Potential and Investment Challenges in Wind Energy in India Narasimhan Santhanam EAI – www.eai.in.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Ministry of New & Renewable Energy B- 14, CGO Complex, Lodhi Road New Delhi Biomass Power in India – An Overview by VK JAIN Director & NPC Ministry.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Wind Energy – H.R Scenario KIIT University 27 th Nov 2013 KIIT University 27 th Nov
Challenge of Large Scale Wind Power Integration - Introduction to the Workshop Pradeep Perera Principal Energy Specialist Asian Development Bank.
REC Mechanism: Opportunity for Investment in Wind Power Dr. Govind Bhagwatikar Siemens Limited: Wind Power Renewable Energy 2012 Wind Conference Pune,
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
An Overview of Our Regulatory Proposal
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Electricity Reforms in Bangladesh
POWER SECTOR POLICY OVERVIEW ASSOCIATION FOR POWER UTILITIES OF AFRICA (APUA) SCIENTIFIC COMMITTEE CONFERENCE Presentation by Mr. M. Mulasikwanda Department.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
Options for Renewable/ Captive/ IPPs etc. EXTRACTS FROM ELECTRICITY ACT 2003 Para 3(1) NATIONAL ELECTRICITY POLICY AND PLAN: The Central Government shall,
WIND POWER DEVELOPMENT PROGRAMME – STATUS & ISSUES Ministry of New & Renewable Energy Government of India New Delhi 1.
GE Energy Financial Services Policy Options Shaping Private Investments in Clean Tech Kevin Walsh Managing Director, Power & Renewables May 1, 2009.
Energy Storage Need & Relevance under Climate Change mitigation efforts for India 1 1 Rajsekhar Budhavarapu (Head – Wind Business & CTO- Renewable Investments)
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
RENEWABLE ENERY & BIOMASS COGENERATION TRAINING – KENYA BY LEWIS B. MHANGO.
14 th Sustainable Energy Summit New Delhi : 25 th Nov., 2014 Sanjeev Gupta, Managing Director Financing Indian Solar Aspirations NEXGEN Financial Solutions.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
The World Bank Group Ashish Khanna India Energy Team Leader South Asia Sustainable Development.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Sanjay Garg General Manager PGCIL/ Ministry of Power
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Keeping the door open for a two-degree world (Climate, Renewables and Coal) Philippe Benoit Head of Environment and Energy Efficiency Division International.
Energy Conclave 2006 Presentation by Debashish Majumdar, Managing Director Indian Renewable Energy Development Agency Limited New Delhi July 27, 2006 Implementing.
Republic of Kenya 1 ST DBA- AFRICA MANAGEMENT REVIEW INTERNATIONAL CONFERENCE RESEARCH AND INNOVATION FOR SOCIO-ECONOMIC DEVELOPMENT IN AFRICA Eng.
Power Trading The Indian electricity sector has grown manifold since independence making India the third largest producer of electricity in Asia. The installed.
Presentation to Select Committee on Economic Development
RENEWABLE ENERGY POTENTIAL IN INDIA
Philippine Feed-In Tariff System Implementation 1.
1 Per capita Energy Consumption National Energy Policy Declaration 1. Providing Basic Energy Needs 2. Ensuring Energy Security 3. Promoting Energy.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Where India Stands - Energy Demand (mtoe) India is the Fourth Largest Energy Consumer Source:BP Stat 2010 Low per capita energy consumption (toe)
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
Potential and Investment Challenges in Small Hydro in India N arasimhan Santhanam EAI –
Energy Alternatives India - EAI Catalyzing Clean Technology in India.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Renewables Readiness Assessment -Background Jensen Shuma IRENA - local consultant Dar es Salaam, 9 March 2016.
Biomass Power Generation : Recent Trends in Technology and Future Possibilities Narasimhan Santhanam Energy Alternatives India,
Renewable Energy in India Sumant Sinha, Chairman & CEO, ReNew Power Ventures Pvt. Ltd. October 2012.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
Solar ROOFTOP- Challenges & INNOVATIONS TO ACHIEVE 40 GW
Egypt’s Electricity Subsidy Removal and the Unified Electricity Law; Paving the Way for Renewables SME Growth.
Narasimhan Santhanam EAI,
Overview on Renewable energy in Bulgaria
Challenges in Financing Renewable Energy
Second Generation Biofuels in India – Relevance and Status
NS4960 Spring Term, 2018 China: Expanded Renewables
Convergence of EVs, Battery Storage
Renewable Energy Project Investments
March, 30 – April 3, 2009, Honolulu, Hawaii
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Detail | Customise | Optimise
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Presentation transcript:

Potential and Investment Challenges in Wind Energy in India Narasimhan Santhanam EAI –

About EAI Leading Indian renewable energy business intelligence, market strategy consulting firm Work on all primary renewable energy sectors – solar, wind, bio-fuels / biomass, waste-to-energy and small hydro Work on market research, entry and diversification strategy, economic and financial modeling and pre- feasibility analysis Team comprises professionals from IITs and IIMs, with renewable energy, industry research and economics backgrounds Based out of Chennai, India More at

Will be Speaking On…  Wind Energy in India – Intro and Potential  Investment Trends in Wind Energy in India  Costs  Tariffs and RoI  Key Challenges  Looking Ahead  Take-aways for Investors

Wind Energy in India – Intro and Potential  Installed capacity = 11,000 MW, approx – TN = 4 2% – Mah = 20% – Guj = 15% – Kar = 13%  While accounting for 6% of the total installed power capacity in the country - only contributes 1.6 % of electricity generated

Wind Energy in India – Intro and Potential India has set a target of adding 10,500 MW of wind capacity during the 11th Five-Year Plan period ( ) YearMW Added

National Wind Power Programme The Wind Power Programme in India was initiated towards the end of the Sixth Plan, in 1983 – 84. The programme aims at survey and assessment of wind resources, setting up demonstration projects, and provision of incentives to make wind electricity competitive. As a result, wind electricity has emerged as an option for grid-quality power generation. The costs in respect of wind monitoring stations are shared between the Ministry of Non-Conventional Energy Sources (MNES) and the state nodal agencies in the ratio of 80:20 (90:10 for north-eastern states). With 2980 MW of installed wind power capacity, India now ranks fifth in the world after Germany, USA, Spain, and Denmark. Most of the capacity addition has been achieved through commercial projects by private investors.

Investment Trends in Wind Energy in India  Investments in wind energy  $2.2 billion  $2.7 billion (6 3 % of total RE investments)  2009 – Over $ 3 billion (EAI estimate)  Individual investment sizes – So far, wind farms have been of sizes up to 50 MW, but larger sized wind independent power projects expected.

Costs – Capital Costs Capex: Rs 5.25 crores per MW – Turbine – 70% – Civil Works – 11% – Electrical Infra – 9% – Power conditioning & grid integration – 7% – Installation - 2% – Others: 2%

Costs – Operating Costs  O & M costs - Approximately Rs per kWh (including insurance, for the first five years)  Increases with time, approx 5% escalation every year after first three years

Tariffs Feed-in-Tariff Rates (Rs/kWh) TenureOther ConditionsRPO (%) Maharash tra Escalation of 15 paise per year 6% Rajasthan / 4.520NA7.5% Madhya Pradesh Depreciation of 17 paise for 3 years, 16 paise in the 4 th year. Constant rate of Rs 3.36/unit thereafter 10% Gujarat No escalation2% (10% proposed) Karnataka3. 710No escalationMin 7.5% Andhra Pradesh 3.510No escalation5% Tamilnadu No escalation12-13% Kerala No escalation2%

Other Incentives  GoI has started giving a generation based incentive (GBI) of 50 paise per unit, in lieu of depreciation benefits  CDM revenues possible – 50 paise per unit

IRR and Payback  Project IRR: 16.5%  Equity IRR: 25%  Payback period: 6 years Above data calculated for the case where accelerated depreciation benefits are CDM benefits are factored in.

Total wind energy potential (best case) = 90 GW Installed capacity = 11 GW Installed capacity to total = 12.2% Potential vs. Actual Installed capacity - % to total electricity capacity – 6% Electricity generation - % to total – 1.5%

Key Challenges  Incentive Challenges  Transmission Challenges  Regulatory Challenges  Structural Challenges  Efficiency Challenges

Key Challenges Incentive Challenges  Profitability still dependent on government incentives / tariffs  Accelerated depreciation benefit is not conducive for long-term growth (already has been given an option for a generation based incentive (GBI) scheme)

Key Challenges Transmission Challenges Poor Grid Infrastructure  Lack of transmission infrastructure - transmission infrastructure that is required to effectively absorb an RE with intermittency doesn't exist.  In , around 15% of wind generated in Tamil Nadu was lost because of congestion and a shortage of evacuation facilities.

Key Challenges Transmission Challenges Poor Grid Infrastructure  Transmission infrastructure is the responsibility of state transmission utilities (STU). But many STU s are not financially healthy enough to invest in required transmission upgrades.  Payment for transmission augmentation upstream of an interconnection point is a contentious issue.  Resolving this requires state and central government entities, STU s, power plant developers and power purchasers.

Key Challenges Transmission Challenges Grid Integration  Grid codes that include standards for wind integration are required to ensure that variable electricity production from wind farms do not adversely affect the power system operation.  There is a lack of grid codes that incorporate the behavior of renewable generation., not just for wind alone.  The existing grid codes need to be modified to provide standards for system stability and reliability.

Key Challenges Transmission Challenges Obstacles to an Efficient Grid  Who – who should pay for the evacuation facility (transmission capacity) up to the interconnection point: developer, power purchaser, transmission utility or distribution company?  What - what is the role of State Transmission Utility (STU) in developing transmission infrastructure for renewable energy projects?  How -So far, no renewable related standards are available in Central Electricity Authority (CEA) Regulations. How should the connection standards and Grid Code be modified to accommodate wind energy sources?

Key Challenges Regulatory Challenges Restrictive Regulations  Regulations across SERCs regarding renewable generation grid connections and transmission charges are not yet uniform and are sometimes vague.  Costs for wheeling electricity are higher than those assumed by MNRE. Lowering and standardisation required.  Hurdles to open access hinders inter-state power sale.

Key Challenges Structural Challenges  Task of promoting renewable energy is in the hands of states. Only 10 states have implemented quotas for a renewable energy share of up to 10 per cent.  Wind energy does not enjoy infrastructure sector status such as roads, power or ports projects do. Therefore, banks have been reluctant to go in for non-recourse funding for wind power projects.  Till recently, investments in the wind power sector in the country have been mostly for captive purposes. (Shift towards IPPs because of higher tariffs, RPOs and long-term PPAs)

Key Challenges Efficiency Challenges  Estimation of effective turbine capacity not deterministic. (The turbine manufacturers are not willing to give a guarantee)  Forecasting of wind for short and medium term

Key Challenges Others  Site allocation process sometimes arbitrary.  Without storage, scalability might be hindered. And use of batteries for storage could increase costs by over100 %

Looking Ahead  Transmission infrastructure enhancements greatly needed  More proactive cooperation between STUs, Developers and Regulators, and more flexible distribution rules  Shift incentive focus to encourage long term investments (from AD to GBI)  Short term forecasting for the day ahead and hour ahead power system operation and dispatch is critical for any market for reliable power supply and to minimise the cost of power supply.  Encouraging RPS and effective implementation of RPO

Take- aways for Investors  Wind is a mature industry  A number of incentives have been provided, and more in pipeline; recent budget has been generous  Technology improvements and innovations could further increase efficiency and profitability  Key challenges present in dependence on incentives, transmission, regulatory, structural, and efficiency.  These challenges cannot be solved by private entities alone; Private-public initiatives are required to overcome challenges

Thanks ! Narasimhan Santhanam Energy Alternatives India - EAI – Mob: