MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)

Slides:



Advertisements
Similar presentations
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Advertisements

June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
MICE Project Board Alain Blondel 1 MICE running Preamble ISIS running Step I Step(s) IV Step V (and VI)
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
CMPB Alain Blondel 14 April STATUS OF MICE.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
MICE FAC meeting MICE spokesperson report.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
(one of the) Request from MPB
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Completing the Step IV Programme
Transnational Access to the MICE facility
Presentation transcript:

MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)

MICE activities by University of Geneva 1.DAQ/trigger responsibility -- Edda Gschwendtner ( ) Jean-Sebastien Graulich ( /2011) « JSG » Yordan Karadhzov (03/ ) -- students: Vassil Verguilov (2006-now) -- MICE DAQ (and VW Golf 1800 GLI 7313 TZ 01 aka ‘the shed’ or ‘the whale’) transported in summer 2007 to RAL 2. JSG was « online coordinator » since summer (now Linda Coney) 3. also contributed to TOF 4. now EMR construction and tests in collaboration with Como/Trieste (see presentation by Davide) 5. Field mapping (with CERN) 6. Also MICE spokesperson (lots of travel, committees, boards, meetings)

MICE Operations Manager Experienced physicist resident at RAL On call 24/24 Daily duties (tour), weekly duties (MICE hall and MICO meetings) Prepares running requests and paperwork for running the experiment Coordination of activities in the experiment on daily basis Especially important when data taking! -- authority on safety by delegation of Project Manager (Andy Nichols) -- delegation of physics objectives of experiment from Spokesperson (ABlondel) 1 Month at a time 2009: Graulich (UNIGE), Tsenov (Sofia), Cecchet (Pavia)  3 Months 2010: Graulich (UNIGE), Tsenov (Sofia)  2 Months 2011: Blondel (Unige), Vankova (Sofia), Cecchet (Pavia), Karadhzov (UNIGE)  4 Months  25% of MOM time from TNA-supported physicists!

THANKS to all MOMs

6

JSG

DAQ / online responsibility (JSG) until June Week / month at RAL 2.Organization of MICE control room and 3.implementation of MICE DAQ system 4.Organization of Controls and monitoring and relationship with DAQ 5.Organized review of MICE DAQ and controls 6.Made bid for funding of MICE online farm and installation at RAL  online data reconstruction Yordan has taken over DAQ/trigger part, Linda Coney the online groupe coordination

 MICE trigger, scalers, gates pulsers, etc… MICE DAQ

CM26 March 2010 Jean-Sebastien GraulichSlide 12

MICE data taking 5 ISIS user runs per year typically -- one week of run up+ machine physics 50/64 ~ 1Hz days of ‘user run’ 50 Hz -- Few days of Machine physics One long shut down (8 months) every ~4 years. Last one in second half of Next one in second half of Data taking periods important to MICE: : first beams; no decay solenoid; started with GVA counters, then CKOV/TOF/KL : no decay solenoid until october -- a few runs with decay solenoid in the fall 2009, first TOF calibration -- repairs to decay solenoid until may main step I run in July 2010, first measurements of emittance.

 MICE SCHEDULE update October 2011 STEP I STEP IV Q and 2013 STEP V STEP VI Run date: Completed EMR run Q Under construction:

15 How MICE Measures  in Step 1 (t0,x0,y0) (t1,x1,y1 ) TOF0 TOF1 Use TOF0 and TOF1 to determine phase space parameters of the muon beam Tof m 10 x 4cm scintillator  x,y = 1.15 cm  t = 50 ps Tof m 7 x 6cm bars  x,y = 1.73 cm  t = 50 ps Momentum-dependent matrix relates (t0,x0,y0,t1,x1,y1)  (t1,p,x1,x’1,y1,y’1) solved by iteration

16 Emittance Measurement Result: Data vs MC Reconstructed transverse phase space of the baseline MICE beam  would give beam of 200MeV/c in MICE absorber 6mm emittance in first tracker Data MC y (mm) vs x (mm) x (mrad) vs x (mm)y (mrad) vs y (mm)

17 MICE STEP I Superb data taking end 2009 and summer 2010! GOALS ACHIEVED See presentation by M. Rayner at FAC in Jan 2011 Rates limited by beam loss induced in ISIS.

18 -- required muon rate is ~50/200 per pulse without (stepI-IV)/with (StepV-VI) RF -- limitation is irradiation in ISIS due to beam losses induced by MICE target measured in Volts on Beam Line Monitors -- observed rates in MICE 2010 (6mm beam) 5 TOF1/ms/V_BLM for  - beam, 30 TOF1/ms/V_BLM for  + beam following a series of dedicated irradiation runs and measurements of activation ISIS allowed us to run routinely at 2V and even tried up to 10V. We are within range for STEPS I-IV, routinely running with 150 pions or 50 muons per pulse further studies on how to get more muons per losses are ongoing (beam bump, timing, faster dip, etc..) muon rates

supports No support inside magnet independent of magnet shape FIELD MAPPING UNIGE + CERN F. Bergsma, P.-A. Giudici Revolving disc step size 5 degree

5 m 2 m 400 mm cradles Cradles need rectification

22 ISIS running Typical year consists of 5 ISIS ‘user runs’ of ~35 days each + run-ups, MP. 5 more periods April 2013 to April 2014 additional step IV running + Step V installation (priority) Next Long Shut Down envisaged: Aug to February 2015 full EMR run LiH wedge + reserve Step IV Installation + Field mapping Step IV: empty/LH2/(LHe) no absorber flat LiH New target, Step I Maybe some step IV

Estimated visits in 2012  April 2013 for UNIGE + CERN Run in February-March 4 people 2 weeks EMR installation May engineer + 2 technicians 1 week physicists 2x4weeks Field mappings 4x 2weeks MOM 4 weeks Running dec April 2013 est 8-12 weeks Spokesperson 15 weeks Total estimate: 58 weeks or days (including CERN field mapping)

Conclusions MICE TNA program has been extremely useful for MICE Beneficiaries have provided : -- 25% of MOM time -- allows smooth presence of DAQ, Online, TOF, KL all critical to the experiment -- so far a significant part of MICE experiment hardware …and results! Upcoming -- MICE EMR (also a prototype for future neutrino detectors) -- Magnetic measurements -- MICE step IV data taking (~1 year starting dec 2012)