AST3-NIR camera for the AST3-3 telescope for the Kunlun Infrared Sky Survey (KISS) Management and planning Julia Tims, Jon Lawrence 20 August 2015.

Slides:



Advertisements
Similar presentations
1 ECM/EDMS Project HSD, TRD, SRCA September 26, 2007.
Advertisements

Square Kilometre Array (SKA) Project PRE-CONSTRUCTION PHASE Briefing for Industry & Science Organisations Tuesday 14 th August Wellington.
VISTA: The Telescope challenge Systems Engineering the Solution?
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
VISTA as seen by the Prime Contractor Adrian Russell.
ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
September 24, 2005 Magellan F/15 Chopping Secondary 1 Magellan F/15 Chopping Secondary Magellan SAC Meeting Laird Close (Principle Investigator) Victor.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
Major Management & Systems Engineering Ideas for Reducing Costs Peter Wizinowich NGAO Team Meeting September 11-12, 2008.
Thoughts on Ground-based lensing measurements Chao-Lin Kuo Stanford/SLAC KIPAC.
Overview of the Schedule and Budget for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown.
LIEF Project Plan Jeremy Mould & Jon Lawrence. Agenda KISS Kickoff Meeting 12/3 0900JM/LWMeeting overview / Skype 0930Science requirements ETC 1000XYTelescope.
Export Control Presented by Research and Graduate Studies Elizabeth Peloso.
From Research Prototype to Production
Project Sponsor Project Manager Business Case # 06/23/2014 Major Projects Quarterly Review 1.
For Corporate and Regional Office sites Guidelines for Developing a Simplified Purchase Recommendation.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Project Life Cycle.
Limpopo - Health1 Report to the Select Committee on Finance on the Provincial Budgets and Expenditure Review 2001/ /08 and Conditional Grants and.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Oct 17, 2001SALT PFIS Preliminary Design Review1 PFIS/ IMPALAS Issues Outside Reviewer's Comments Post-PDR tasks Valuation Issues.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
MNRF Management and milestone achievements Chris Evans AAO.
3.1.1 Optics, Optical Corrector, Mechanical Systems M. Johns, C. Claver.
Information System Project Management Lecture three Chapter one
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Jerry Kim, SSL Mechanical.
For Corporate and Regional Office sites Guidelines for Developing a Simplified Purchase Recommendation.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Simplifying the Budget Process
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Oracle Services Procurement
Entrepreneurship Indicators Project Partnerships, Sponsors and Budget Tim Davis, OECD Statistics Directorate Entrepreneurship Indicators Project Partnerships,
CITY OF MONROE FISCAL YEAR BUDGET PRESENTATION EDWARD SELL, FINANCE DIRECTOR.
1 DEPARTMENT OF SCIENCE & TECHNOLOGY DEPARTMENT OF SCIENCE & TECHNOLOGY ONTENTS c c 1.Estimate of National Expenditure ‘Chapter’: Vote 18……………………………Tag.
COSMO Large Coronagraph Preliminary Design Review
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Extended Detector Cutoff Considerations WFIRST Project Office May
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Strategic Programs (MCESA REIL) Overall Status Scope Resources Schedule Risk Budget Project Name: Track A - POC G Business Unit /Agency: IT/MCESA Target.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
AST3-NIR camera for the AST3-3 telescope for the Kunlun Infrared Sky Survey (KISS) Progress Meeting Jon Lawrence 14 August 2015.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Large Synoptic Survey Telescope
Page Headline Project Management Cost & Schedule Review Rob Michnoff.
Jim Fast Pacific Northwest National Laboratory
Green Line Extension Project
In Information Management
Budget Budget Contingency/ Cost Risks Descope Options
Page Headline Splitters.
Management Breakout: MREFC Budget Summary Victor L
General Services Department (GSD) August 22, 2018
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Delta Water Supply Project
Specifications What should it cover Goods Services Warranty
NSS integrated installation plan workshop Introduction
White Flint North Entrance Feasibility Study
East Hall under construction
CalACES JPA Board of Directors Meeting February 22, 2018.
SOS SERVIS Phase 3 - Modernizing the NM Election System
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Project.
Presentation transcript:

AST3-NIR camera for the AST3-3 telescope for the Kunlun Infrared Sky Survey (KISS) Management and planning Julia Tims, Jon Lawrence 20 August 2015

Project Available Budget ARC underfunded by $346k AAO additional contribution of $350k from Department capital grant Uni Syd increase contribution by $20k TAMU contribution NOT contingent on work being conducted at TAMU Swinburne contribution potentially >$0 (though problematic - for discussion)

Project Budget Status NB: Budget estimate includes: Pumping Station for Dome A Option B Detector $ estimated Glass optics $ estimated Mech. BOM included Descope (to 1k x 1k) is likely required: USD (and GBP) exchange rate Enhanced complexity of optics (cold stop) Removal of Swinburne contribution ($175k) Uncertainties: Optics procurement (through NIAOT?) Cost of Selex (1 unit) and mosaic Detector mount plate

Expenditure to date No sign off on project plan Currently no contract Both issues need resolution asap

Schedule

Outside Scope

Risks - programmatic US export license for Dome A denied  move project to South Pole; Australian export license for Dome A denied  move project to South Pole; US export license for South Pole denied  re-evaluate; Australian export license for South Pole denied  re-evaluate; US export license for China denied  integration in Australia; Deployment (South Pole) not approved by US NSF  project delayed. No funds sourced to fill funding shortfall  de-scope to H1RG or H2RG engineering grade; Project estimate too low  de-scope to H1RG or H2RG engineering grade; Partners do not contribute full amount  de-scope to H1RG; SUT do not obtain funding for laboratory  camera AIT at AAO, SUT instrument scientist to travel to AAO for assembly; SUT instrument scientist position not filled  camera AIT at AAO using AAO personnel; SUT instrument scientist does not overlap with detector delivery  SUT to extend position; Detectors (long lead item) are delayed  project is delayed; Scope creep  de-scope to H1RG; Power module not funded  replace AST3-1 and AST3-2 or deploy to South Pole; Deployment (Dome A) not approved by PRIC  project delayed;

Risks - technical Vacuum hold time  design, analysis, and testing Detector damaged during travel  mount design, packaging (vibration isolation) design Optics misaligned during travel  mount design, packaging (vibration isolation) design Selex detector performance  comprehensive system tests and detailed specification Leach controller noise performance  comprehensive system tests and detailed specification Controller or acquisition unit thermal issues  design of enclosure