation to Belmont successful? Revised corner stair/entry approvable? Is Belmont active and welcoming to pedestrians on both blocks? Yamhill ‘Alley’ and ‘Market Walk’ Have the changes made to the alley and the north-south ‘market walk’ been successful in terms of grade, pedestrian access and activity/retail? Are the proportions, width, and scale/enclosure of these spaces approvable? Materials/Architecture Didn’t get to this on first DAR, provide as much feedback as possible for the various buildings Ground Level/Pedestrianscape Extensive blank walls on south/hardware building on Taylor & 11 th. Vegetated trellis elements, overall pedestrian-level design feedback. Belmont Driveway AD Discuss revised proposal – will this driveway location work if PBOT accepts? Other topics at Commissioner Discretion

12 fin

13