Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Design-Build at CDOT Minnesota Design-Build Workshop November 30, 2000.
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Innovative Contracting
CMGC Contracting at UDOT Program, Projects & Lessons Learned
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Utah’s Use of CMGC & Project Delivery
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
January 14, 2015 Industry Briefing Construction Manager General Contractor CM/GC.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
New York State Department of Transportation
New York State Department of Transportation
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Welcome to presentation on Contract Management System ( Primavera Software Solutions) (EPPM & CMS)
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
The Importance of the Qualifications Based Selection (QBS) Process
New York State Department of Transportation
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Project Delivery Selection Approach Keith R. Molenaar, PhD CDOT CM/GC Workshop Denver, CO February 7, 2012.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
Mid-City Exposition Light Rail Transit Project Closed Session Presentation March 2, 2006 Exposition Metro Line Construction Authority.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
Best Value Public Works Procurement September 7, 2007.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Elk Run Interchange Design-Build Project S.P (TH 52) Elk Run Interchange Design-Build Project S.P (TH 52) PROJECT INFORMATIONAL MEETING.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
Construction Management At Risk Process
Utah K-12 Public School Construction Education and Training Wednesday, May 4, 2011 Utah Cultural Celebration Center, West Valley City, Utah.
Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
2011 Nevada Transportation Conference
2016 SAME Small Business Conference - Atlanta
Presented By: Sean Campion P.E. Assistant Division Chief,
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Light Rail Transit Project
Doing Business with Santa Clara Valley Transportation Authority (VTA)
Highways & Infrastructure Best Value Construction Procurement Presentation November, 2017.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Designers’ Manual Overview and Chapter Contents
January 14, 2015 Industry Briefing
PROJECT DELIVERY METHODS
PRE-PROPOSAL MEETING LOGAN WWTF
SP TH 169 Redefine Informational Meeting July 25, 2019
Presentation transcript:

Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation

Traditional Project Delivery  Design-Bid-Build (DBB)  Specified by Public Contract Code  Design must be complete  Awarded to the lowest responsible bidder

Two-Phase Contract  PRE-CONSTRUCTION  CONSTRUCTION Preconstruction Services Construction Services Price Agreement Construction Manager General Contractor Cost Estimating Cost Estimating Subcontracting Plan Subcontracting Plan Scheduling Scheduling Material Procurement Material Procurement Utility Coordination Utility Coordination Construction Phasing Construction Phasing Constructability Review Constructability Review Risk Analysis Risk Analysis Quantity Verification Quantity Verification Third Party Negotiation Third Party Negotiation What is CMGC?

CMGC Authority  Assembly Bill 2498 (Gordon)  Signed September 2012  Added Section 6700 et seq. to Public Contract Code  Authorizes up to 6 projects by Caltrans  Must be administered by Caltrans  5 projects greater than $10 million  Effective January 1, 2013  No sunset date

Projects Awarded Projects (Preconstruction Services)  Fre 99 – Freeway realignment for High Speed Rail$111 million  Mpa 140 – Ferguson Slide Restoration$ 52 million  SF/Ala 80 – SFOBB Foundation Removal$ 86 million  SD 5 – Improve I-5, Rail, and Transit $606 million  SBd 215 – Reconstruct Barton Road Interchange$ 79 million  SBd 58 – Convert to 4-lane Freeway$158 million Awarded Projects (Construction)  Mpa 140 – Ferguson Slide Restoration (portion)$ 16 million  SF/Ala 80 – SFOBB Foundation Removal (portion)$ 15 million  Fre 99 – Freeway realignment for High Speed Rail (portion) $ 27 million

CMGC Process

Request for Qualifications Project Team provides evaluation criteria and weights  Past Performance  Key Personnel Requirements  Project Understanding

Cost Estimates  Open Book: Transparency, seeing the full estimate detail in base estimate format  Cost Based or Production Based Estimating: Bottom up estimate  Incremental Cost Estimates: Cost estimates at key milestones, commonly termed Opinion of Probable Construction Cost (OPCC)  Independent Cost Estimate

CMGC “Bid” Process When design of project or portion is complete: Three estimates: 1.Engineer’s Estimate 2.Construction Manager’s Cost Estimate 3.Independent Cost Estimate (ICE) Two Possible Outcomes: 1.Caltrans gets fair price – Proceed with build 2.Caltrans doesn’t get fair price – Proceed to bid

Why Use CMGC?  Faster Delivery  Cost Certainty  Constructability  Better Partnering  Risk Mitigation  Innovation

DBBDBCMGC Contractor Risk Owner Risk Risk Risk Management

0-30% Key CMGC Benefits 30-60% 60-90%  Owner Benefits  Most  Least >90% Design Price influence Risk Mgmt. Innovation Price influence Risk Mgmt. Innovation Price influence Risk Mgmt. Innovation Price Risk Mgmt. I nnovation Benefits of CMGC Over Time

Useful Links Innovative Procurement Practices Report: rocurementPractices.pdf Alternative Procurement Guide: rocurementGuide.pdf NCHRP Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs 02.pdf

Useful Links CMGC Pilot Program website:

Questions?