DEPFET Workhop, Ringberg, June 2013 1 Ladislav Andricek, MPG Halbleiterlabor Lessons learned from EMCMs assembly status - next steps.

Slides:



Advertisements
Similar presentations
H.-G. Moser Max-Planck-Institut für Physik MPI Semiconductor Laboratory (Halbleiterlabor: HLL) Common project of the: Max-Planck-Institut fuer Physik (Werner.
Advertisements

2nd Open Meeting of the SuperKEKB Collaboration, KEK, March 2009 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Sensor R&D and Prototyping - Status -
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Hybridization studies at Fermilab Prototype detectors –Readout chip mated to sensor –Experiences with both single dies and 4” and 6” wafers using Indium.
Integrated Circuits (ICs)
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
Embedded Pitch Adapters a high-yield interconnection solution for strip sensors M. Ullán, C. Fleta, X. Fernández-Tejero, V. Benítez CNM (Barcelona)
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Status and outlook of the Medipix3 TSV project
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
MonolithIC 3D Inc., Patents Pending MonolithIC 3D ICs RCAT approach 1 MonolithIC 3D Inc., Patents Pending.
Fabian Hügging – University of Bonn – February WP3: Post processing and 3D Interconnection M. Barbero, L. Gonella, F. Hügging, H. Krüger and.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Comparison of various TSV technology
ECFA ILC Workshop, November 2005, ViennaLadislav Andricek, MPI für Physik, HLL DEPFET Project Status - in Summary Technology development thinning technology.
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
MIT Lincoln Laboratory NU Status-1 JAB 11/20/2015 Advanced Photodiode Development 7 April, 2000 James A. Burns ll.mit.edu.
Low Mass Rui de Oliveira (CERN) July
MonolithIC 3D Inc., Patents Pending MonolithIC 3D ICs November MonolithIC 3D Inc., Patents Pending.
LCWS08, Chicago, November 2008 Ladislav Andricek, MPI fuer Physik, HLL 1 DEPFET Active Pixel Sensors - Status and Plans - Ladislav Andricek for the DEPFET.
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
EMCal Sensor Status (* M. Breidenbach*,
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Spanish Linear Collider Meeting, Valencia, December 2012 Ladislav Andricek, MPI für Physik, HLL 1 DEPFET APS for future collider applications -Status and.
Thinning and Interconnection DEPFET Meeting, Valencia, Sept Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups.
7th PXD/SVD Workshop, Prague, January 2015 Rainer Richter, MPG Halbleiterlabor 1 Pilot Run - Status and Plans PXD9-6 Rainer Richter for the MPG Halbleiterlabor.
1 Tests of EMCM Felix Müller on behalf of the MPP / HLL TestCrew (H.-G. Moser, C. Koffmane, M. Valentan) Belle II PXD – ASIC Review October , 2014.
Daniel EsperanteIFIC – 14 Jun 2013 Probe Card prototyping status.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
The medipix3 TSV project
Hybrid Boards for PXD6 5th International Workshop on DEPFET Detectors and Applications Sept Oct Christian Koffmane 1,2 1 Max-Planck-Institut.
PXD ASIC review, October 2014 ASIC Review 1 H-.G. Moser, 18 th B2GM, June 2014 Date and Location MPP, October 27, 10:00 – October 28, 16:00, Room 313 Reviewers:
VXD Workshop, Valencia, Jan Ladislav Andricek, MPG Halbleiterlabor 1 pilot module assembly - lessons learned -
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
Low Mass, Radiation Hard Vertex Detectors R. Lipton, Fermilab Future experiments will require pixelated vertex detectors with radiation hardness superior.
6 th Belle PAC, KEK, February 26 and PXD - EVO, 5/March/2012 Ladislav Andricek, MPI für Physik, HLL 1
Hans-Günther Moser, PXD PXD Summary 1 PXD Sessions: Highlights 1)Sensor production 2) EMCM (& bump bonding) 3)System Simulations 4)Power Supplies and Services.
Jelena Ninković Testing PXD6 - summary and plans Jelena Ninkovic for the HLL team.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Module Assembly - Overview and SWB bumping -
ELECTRICAL MULTI-CHIP MODULE testing status 3 rd Belle II PXD/SVD Workshop and 12 th International Workshop on DEPFET Detectors and Applications Wetzlar,
H.-G. Moser, 6 th PXD/SVD workshop, Pisa, Oct PXD Summary 1 DEPFET Sensors production yield inter-metal insulation EMCM electronic tests ASICs Schedule.
On-Module Interconnection and CNM Projects DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
PXD ASIC Review, July 2015 Ladislav Andricek, MPG Halbleiterlabor Belle II PXD ASIC Review, the 2 nd …….. 1.
SOI for Belle II PXD DEPFET Meeting, Bonn, February Ladislav Andricek, MPI für Physik, HLL  update on thinning  samples for thermal mock-ups 
1 May, 2009 Ladislav Andricek, MPI für Physik, HLL Interconnection Sensor - ASICs SuperBelle (and ILC) Ladder: -: MCM – ASICs in different technologies.
DEPFET workshop, Kloster Seeon, May 2014 Summary 1 Highlights Technical Coordination TB report schedule remarks.
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
DEPFET Workshop, May 2016 Ladislav Andricek, MPG Halbleiterlabor 1 o Documentation o Transition to “Production Mode” o Please update docu and place it.
The STS-module-assembly:
Switcher (SWB) bumping
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Testing PXD6 - testing plans
New Mask and vendor for 3D detectors
Pilot run – matrix measurements after first metal
Thinning and Plans for SuperBelle
The CSOI approach for integrated micro channels
Hybrid Pixel R&D and Interconnect Technologies
ALICE-MFT-WP5-FPC- vidyo
Ladder Assembly All tools and jigs produced Glue dispensing works
The SOI Issue – Material for PXD9
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Report from CNM activities
Lecture #25 OUTLINE Device isolation methods Electrical contacts to Si
LPKF Laser Direct Structuring System
BONDING The construction of any complicated mechanical device requires not only the machining of individual components but also the assembly of components.
Presentation transcript:

DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor Lessons learned from EMCMs assembly status - next steps

DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor A bit of history “test-EMCM-1” »Produce first electrically active modules for system tests »Use “standard” double-Alu system, 5 wafers 1 st batch  ILD: thick LTO, 2µm  Plan to make it on SOI »Less test structures, but 7 EMCMs per wafer »Production on “fast” track on R&D line »Full triple metal (2 Al+1 Cu) immediately »Finished Sept Two test projects “test-ZMI-5” »Optimize double-Alu system »6 wafers with various inter-level dielectrics  low temp. oxide with different thicknesses  new Al 2 O 3 Isolation  … »Many test structures, 2 EMCMs per Wafer »Production on main process line »After double-Alu qualification add Cu layer »Finished double metal (including many tests) Feb. 2013

EMCM-1 results – test structures  1 st lesson EMCM Wafer with 7 modules/wafer Visual inspection: :- 2 wafers show breaks in al1 and obvious problems with co2n etching (2µm ILD!!!)  process dummies :- 3 wafers visually okay Measurements on test structures on these 3 wafers: Cu layer: :- ILD2 integrity (BCB) okay :- contacts to al2 good down 10µm diameter :- comb structures good down to 10 µm gap Al2 layer: :- contact to al1 good down to 5µm diameter, problems start at 3 µm :- test structures show issues with climbing capability al2 over al1  possible discontinuities Al1 layer:- narrow gaps for drain lines  possible shorts Drain lines, al1-al2, narrow gap in al1  shorts DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 3

EMCM results – testing in the device  2 nd Lesson EMCM Wafer with 7 modules/wafer Complex schematic and complex task: :- 14 bump bonded ASICs – power, clock, JTAG, I/O… about different 2000 nets :- test for shorts and breaks  ~100k measurements :- define nets, extract coordinates, layout  schematic, generate test file :- find the right equipment manufacturer (“gray area” between PCB and ASIC testing) :- …. Finally, Feb. 2013: :- ATG, a test equipment manufacturer succeeded to perform the first full tests on the EMCM :- two “flying needles” :- continuity checks: ~10% of the lines have breaks, mostly on not used signal and switcher lines :- shorts between nets: almost all of the nets are shorted via the silicon bulk  diode characteristics DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 4

EMCM results – shorts to substrate EMCM Wafer with 7 modules/wafer DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 5

Summarizing the issue – 3 rd Lesson EMCM Wafer with 7 modules/wafer :- problematic step is the contact etching to 1 st Al :- 1 st ILD is too thick, contact holes too narrow :- while etching the contact holes in 1 st ILD, the base oxide is removed at the edges (only at edges..!!!) :-  short Alu to bulk after 2 nd Al deposition  Schottky contact  diode characteristics 3 µm is to little for 2 µm of ILD thickness (~okay for 1 µm, but should be made safer) DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 6

test-ZMI-5 … and more lessons EMCM Wafer with 7 modules/wafer :- there are no dedicated test structures for this problem!! :- after spotting the problem in test-EMCM-1, spot checks done on all wafers from test-ZMI-5 :- all 6 wafers are good, no shorts to bulk!! :- What is different? :- thinner ILD2 (1µm instead of 2µm)  less over-etching :- base oxide is thicker: 200nm thermal + 400nm low temp. oxide :- lithography on better equipment, better alignment … :- finished, cut, ready for FC … but: … see Christian’s talk :- 4 th lesson: al2 residues when Al2 directly on al1 :- 5 th lesson: possible BCB residues in al2/cu contact, if al1 below :- 6 th lesson: wider BCB frame at laser dicing line :- 7 th lesson: don’t use co1n for the EMCM … ;-) DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 7

EMCM-1 + ZMI-5 + lessons learned = EMCM-2 DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 8 :- 8 wafers, 7 EMCM each :- thick field oxide :- metal 1 (alu) :- interdielectric (1µm oxide) :- via 1 :- metal 2 (alu)  this week :- interdielectric (3 µm BCB) :- via 2 :- metal 3 (4 µm copper) :- solder stop - (3 µm BCB)  2nd week July EMCM-1 stack

DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor EMCM-2 layout changes I – al2 support lines Old: switcher control lines 4µm Al2 gap New: switcher control lines 8µm Al2 gap

DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor EMCM-2 layout changes II – DCD fan-in Old: interleaved Al1/Al2 fanin New DCD fan-in: only al2n lines On top of punch-through Bias structure (-80V)  thicker insulator to Al2 - less crossings - slightly smaller pitch

DEPFET Workhop, Ringberg, June Ladislav Andricek, MPG Halbleiterlabor EMCM-2 layout changes III :- al1/al2/Cu contact yield issues :- 20µm seems to be to small for this topo. Reasons: :- non-optimal BCB lithography :- co2n on top of co3n  stray light possible Changes: :- bigger co3n contacts :- no direct overlay of co3n and co2n :- optimized BCB exp./dev. time for this topo.

EMCM status in summary EMCM Wafer with 7 modules/wafer :- two productions, many technological issues already found and understood :- testing on bare substrate level was real challenge, now under control :- from 10 EMCMs of the ZMI-5 test, 3 are usable and ready for FC :- EMCM-2 batch started, now already at Al2 deposition :- expect to be ready for probe needle testing in ~4 weeks What are the next steps for the 3 EMCMs from ZMI-5? DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 12

EMCM next steps – Flip chip EMCM Wafer with 7 modules/wafer :- FC of DCDs/DHPs/SWB :- original intention was to assemble 3 EMCMs only with one DCD/DHP/SWB branch :- looking at the probe needle results one fully populated EMCM would be possible :- should we go for it?? :- IZM Berlin is prepared to do the FC, as soon as we are ready … :- processing time at IZM 2 weeks :- IZM uses flux and reflow in separate oven, have experience with “our” copper from Bonn DHP/DCD bump adapter assembly DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 13

EMCM next steps – passives, R and C EMCM Wafer with 7 modules/wafer :- ~ decoupling caps, ~ termination resistors :- very small footprint of components (~220µm  )!! :- need for accurate dispensing of very fine solder paste :- placement and soldering of passives :- IZM does not have the equipment for this (dispenser with fine needles) :- can be and will be done at Finetech in Berlin after FC :- actual processing time hard to estimate, first trials to start in parallel to FC DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 14

After the Flip Chip… EMCM Wafer with 7 modules/wafer :- Kapton attachment (soldering) :- Wire Bonding at MPI :- Assembly and test jig (MPI) :- system test and evaluation DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 15 DGND AGND DCD AVDD DCD Amplow

In Summary DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 16 already the production and first needle testing of the EMCMs lead to some changes and improvements  EMCM-2 FC and passives attachment scheduled at IZM and Finetech FC at CNM/VLC still in optimization phase  Daniel’s talk placement of the passives is critical Finetech said, they can do it, remains to be shown Kapton attachment at MPI prepared, ready to start we are bit short on kapton cables, new production is running..

EMCM results – shorts to substrate Oxidize substrate Sputter 1µm 1 st Al DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 17

EMCM results – shorts to substrate Deposited 2 µm ILD Etch contact to 1 st Al DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 18

EMCM results – shorts to substrate EMCM Wafer with 7 modules/wafer Sputter 1µm 2 nd Al Deposit 3µm ILD2 Contact to 2 nd DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 19

EMCM results – shorts to substrate EMCM Wafer with 7 modules/wafer Deposit Cu DEPFET Workhop, Ringberg, June 2013 Ladislav Andricek, MPG Halbleiterlabor 20