With Case Histories

2 AGENDA Pipe Ramming Drill Stem Recovery Pipe Removal / Bore Salvage
Case Study: EJM Pilot Tube Pipe Ram Pipe Ram Slick Bore Case Study: Slick Bore Case Study: Railroad Culvert Undercrossing Questions

3 Pipe Ramming PIPE RAMMING

4 STANDARD RAMMING Pipe Ramming 4-in through 147-in casings
BASICS STANDARD RAMMING 4-in through 147-in casings 118-in, 122-in, 138-in & 147-in casings Successfully Rammed Eliminates Slump or Rise Tools Configure to a Range of Casing Diameters

5 THE PROCESS: Typical Pipe Ramming Configuration

6 ROUTINE 12” Thru 36” CHALLENGING 36” Thru 80” ADVANCED 80” Thru 144”

7

8 DRILL STEM RECOVERY Pipe Ramming Rammer Fitted with Special Sleeve
TECHNIQUES DRILL STEM RECOVERY Rammer Fitted with Special Sleeve Drill Stem Welded to Back of Sleeve Percussion Frees Stuck Drill Stem Push Through or Pull Out

9 Drill Stem Retrieval

10 PIPE REMOVAL/ BORE SALVAGE
Pipe Ramming TECHNIQUES PIPE REMOVAL/ BORE SALVAGE Rammer Attached to Product Pipe Percussion Removes Pipe from Bore Salvage Job Bore Again

11 Product Pipe Removal/Bore Salvage-Job Site

12 CASE STUDY: EJM PILOT TUBE-PIPE RAM
Pipe Ramming CASE STUDY: EJM PILOT TUBE-PIPE RAM

13 GBM BACKGROUND Pipe Ramming On Grade & Alignment Installation
CASE STUDIES GBM BACKGROUND On Grade & Alignment Installation Highly Accurate Installations Theodolite Guidance System Video Monitoring of Illuminated Target Angled Steering Head Similar to HDD

14

15

16

17 GBM BACKGROUND Pipe Ramming
CASE STUDIES GBM BACKGROUND 1. Pilot Tubes Installed behind Steering Head 2. Auger Head Tube Sections Installed As Auger Sections Installed, Pilot Tube Sections Removed at Exit Pit Pipe Adapter Installed Product Casing Attached to Adapter 3. Thrust into Place

18 GBM BACKGROUND Pipe Ramming
CASE STUDIES GBM BACKGROUND Not All Soil Conditions or Pipe Diameters Favorable for total GBM Installation Pipe Ramming Assist After Pilot Tubes Installed on Line & Grade Special Ramming Adapters Rammer takes place of Auger Installation remains on Line & Grade

19

20

21 PROJECT BACKGROUND EJM Pipe Services- Lino Lakes, MN
Pipe Ramming CASE STUDIES PROJECT BACKGROUND EJM Pipe Services- Lino Lakes, MN Project Location: Chaska, MN Along the Minnesota River Spring Thaw Flood Stage River Levels

22 PROJECT BACKGROUND Pipe Ramming Sanitary Sewer Main
CASE STUDIES PROJECT BACKGROUND Sanitary Sewer Main 36-inch Diameter inside 54-inch Casing 160 feet in length New Development Under Concrete Creek Channel Creek runs through town Feeds into MN River

23 PROJECT BACKGROUND Grade Sensitive Project
Pipe Ramming CASE STUDIES PROJECT BACKGROUND Grade Sensitive Project Avoid slump & disturbance of concrete channel Unstable, saturated ground conditions Engineer utilized slump monitoring equip.

24

25

26

27

28 PROJECT SPECS Pipe Ramming Began @ 1% Downhill Grade 4-inch Pilot Tube
CASE STUDIES PROJECT SPECS 1% Downhill Grade 4-inch Pilot Tube

29

30

31

32

33

34

35

36 PROJECT SPECS Pipe Ramming Installed 4-inch to 24-inch Adapter
CASE STUDIES PROJECT SPECS Installed 4-inch to 24-inch Adapter Pushed into place

37

38

39

40

41 PROJECT SPECS Pipe Ramming Installed 24-inch to 54-inch Adapter
CASE STUDIES PROJECT SPECS Installed 24-inch to 54-inch Adapter Pushed into place

42

43 PROJECT SPECS Pipe Ramming Remove Auger
CASE STUDIES PROJECT SPECS Remove Auger Weld 54-inch by 20-ft casing to adapter Set up pipe rammer Cut out steel bulk head Loose material & water flow Sandbags & Underlayment fabric to lessen flow

44

45

46

47

48

49 PROJECT RESULTS Pipe Ramming 1st Section Installed without incident
CASE STUDIES PROJECT RESULTS 1st Section Installed without incident Next section added and rammed in place Subsequent casing sections rammed in place

50

51

52

53 PROJECT RESULTS Pipe Ramming 4- to 24-inch Adapter Removed
CASE STUDIES PROJECT RESULTS 4- to 24-inch Adapter Removed Final Casings installed to 160 feet

54

55

56 PROJECT RESULTS Pipe Ramming Casing installed on grade
CASE STUDIES PROJECT RESULTS Casing installed on grade 24-in to 54-in Adapter Removed Spoil removed with auger Ramming Times: Min/20-ft section

57

58

59

60 PROJECT RESULTS Pipe Ramming Slump Monitoring Results:
CASE STUDIES PROJECT RESULTS Slump Monitoring Results: Front of Launch Pit Levee Edge- 2 ½ inches Under Channel- ½ inch Receiving Pit Levee Edge- 1 ¼ inches All within tolerance Less slumping than anticipated

61 CASE STUDY REVIEW

62 PIPE RAM SLICK BORE Pipe Ramming Ram in Reusable Bore Pipe
TECHNIQUES PIPE RAM SLICK BORE Ram in Reusable Bore Pipe Clean Out Spoil Weld Product Pipe to Back End of Bore Pipe Remove Bore Pipe with Winching Device Pull in Product Pipe while Removing Bore Pipe Use Bore Pipe Again

63 Slick Bore Step #1

64 Slick Bore Step #2

65 Slick Bore Process Overview

66 CASE STUDY SLICK BORE

67 PROJECT BACKGROUND Pipe Ramming
CASE STUDIES PROJECT BACKGROUND MinnCan Pipeline project is a mile 24” crude oil pipeline From the Minnesota-Canada border to the Flint Hills Resources Refinery in Rosemount, MN Pipeline is owned by Natural Resources Group, Inc., Minnesota Pipeline Company, and Universal Ensco, Inc

68 PROJECT BACKGROUND Pipe Ramming Two Sections:
CASE STUDIES PROJECT BACKGROUND Two Sections: Northern mile section from the Canadian border to Clear brook, MN Southern mile section from Clearbrook, MN. to the refinery in Rosemount, MN Total of 303 road crossings and 19 horizontal directionally drilled crossings

69 PROJECT BACKGROUND Pipe Ramming MN Limited- Southern Section
CASE STUDIES PROJECT BACKGROUND MN Limited- Southern Section 156 road crossings

70 EQUIPMENT LIST Pipe Ramming Goliath Grundoram pipe rammer
CASE STUDIES EQUIPMENT LIST Goliath Grundoram pipe rammer BP 500 bentonite pump for lubrication 24” pipe ramming accessories Pig launcher and pipe pigs for clean out Reusable bore pipe

71 SLICK BORING Pipe Ramming The reusable bore pipe is rammed in place
CASE STUDIES SLICK BORING The reusable bore pipe is rammed in place Bentonite or polymers are used to lubricate the bore hole and the soil inside the bore pipe The soil is expelled from the bore pipe Line pipe will then be welded to the bore pipe

72 SLICK BORING Pipe Ramming Utilizing a sideboom tractor and winch
CASE STUDIES SLICK BORING Utilizing a sideboom tractor and winch The bore pipe is pulled out of the bore hole While the line pipe,welded to the bore pipe, is pulled into place

73 Pipe Ramming CASE STUDIES ON THE JOB Stearns County Road 23 northwest of Richmond, MN 95 ft. bore Bore pipe:115 ft. of in wall x 24-in diameter pipe 0.750” bentonite supply line welded to the pipe

74 Pipe Ramming CASE STUDIES ON THE JOB 115 ft. bore pipe was lifted into position with a sideboom & an excavator Rammer positioned and supported by an excavator Air compressor and bentonite pump are mounted to a semi-tractor trailer for mobility Positioned on the right-of-way at the edge of the open ditch next to the bore pit

75 Pipe Ramming CASE STUDIES ON THE JOB Typical bentonite or polymer application approx. 900 gallons for a 95 ft. bore Ramming times varied from 30 to 60 minutes per bore Three bores of 95 ft. length were completed the first week At the week two the crew had completed five bores of 95 to 100 ft. in length and one bore 240 ft. in length

76 Pipe Ramming CASE STUDIES ON THE JOB By the time they completed Phase 3 they were doing 8 bores per week in a six day work week

77

78

79

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105 Case Study: Railroad Culvert Undercrossing
Pipe Ramming Case Study: Railroad Culvert Undercrossing

106 ARB Failed Culvert Replacement 48- & 65-inch Culverts
Pipe Ramming CASE STUDIES ARB Union Pacific Railroad Culvert Failed Culvert Replacement 48- & 65-inch Culverts 24-inch Grundoram Taurus Access Emergency Ram NOTEABLE

107 LOCATION Pipe Ramming Feather River Canyon East-West Rail Corridor
CASE STUDIES LOCATION Feather River Canyon East-West Rail Corridor Northern Nevada & Northern California Sierra Nevada Mountains

108 BACKGROUND Pipe Ramming Early 2006- Significant Drainage Problems
CASE STUDIES BACKGROUND Early Significant Drainage Problems Runoff Culverts - Failed & Collapsed Emergency Crews 24 hr pumping Train traffic slowed 10 mph Relieve pressure on saturated soils

109 PROJECT SPECS Pipe Ramming Difficult Soil Conditions
CASE STUDIES PROJECT SPECS Difficult Soil Conditions Ramming ideal solution Difficult access Equipment brought in on rail cars Elevation 4,500-5,000 feet

110 PROJECT SPECS Pipe Ramming Install 48- & 65-inch culverts Pipe Ramming
CASE STUDIES PROJECT SPECS Install 48- & 65-inch culverts Pipe Ramming 24-inch diameter rammer ### lbs dynamic energy (2) 1,600 CFM Air Compressors

111 Arntzen Steel Rockford, Ill.

112 Arntzen Steel Rockford, Ill.

113 Arntzen Steel Rockford, Ill.

114 Arntzen Steel Rockford, Ill.

115 Arntzen Steel Rockford, Ill.

116 Arntzen Steel Rockford, Ill.

117 Arntzen Steel Rockford, Ill.

118 Arntzen Steel Rockford, Ill.

119 Arntzen Steel Rockford, Ill.

120 Arntzen Steel Rockford, Ill.

121 Arntzen Steel Rockford, Ill.

122 Arntzen Steel Rockford, Ill.

123 Arntzen Steel Rockford, Ill.

124 Arntzen Steel Rockford, Ill.

125 Arntzen Steel Rockford, Ill.

126 Pipe Ramming CASE STUDIES LESSONS Deteriorating infrastructure not limited to cities municipalities or utilities Deteriorating Rail Culverts pose serious threat Potential for major accident Problem needs immediate attention

127 Questions?