The role of the railway infrastructure in transport on the Baltic - Adriatic axis Maria Perkuszewska, Vienna, 17th of September 2014.

Slides:



Advertisements
Similar presentations
Regione Toscana Accessibility and logistics to the competitiveness of the Tuscan territory Enrico Becattini - Responsible of P.O. Integrated system to.
Advertisements

EESC HEARING Sustainable development of the EU Transport policy and TEN-T The practical example: PP17 Brussels 26 April 2011.
Transport RAIL Isabelle Vandoorne Brussels, 29 November 2012 TEN-T 2012 calls info day.
An accessible and attractive region: to improve internal and external transport links Aleksandrs Antonovs EU Funds Managing Authority in Latvia.
TEN-T R EVIEW AND “C ONNECTING E UROPE F ACILITY ” CPMR PROPOSALS LISBON 6 March 2012.
Mitja Kosec – Project Manager
Funding the Trans-European Transport Network with the Connecting Europe Facility - Opportunities for Czech Republic -
Transport Investing in Europe's Growth The Trans-European Transport Network and Connecting Europe Facility Lia Potec, Policy Officer European Commission,
7 May, 2015 Green corridors in Europe; a perspective from Holland Menno M. Menist, Managing director 17 March 2010, Malmö.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
YEKATERINBURG, 4 SEPTEMBER STATUS QUO - COOPERATION BETWEEN CCTT AND MÁV Ilona Dávid President – Director General MÁV, Hungarian State Railways.
The EU Rail Freight Corridors in the context of freight transport on the Europe-Asia landbridge Edyta Jaszczuk-Jezierska Member of the Management Board.
Logistics 10 February 2012, Brussels Transport The TEN-T core Mediterranean Corridor EU Core Net Cities Barcelona Congress 19 June 2013 Vicenç Pedret Cuscó.
The Process of Including Pan-European Corridor X (Xa) in the Rail Freight Corridor Network (in Line with Regulation 913/2010/EU)
Integration of Pan-European Corridor X to the Network of Rail Freight Corridors How to Convert Pan-European Corridor X into a Railway Axis of Prosperity.
Development of North Adriatic ports multimodal connections and their efficient integration into the Core Network Project: NAPA STUDIES Trans-European.
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
1 Transport sustainability and green corridors TransBaltic Project 1-2 February 2010, Gdańsk Prepared by: Urszula Kowalczyk, Marcin Burchacz Maritime Institute.
Trans-European Transport Network and the Connecting Europe Facility
TRACECA PROJECT EVALUATION. Mark the location of the project on the map with a plain, black line or dot. Constanta – Vama Veche Motorway section.
The Main Priorities of Lithuanian Transport Infrastructure Development for November , 2006.
1CER The Voice of European Railways High Speed Railway – a chance for Poland and Central Europe EU Regulatory Framework Warszawa, 16 November 2011 Libor.
Transport Sustainable Mobility and Integrated Planning in Urban Areas: Trade Union Dialogue with Local Authorities Day 2: 5th February 2013, SESSION 1:
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
1 Noise and rail What about Belgium ? Martine Serbruyns Federal Public Service Mobility and Transport Brussels - 28 april 2014.
Trans-European Transport Network (TEN-T) MINISTRY OF TRANSPORT, CONSTRUCTION AND MARITIME ECONOMY 1. TEN-T is a basic structure which shapes European transport.
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
EU Funding for TEN-T Infrastructure
1 Program of construction the high speed lines in Poland Warsaw, r.
Prague Integrated Transport (PID).  Prague - area 496 km 2 population 1.2 mil. distance of the city boundary from the centre is 10 km to the north, 18.
THE NEW TRANS-EUROPEAN TRANSPORT NETWORK A CORE NETWORK: BLUEPRINT FOR 2030.
Working Party on Rail Transport – 63rd session Geneva, 18 November 2009 EUROPEAN COMMISSION.
Transport Enhancing TEN-T funding Pawel Stelmaszczyk Special Envoy for European Mobility Network DG MOVE Warsaw, 18 December 2013.
STATE POLICY AND PERSPECTIVES FOR DEVELOPMENT OF THE RAILWAY INFRASTRUCTURE MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF.
Intermodal transport between Germany, Poland and the Czech Republic – Intelligent TEN-T planning Ing. Jindřich Kušnír Department of Railway and Combined.
Transport The new TEN-T guidelines Results of the legislative procedure Philippe Chantraine (MOVE B1), 24 June 2013.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Intermodal transport between Europe and Asia: opportunities and challenges of Latvia.
Transport ERTMS on the EU core network by 2015, 2020, 2030 strategic (pragmatic) approach UIC conference 2014 I. Vandoorne.
108 October 2013CER The Voice of European Railways Building the WBSA railway land bridge. Providing frameworks for a seamless transport from Far East to.
Financing of TEN-T projects via INEA
TRAN Meeting with National Parliaments Presentation by TEN-T Orient East Med Corridor Coordinator M. Grosch Brussels EP, 13 October :00 – 18:30.
Transport The new TEN-T guidelines High Level Meeting Danube Commission Cesare Bernabei Budapest, 9 October 2013.
28th November 2008, Brussels1 Railway Infrastructure Administration, state organization EFRTC General Assembly 28th November 2008Brussels, Belgium Infrastructure.
Hearing in the European Parliament,
JASPERS for CEF Stéphane OUAKI Head Of Unit
The National Strategy of Slovak Republic
EURAILSPEED MILANO 2005.
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
Chances for quick wins in the railway sector How to reach economic growth through full interoperable corridors? Karel VINCK, European ERTMS Coordinator.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
Conference organized by: Union for the Mediterranean High Level Conference on the financing of the future Trans-Mediterranean Transport Network (TMN-T)
The project is co-funded by the European Union, Instrument for Pre-Accession Assistance Project activities realisation: WP4 FB 16 – Faculty of transport.
Transport Integration of cross-border transport infrastructure TEN-T strategy on large cross- border cooperation projects Gudrun Schulze, Team leader,
Key factors in the transport policy to encourage better integration Sixty-Third Session of UNECE, Geneva, 30th March 2009 "Economic Integration in the.
Logistic cooperation of the Visegrad countries - Polish perspective Budapest, May 2014.
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
RIS & IWW TEN-T Calls 2012 Open Annual and Multi-annual Calls for Proposals Nadia Chellafa – Project Manager – Ten-T Executive Agency.
Jan ILÍK Ministry of Transport, CZ Shaping the future HSR concept for the Czech Republic and CEE.
Transport Results of 2014 CEF calls for proposals Stéphane Ouaki, Herald Ruijters, Bernadette Frederick CEF Coordination Committee – Transport, 10 July.
The EU Rail Freight Corridors - Present and Future
The SEESARI initiative – “From vision to action“
Feasibility study on infrastructural interventions in Port of Split
Development of the Intermodal Transport in Bulgaria
5th Regional TAF TSI Workshop SK, CZ, HU
POIiŚ „REPAIR WORK/BUILDING WORKS ON THE RAILWAY LINE NUMBER 1 ON THE SECTION CZĘSTOCHOWA ZAWIERCIE”. Bucharest
Chances for quick wins in the railway sector
Baltic-Adriatic Corridor
Hearing in the European Parliament Brussels, 13 October 2015
Poland on the crossroads of transcontinental transport routes in the middle of Europe MINISTRY OF TRANSPORT OF THE REPUBLIC OF POLAND Warsaw, June 2007.
Presentation transcript:

The role of the railway infrastructure in transport on the Baltic - Adriatic axis Maria Perkuszewska, Vienna, 17th of September 2014

2 PKP Polskie Linie Kolejowe S.A. is a company of the PKP Group and is responsible for maintenance of railway lines, railway traffic management, construction of timetables and management over railway properties. PKP PLK S.A.’s network includes: km of railway lines turnouts rail-road level crossings engineering structures buildings structures The most important data concerning PKP PLK S.A.’s network

3 The map of the Polish railway lines

4 Mission of PKP PLK S.A. creating the best conditions for the railway transport service in Poland providing the highest level of railway safety ensuring the reliability of services protecting the environment ensuring a high level of information about the traffic of passenger trains taking actions which lead the increase of the accessibility, attractiveness, and the reliability of rail transport. PKP PLK S.A. successfully combines a tradition with the latest technologies and solutions.

5 organization of rail traffic maintenance of railway lines in order to ensure safe transport publication of timetables traffic management of approximately 6,500 passenger and freight trains each day planning and realization of investments Main tasksInvestments Modernisation of railway lines is one of the most important tasks currently carried out by PKP PLK S.A.. Funds utilized for this purpose stem from several sources: Cohesion Fund, European Regional Development Fund, Connecting Europe Facility, national funds, own resources.

6 Agenda: Plans for the next financial perspective

7 time, capacity, competitiveness – plus finding the most effective and economic methods (investment projects) for solving them. Implementing EU transport policy objectives resulting from the White Paper and TEN-T policy through the creation of a coherent railway network which offers increased technical infrastructure parameters to operators Maximising the network effect using the assumed value of financial means decidated to the development of the railway infrastructure to 2023; assuring a technical condition of the infrastructure that will allow to achieve a substantial speed level on longer stretches and fulfilling the TSI and TEN-T requirements. Focusing on specified problems General objectives for the next perspective

8 Maximising the efficiency indicators of investments (costs versus the achieved effect, e.g. improving speed, increasing capacity, or shortening travel time). A balanced approach to the infrastructure dedicated to freight and passenger transportation on the basis of the TEN-T network updated within the revision of a new regulation. Increasing the parametres of freight routes through: a)raising trade speed as well as eliminating limitations and axle load restrictions; b)improving the generators of major freight transport: o the Upper Silesia area; o Eastern border (including investments in the broad-gauge); o Port stations (Gdańsk, Gdynia, Szczecin). Priorities for the next perspective

9 Goals related to the improvement of the Baltic – Adriatic Corridor accessibility

10 Main challenges adjusting infrastructure parameters to the TEN-T requirements; equipping railway lines of the Baltic – Adriatic Corridor with the ERTMS - level 1 or 2 (depending on local conditions). Eliminating bottlenecks improving railway access to ports in Gdynia, Gdańsk, Szczecin and Świnoujście, including capacity for container terminals; restoring the capacity for freight trains in Katowice’s railway node; improving the accessibility of border crossing in Zebrzydowice (CZ); increasing the capacity of Warsaw, Upper Silesia, Poznań, Wrocław railway node.

11

12 Main investments to improve access to Baltic-Adriatic Corridor infrastructure

13 investments completed and foreseen to be completed till 2015 investments planned for the period

14 improvement of the rail access to the sea port in Gdynia; infrastructure improvement of the rail access to the port in Gdańsk; improvement of the rail access to the sea ports in Szczecin and Świnoujście. Improvement of the rail access to Polish Baltic ports in Gdynia, Gdańsk, Szczecin and Świnoujście

15 Improvement of the rail access to the sea port in Gdynia Basic parameters (now)  length of section: 18 km, Basic problems:  insufficient railway track condition on some sections,  bad condition of engineering structures,  bottlenecks limiting capacity. Target:  axle load: 221 kN,  lines for freight traffic only. CEF, annex I, projects for Baltic – Adriatic corridor: Gdynia, Gdańsk: ports - port interconnections, (further) development of multimodal platforms (item 2). Projected application for CEF call: 2015 Gdynia

16 Infrastructure improvement of the rail access to the port in Gdańsk Basic parameters (now):  length of section: 19 km, Basic problems:  Insufficient railway track condition on some sections,  bad condition of engineering structures,  bottlenecks limiting capacity. Target:  better utilization of railway infrastructure in the port area,  axle load: 221 kN,  lines for freight traffic. CEF, annex I, projects for Baltic – Adriatic corridor: Gdynia, Gdańsk: ports - port interconnections, (further) development of multimodal platforms (item 2). Projected application for CEF call: 2015 Gdańsk

17 Improvement of the rail access to sea ports in Szczecin and Świnoujście Basic parameters (now):  length of section: 53 km. The most important problems:  insufficient railway track condition on some sections,  bad condition of engineering structures,  bottlenecks limiting capacity. Target:  better utilization of railway infrastructure possibilities on the port area,  axle load: 221 kN/axle,  lines for freight traffic only. CEF, annex I, projects for Baltic – Adriatic corridor: Świnoujście, Szczecin: port – port interconnections (item 5). Projected application for CEF call: 2015 Szczecin and Świnoujście

18 works on railway line C-E 65 section Chorzów Batory - Tarnowskie Góry - Karsznice - Inowrocław - Bydgoszcz – Maksymilianowo; works on railway line C-E 30 section Opole Groszowice - Jelcz - Wrocław Brochów Railway lines for freight traffic

19 Basic parameters (currently):  section length: 396 km,  max speed: km/h. Basic problems:  insufficient track condition on some sections,  local speed restrictions caused mainly by bad state of engineering structures,  bottlenecks restricting capacity. Target:  max speed: km/h for passenger, km/h for freight,  axle load: 221 kN,  lines basically for freight traffic. Aims / CEF criteria:  removing bottlenecks (increasing capacity)  increasing interoperability,  support for freight transport services. CEF, annex I, projects for Baltic – Adriatic corridor: Gdynia – Katowice: rail works (item 1) Projected application for CEF call: 2015 Works on railway line C-E 65 section Chorzów Batory - Tarnowskie Góry - Karsznice - Inowrocław - Bydgoszcz - Maksymilianowo

20 Basic parameters (currently):  section length: 82,38 km,  max speed: km/h. Basic problems:  insufficient track condition on some sections  local speed restrictions caused mainly by bad state of engineering structures,  bottlenecks,  signalling devices requiring reconstruction. Target:  max speed 120 km/h for passenger, 70 km/h for freight,  axle load: 221 kN,  lines basically for freight traffic. Aims/ CEF criteria:  removing bottlenecks (increasing capacity)  increasing interoperability,  support for freight transport services. Projected application for CEF call: 2016 Works on railway line C-E 30 section Opole Groszowice - Jelcz - Wrocław Brochów

21 works on main passenger routes (E 30 and E 65) in Silesian area, stage I: line E 65 on section Będzin - Katowice - Tychy - Czechowice Dziedzice - Zebrzydowice, along with ERTMS implementation on section to Zawiercie; works on railway lines E 30 on section Kędzierzyn Koźle - Opole Zachodnie; works on railway line E-59 section Kędzierzyn Koźle - Chałupki (state border). Railway lines for mixed (passengers and freight) traffic

22 Basic parameters (currently):  section length: 128 km,  max speed: 50 – 100 km/h. Basic problems:  continuation of works,  insufficient track condition on some sections,  local speed restrictions caused mainly by bad state of engineering structures,  lack of adjustment of station for PRM,  bottlenecks restricting capacity. Target:  max speed: 160 km/h for passenger, 120 km/h for freight,  axle load: 221 kN. Aims / CEF criteria:  removing bottlenecks (increasing capacity)  increasing interoperability,  support for freight transport services. CEF, annex I, projects for Baltic – Adriatic corridor: Gdynia – Katowice: rail works (item 1) Projected application for CEF call: 2016 Works on railway line C-E 65 section Bydgoszcz - Tczew

23 Basic parameters (currently):  section length: 122 km,  max speed: km/h (with numerous local restrictions),  limits for axle load 196 kN. Basic problems:  insufficient track condition on some sections,  local speed restrictions caused mainly by bad state of engineering structures,  lack of adjustment of station for PRM,  numerous capacity restrictions. Target:  max speed: 160 km/h for passenger, 120 km/h for freight, axle load: 221 kN. Aims / CEF criteria:  removing bottlenecks Katowice Railway Node (also separation of agglomeration traffic – construction of additional tracks),  increasing interoperability,  support for freight transport services. CEF, annex I, projects for Baltic – Adriatic corridor: Katowice - Ostrava - Brno - Wien & Katowice - Žilina - Bratislava – Wien: rail works, in particular cross-border sections PL-CZ (item 7) Projected application for CEF call: 2015 Works on main passenger routes (E 30 and E 65) in Silesian area, stage I: line E 65 on section Będzin - Katowice - Tychy - Czechowice Dziedzice - Zebrzydowice, along with ERTMS implementation on section to Zawiercie

24 Basic parameters (currently):  section length: 43 km,  max speed: 60 – 100 km/h. Basic problems:  insufficient track condition on some sections,  speed restrictions. Target:  max speed: 120 km/h for passenger, 120 km/h for freight,  axle load: 221 kN. Aims / CEF criteria:  removing bottlenecks  increasing interoperability. Projected application for CEF call: 2016 Works on railway line E 30 section Kędzierzyn Koźle - Opole Zachodnie

25 Basic parameters (currently):  length of section: 54 km,  maximal speed: 50 – 100 km/h.  axle load limits up to 221 kN. Basic problems:  Insufficient railway surface structure on some sections,  local speed limits as a result of the bad condition of engineering structures,  bottlenecks,  signalling devices requiring reconstruction. Target:  max speed: 120 km/h for passenger, 70 km/h for freight,  axle load: 221 kN. Aims/ CEF criteria:  removal of bottlenecks (capacity increase),  increase of interoperability,  support for freight transport services. CEF, annex I, projects for Baltic – Adriatic corridor: Katowice - Ostrava - Brno - Wien & Katowice - Žilina - Bratislava – Wien: rail works, in particular cross-border sections PL-CZ (item 7) Projected application for CEF call: 2015 Works on railway line no. E-59 on section between Kędzierzyn Koźle - Chałupki (state border line)

26 Basic parameters (currently):  section length: 198 km,  max speed: 70 – 120 km/h. Basic problems:  insufficient track condition on some sections,  local speed restrictions caused mainly by bad state of engineering structures,  lack of adjustment of station for PRM,  capacity restrictions. Target:  max speed: km/h for passenger, 120 km/h for freight  axle load: 221 kN. Aims/ CEF criteria:  removing bottlenecks (increasing capacity ),  increasing interoperability,  support for freight transport services. CEF, annex I, projects for Baltic – Adriatic corridor: Wroclaw – Poznań – Szczecin/Świnoujście: rail works (item 4) Projected application for CEF call: 2014 Works on line E 59 on section Poznań Główny- Szczecin Dąbie

27 Rail Freight Corridors in Poland

Baltic-Adriatic Rail Freight Corridor 5 Świnoujście/Gdynia- Katowice- Ostrava /Žilina- Bratislava /Vienna/ Klagenfurt- Udine- Venice/ Trieste/ /Bologna/Ravenna/ Graz-Maribor- Ljubljana-Koper/Trieste Member States involved: PL, CZ, SK, AT, IT, SI 28 North Sea-Baltic Rail Freight Corridor 8 Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas Member States involved: BE, NL, DE, PL, LT both corridors have to be established in November 2015, both corridors are more or less at the same stage of implementation (management structures have been set up), corridors connects Poland from east to west (RFC 8) and north to south (RFC 5) and are crossed approximately in the center of Poland. Two railway corridors in Poland

In a view of the latest changes of Regulation establishing the Connecting Europe Facility the routes of RFC 5 and 8 were extended. New routes shall be included in the respective corridors at the latest 5 years after the date of establishment of corridors. Both corridors - 5 and 8 - shall be established in 2015, so new routes shall be included till 2018 or New positions on the routes are marked in bold: 29 Baltic-Adriatic Rail Freight Corridor 5 Świnoujście*/Gdynia-Katowice-Ostrava/Žilina-Bratislava/Vienna/ Klagenfurt-Udine-Venezia/Trieste/Bologna/Ravenna/Graz-Maribor- Ljubljana-Koper/Trieste Extension with * will be put in operation already on 2015! (according to decision of the Executive Board of RFC 5). Latest changes in corridors routes

30 North Sea-Baltic Rail Freight Corridor 8 Wilhelmshaven* / Bremerhaven / Hamburg* / Amsterdam* / Rotterdam / Antwerp/ Aachen / Berlin - Warsaw -Terespol (Poland-Belarus border)/Kaunas-Riga*-Tallin* New member states involved: DE, NL, BE, PL, LT, LV, EE Riga, Tallin – Extension on 2020 (Regulation (EU) No 1316/2013); Letter of Intent, which was written, negotiated and signed by all MOT’s and for which we got a positive feedback from European Commision assume following: o Ambition to realize the extensions to the Ports of Wilhelmshaven, Hamburg, Amsterdam by November 2015; o Extension to Central Bohemia/Prague by November 2015; o Extension to Katowice (Silesian node) by November 2015; o Extension to Medyka (Poland-Ukraine border) by November Latest changes in corridors routes

31 Corridor website: (under construction)

32 Preliminary route of RFC 5 (map) PKP PLK S.A. SŽDC, s. o. ŽSR ŐBB-Infrastruktur AG RFI S.p.A. SŽ-Infrastruktura AŽP Companies involved in Management Board of RFC 5

33 Thank you for your attention!