Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company www.sscboring.com.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Basic Ground Penetrating Radar Theory
Bangor Water Districts Experience With Gas. Bangor Water Districts Experience With Natural Gas.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Introduction to Trenchless Methods
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
3-1 Utility Conflict Identification and Management Lesson 3.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Pilot Tube or Guide Boring Method for Pipe Ramming Guidance
Gwinnett County’s Post Development Stormwater Management Program
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
US 93 Improvements – Buchanan Boulevard to the Hoover Dam Interchange Transportation Category, Projects $10 Million to $20 Million 2012 APWA Project of.
COPYRIGHT © AREMA : 1 of 24 Module 17: Utility Occupations.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Prof. J.J Lew, P.E. Principal Investigator – Purdue Univ. James H. Anspach, P.G. Technical Advisor – So-Deep, Inc. C. Paul Scott, P.E. FHWA Advisor Kevin.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
TRENCHLESS TECHNOLOGY
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Control Selection Techniques Employed for D&D Projects with Emphasis on Nuclear Criticality Safety Controls Brenda L. Hawks Engineering Director Oak Ridge.
Upgrade 138kV Underground Circuit From Polk to Garrott Substations ERCOT RPG Meeting January 13,
TRENCHLESS TECHNOLOGY
Pasadena Water and Power Department INCREASE CONTRACT 20,013 WITH VCI TELCOM FOR CONSTRUCTION OF UNDERGROUND SYSTEM IN LOS ROBLES BY $300,000 August 9,
Eagle Mountain – Woodfibre Gas Pipeline Project Geotechnical and geophysical tests James Lota, FortisBC September 25, 2014.
ZAPDOR
Open Space Residential Development Bylaw Town of Rehoboth.
SUBSURFACE Marker Ball Installation and Information Retention at INL David Inskeep/Shawn Williams 2014 EFCOG/DOE Electrical Safety Workshop NREL- Golden,
Safety in the numbers Working Safely Around Pipelines Dig Safe BC! Workshop: March 2010.
MnDOT-ACEC/MN Annual Consultant Conference March 5, 2012 Leveraging SUE Data for Utilities on Projects Tom Swafford- Utility Mapping Services, Inc.
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
TRENCHLESS TECHNOLOGIES Submitted By:- Kamaldeep Gupta C-3.
Permit Process.
La Center, Washington: Balancing Pipelines and Populations 1.
The Role of Groundwater Sampling/Monitoring COGCC Proposed Rule 609 University of Colorado Law School Nov 26, 2012.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
Peabody Coal Lower Basin Pipeline Engineering Appraisal Study Bureau of Reclamation September 18, 2002.
WVSD SANITARY SEWER REHABILITATION PROGRAM 2006 Sewer Smart Summit Presented by Peter V. Sevcik, P.E. West Valley Sanitation District Campbell, California.
GIS and Urban Planning TransportationZoningUtilities Zoning is the process of categorizing land tracts according to their intended use. Common types of.
Pioneering MUD RECOVERY SYSTEM Successfully Controls “Frac Outs” for Horizontal Directional Drilling projects Ron Halderman, PE Director HDD Division Mears.
David Kerr, PE Lessons Learned from recent challenging HDD installation.
PROF. DR. FEVZİ YILMAZ Fatih Sultan Mehmet Vakıf University, Faculty of Engineering, İstanbul ICSG ISTANBUL 2015, APRIL.
Offshore Notification System www.GulfSafe.org.
ICORR Technologies, Inc.
Torino, March 1998 ANCIT WORKSHOP Telecom Italia experience with the use of NO-DIG techniques Renato Polidoro Giovanni Ciochetto.
Geometric Design: General Concept CE331 Transportation Engineering.
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
Maintenance and Temporary Traffic Control
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
Contractor Utility Coordination WisDOT Projects February 18 th, 2016.
J.PRATHYUSHAG.TEJASRI DEPARTMENT OF CIVIL ENGINEERING.
BY MOHANA.V CIVIL ENGINEERING FINAL YEAR - VII SEM.
Trenchless Pipeline Crossings
M.E. CONSTRUCTION ENG. & MANAGEMENT
TRENCHLESS TECHNOLOGY
INTRODUCTION TO TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY (TT) IN SMART CITIES
Costs and Economics of Construction
Draft Transportation Element September 6, 2017
A PRESENTATION ON “TRENCHLESS TECHNOLOGY” Presented by S.Mounika N.V.Prasad (132U5A0112) (122U1A0157) IIIyr-Civil IIIyr-Civil.
TRENCHLESS TECHNOLOGY
UKRAINE, KYIV REGION, BARYSHIVKA plant was put into operation in 2007
Construction Considerations
Drawing of Sufficient Detail (DOSD)
Stream Crossing Replacement Policy
Presentation transcript:

Horizontal Directional Drilling (HDD) Arvid Veidmark, III EVP, Senior Estimator Specialized Services Company

Celebrating 40 Years In Construction! SSC SSC was founded in 1969 by the Veidmark family. Current owners include Marcia Veidmark, Arvid III, Aaron, and Abe, who all share in the daily operation of the company. Over the years the business has adapted to specialize solely in trenchless technology and is currently recognized as a leading authority on Arizona’s underground. Watch Video

Celebrating 40 Years In Construction! HDD-A Trenchless Method  Born from the gas industry  First recorded river crossing in 1971 was 500-ft of 4-in pipe  Method sophistication has grown significantly  2008 at least seven crossing recorded with 42-in diameter in excess of 5,000-ft

Celebrating 40 Years In Construction! Record HDD 2009  May 2008 – Nov 2009  10 mile pipeline under harbor in VA.  7 HDD Crossings  One 3,003-ft water-to-water  One 7,357-ft under river  Total 15,439-ft on project  HDD only “permitable” option

Celebrating 40 Years In Construction! Expanding Market  Growth largely linked to expansion of natural gas infrastructure  Most projects related to right-of-way work, crossing, permitting or work in environmentally sensitive areas.  Mostly involves installation of 3-in pipe and up to bolster existing transportation infrastructure.  Can reduce construction time because of easier permitting approval

Celebrating 40 Years In Construction! Applications  Wide range of applications  Typical small installations – telecommunication service cable  Large installations - pipes up to 48-in  Used to install new pipes with minimal surface disruption

Celebrating 40 Years In Construction! HDD 4 - Stage Process  Planning Project requirements Function Diameter Depth Length Material to be installed  Pilot Hole Drilling-Pre-Reaming  Hole Enlargement  Pull Back

Celebrating 40 Years In Construction! Stage #1-Planning PlansSpecifications Geotech Report Establish Scope of work ScheduleDesignLocationDimension Product Furnished Product Installed Quality Control Cooperation

Celebrating 40 Years In Construction! Project Requirements Intended Function DiameterDepthLength Pipe material Bend radius Schedule Influence Choices Size of Equipment Pipe Material Drilling Methods Other Aspects

Celebrating 40 Years In Construction! Function pipe material choices diameter necessity of tight grade tolerances (e.g., gravity fed sewer) INFLUENCE

Celebrating 40 Years In Construction! Diameter Photos Courtesy of Vermeer 2009

Celebrating 40 Years In Construction! Diameter

Celebrating 40 Years In Construction! Depth ground conditions site features existing utilities constraints environmental concerns INFLUENCEDBY

Celebrating 40 Years In Construction! Subsurface Utility Engineering  Eliminates Risk Associated With: Redesign costs Higher construction bids Change orders Construction Claims Environmental damage Combines Traditional Practices… With New Technology

Celebrating 40 Years In Construction! Cost Benefits of S.U.E. According to Purdue University / Federal Highway Administration study completed in 2000  Reduced facility damage  Eliminated cost of redesign  Increased job safety  Reduced utility relocations  Lower project bids  Improved contractor productivity

Celebrating 40 Years In Construction! Stage #2-Pilot Hole Drilling  The pilot hole is drilled from the entry point following the profile and alignment previously designed.  Drilling equipment used is based on the results geotechnical investigations.  Drill path should have as fewest bends as possible  The drill head is tracked at the surface via a drill locater

Celebrating 40 Years In Construction! Stage #3 Pre-Reaming  Provides an annular space large enough for new pipeline  May include one or more stages (dependant on diameter/soil condition) Washover pipe Pre-reamer Pull-back pipe

Celebrating 40 Years In Construction! Stage #4 Pull Back  Pipeline should be preassembled  Consider drill’s exit angle  Consider duration of complete pull back (including welding & fusing)  Installation should be made with minimal stops Pull-back pipe Reamer Swivel joint Product pipe

Celebrating 40 Years In Construction! HDD Video

Celebrating 40 Years In Construction! HDD Case Study Superstition Freeway (US 60) Val Vista to Power Road 4” PVC for SRP electric conduit 4 directional bores and pull under ramps GC-FNF Construction Superstition Freeway (US 60) Val Vista to Power Road 4” PVC for SRP electric conduit 4 directional bores and pull under ramps GC-FNF Construction

Celebrating 40 Years In Construction!

Gila River – 16” Water main

Celebrating 40 Years In Construction! HDD/Auger Comparative Estimate PROJECT Gila River Indian Community -Department of Public Works Nelson Road and 1-10 Waterline Crossing Sacaton, Arizona REQUIREMENTS 16” C905 PVC Water Main 416 lineal feet Cross I-10 right-of-way ADOT 10’ + depth requirement Traffic limitations

Celebrating 40 Years In Construction! Location of Installation

Celebrating 40 Years In Construction! HDD/Auger Estimate Comparison HDDHDD Auger Bore Footage 600’ Conduit 24” # Conduits 1 Footage 600’ Conduit 24” # Conduits 1 Footage 400’ Casing 36’ x.500 Spacer Size 16”x 36” # Spacers 80 Footage 400’ Casing 36’ x.500 Spacer Size 16”x 36” # Spacers 80

Celebrating 40 Years In Construction! HDD Option Grade I-10 Eastbound I-10 Westbound 36” Casing

Celebrating 40 Years In Construction! Auger Option

Celebrating 40 Years In Construction! Labor and Materials HDDHDD Auger Bore 3 man crew = 30 days 3 man crew = 15 days Other Materials grout welding supply chip shore boxes Other Materials grout welding supply chip shore boxes Other Materials bore mud primer/glue permits traffic control Other Materials bore mud primer/glue permits traffic control

Celebrating 40 Years In Construction! Cost Comparison Labor and equipment per foot = $257 Material cost per foot =$ HDDHDD Auger Bore Labor and equipment per foot = $98 Material cost per foot =$117 $129,000 $190,000

Celebrating 40 Years In Construction! Questions?

Celebrating 40 Years In Construction! Discussion Arvid Veidmark, III SSC Consultant, Sr. Estimator