Presented By: FAA, ATO, Western Service Center Date: March 7, 2016 Federal Aviation Administration FAA Initiative to Address Noise Concerns of Santa Cruz/Santa.

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Module N° 4 – ICAO SSP framework
Presented to: COSCAP SA By: Aaron E. Wilkins III / Ajay Kumar Date: April 2011 FAAs Presence in South Asia An Overview of Technical Assistance Provided.
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
By: Nurhan Tan, NAS Planning & Integration Date: Sept. 16, 2009 Federal Aviation Administration ACA Association of California Airports Conference S. Lake.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
1 Comprehensive Management Plan for East Hampton Airport  Safety, Noise and Operations Peter J. Kirsch December 1, 2011.
WHAT AIRPORT MANAGERS NEED TO KNOW ABOUT TERPS Association of California Airports Lake Tahoe, California September 10, 2014 QED Airport & Aviation Consultants.
Federal Aviation Administration Wood River Region Replacement Airport EIS Who:City of Ketchum & City of Sun Valley Date: February 13, 2008.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
“Teaching the Science, Inspiring the Art, Producing Aviation Candidates!” Instrument Flying A Brief Overview Written for the Notre Dame Pilot Initiative.
Expanded Version of COSO a presentation by Steve Wadleigh Expanded Version of COSO a presentation by Steve Wadleigh Standards for Internal Control in the.
APAC PBN Seminar F.LECAT (ICAO)
PBN Airspace Concept Process
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
RST processes Session 6 Presentation 3. A framework for RST processes Establishing an RST Membership Terms of reference Work programme (schedule, agenda,
FAA ICAO ANNEX 6 PROPOSAL & OVERSIGHT ISSUES IN DISPATCH
Internal Auditing and Outsourcing
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Date of submission : 20 – 11 – Day of submission : Sunday. Grade : 11. Section : 51. Group names :  Maitha Ali.  Salha Salem.  Rafeea Ali. Physics.
Justice Information Network Strategic Plan Development Justice Information Network Board March 18, 2008 Mo West, JIN Program Manager.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
SUA Process Overview FAA JO
Basic Indoctrination Navigation 2 HOURS
Federal Aviation Administration ASPIRE Update APEC TPT-WG Aviation Emissions Taskforce Singapore 15/16 Sept 09.
Situational Awareness Numerous aircraft and operational displays, when combined with effective and efficient communications and facilities, provide Air.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Presented to: Verification and Validation Summit By: James Daum NextGen and Operations Planning Safety Manager AJP-1900 Date: November 05, 2009 Federal.
Federal Aviation Administration NextGen Environmental Management System (EMS)
NextGen Next Generation Air Transportation System
Airport Noise Compatibility Study Group Navigation Committee AIRPORT NOISE COMPATIBILITY PROGRAM Louisville and Jefferson County FINDINGS AND RECOMMENDATIONS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Complex Procedure Development Plan
LECTURE 4: ICAO CHART requirements
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
NY/NJ/PHL Metropolitan Area Airspace Redesign Project and Implementation Update Presentation to: Congressional Staffers By: Steve Kelley, Airspace Redesign.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Presented to: By: Date: Federal Aviation Administration Obstacles in the Visual Segment 20:1 Background, Policies and Action Gerard G Lebar Eastern Flight.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
APAC PBN Seminar F.LECAT (ICAO)
Air Traffic Organization
FAA NAVAID Rationalization / Resiliency Overview
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
PlaneWrong AGM Thursday 13th October
Continuous Climb Operations (CCO) Saulo Da Silva
Association of California Airports Instrument Flight Procedures
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
RST processes Session 5 Presentation 2.
Safety Risk Management (SRM) Process Overview
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Strategic Environmental Assessment (SEA)
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Aerodrome Certification Workshop
Presentation transcript:

Presented By: FAA, ATO, Western Service Center Date: March 7, 2016 Federal Aviation Administration FAA Initiative to Address Noise Concerns of Santa Cruz/Santa Clara/San Mateo/San Francisco Counties Feasibility Study Overview

Federal Aviation Administration Background Longstanding issues with, as well as changes to, the Northern California TRACON instrument approach and departure procedures have generated noise concerns from local residents of Santa Cruz, Santa Clara, San Mateo and San Francisco Counties. In meetings and correspondence with congressional offices and local community representatives, the Federal Aviation Administration (FAA) has received recommendations to adjust the current published procedures. In response, the FAA has undertaken a noise initiative to explore such modifications.

Federal Aviation Administration Project Scope At the request of Representatives Farr, Eshoo and Speier, the FAA, in collaboration with NATCA, will: –Analyze and determine feasibility of the proposed procedural and operational modifications included in the FAA Initiative to Address Noise Concerns of Santa Cruz/Santa Clara/San Mateo/San Francisco Counties.

Federal Aviation Administration What is a Feasibility Study? Analyzes different variables of potential sources of noise concerns. Focuses on the established criteria and fly-ability of new and/or modified flight procedures. Assesses of impacts to operations at the surrounding airports and traffic flows. Evaluates potential procedural modifications including: –Speed/altitude adjustments –Airspace changes –Moving existing waypoints –Operational safety

Federal Aviation Administration Initiative Reportable Milestones Detailed Analysis Fly-ability Assessment Operational Assessment Feasibility Determination

Federal Aviation Administration Detailed Analysis Different variables are evaluated in order to determine the most likely cause of noise concerns including: –IFR or VFR operation –Historical track data –Significant event (i.e. Super Bowl) –Time of day –Anomaly such as weather or aircraft emergency –Percentage of flights on a filed procedure –Average altitude or speed –Flight counts

Federal Aviation Administration Detailed Analysis Performance Data Analysis and Reporting System (PDARS) –Analytic software enables processing of complex and extremely large data sets as well as reliable extraction of relevant information, allowing users to focus on impacts of new/modified procedures, airspace changes operational issues or significant events. –PDARS is extremely versatile. It can analyze operations of a single flight, operations within one airspace volume, facility, airport, or larger airspace system. It can look at single days or multiple days, limited only by the available data.

Federal Aviation Administration What is a Feasibility Study? Fly-ability Assessment –Terminal Instrument Procedures (TERPS) Criteria The key considerations for developing Terminal Instrument Approach and Departure Procedures include but are not limited to: –Existing obstructions –Ground/satellite based equipment –Lighting –Aircraft category Specifies the minimum measure of obstacle clearance that is considered by the FAA to supply a satisfactory level of vertical protection from obstructions.

Federal Aviation Administration What is a Feasibility Study? Fly-ability Assessment –TERPS criteria established for the following Instrument Procedures: Precision Approach (PAR, ILS, MLS) Non-Precision Approach (VOR, TACAN, LNAV, NDB, ASR) Approach with Vertical Guidance (LDA, LPV, VNAV) Required Navigation Performance (RNP) Area Navigation (RNAV) Departure Procedures (DP) –TERPS evaluates rate of climb/descent and turns to ensure a stabilized approach/departure.

Federal Aviation Administration Fly-ability Assessment Terminal Area Route Generation Evaluation & Traffic Simulation Software (TARGETS) –Software that provides immediate fly-ability results or proposed or modified RNAV procedures. –Provides a “quick look” into notional information. –The traffic simulation capability of TARGETS can assist users in visualizing interactions between RNAV and conventional operations. –It is important to remember that while TARGETS provides valuable assistance in designing and evaluating procedures, it is only one part of a complex process. Procedural conception to implementation requires careful use of all applicable directives and collaboration among numerous interested parties.

Federal Aviation Administration Operational Assessment Air Traffic Control facilities evaluates potential impacts to: –Airspace complexity –Existing air traffic procedures –Traffic flows in/out airports –Current airspace structure –Radio communication –Radar and/or satellite coverage An evaluation of the impacts to operations at the surrounding airports and associated procedures will be completed.

Federal Aviation Administration Feasibility Determination FAA Air Traffic Services, in collaboration with NATCA, with the support of Mission Support Services will make the determination of the proposed modifications, within the NorCal Initiative, in the following manner: –Use data gathered during the: Detailed Analysis Fly-ability Assessment Operational Assessment –Hold a series of meetings to discuss data and evaluate proposed modifications.

Federal Aviation Administration Feasibility Determination If the procedural amendments are found unfeasible and operationally unacceptable: –A detailed description outlining the rational of the determination will be completed and provided to the Representatives.

Federal Aviation Administration Feasibility Determination If the procedural amendments are determined feasible and flyable, as well as operationally acceptable from a safety point of view: –The FAA will conduct the formal environmental and safety reviews, coordinate and seek feedback from existing and/or new community roundtables and members of affected industry before moving forward with the formal amendment process.

Federal Aviation Administration Next Steps: Reportable Milestones Stakeholder Feedback Environmental Review Safety Assessment

Federal Aviation Administration Stakeholder Feedback Aviation Industry Local Airport and Government Officials Community Outreach –San Francisco Roundtable –Oakland Airport/Community Noise Management Forum –Select Committee (currently being established)

Federal Aviation Administration Environmental Review In accordance with FAA Order F Environmental Impacts: Policies and Procedures: –Conduct environmental review according to FAA Orders, directives and policies to determine appropriate level of National Environmental Policy Act (NEPA) analysis Depending on amount and degree of change, further analysis may be needed –Example: Routing changes resulting in significant noise impacts or reportable noise increases Level of environmental review depends if anticipated impacts are significant –Categorical Exclusion (CATEX), Environmental Assessment (EA), Environmental Impact Statement (EIS)

Federal Aviation Administration Safety Assessment Safety Management System (SMS) –A formalized and proactive approach to system safety. –Directly supports the mission of the FAA which is “to provide the safest, most efficient aerospace system in the world.” –The Air Traffic Organization (ATO) SMS is an integrated collection of principles, policies, processes, procedures, and programs used to identify, analyze, assess, manage, and monitor safety risk in the provision of air traffic management and communication, navigation, and surveillance services.

Federal Aviation Administration Safety Assessment Safety Risk Management (SRM) –A formal safety and risk assessment process –SRM provides a means to: Identify potential hazards and analyze and assess safety risk in ATO operations and NAS equipment. Define mitigations to reduce risk to an acceptable level. Identify safety performance targets to use as a benchmark for the expected performance of mitigations. Create a plan that an organization can use to determine if expected risk levels are met and maintained.

Federal Aviation Administration Formal Amendment Process Procedural requests are made through the FAA Instrument Flight Procedure (IFP) Information Gateway –The requests are separated into two categories: Performance Based Navigation (PBN) Legacy IFP –This process can take up to two years depending on the priority level on the procedure. –Other factors include: charting, controller/pilot training

Federal Aviation Administration Questions?