September 28, 2015 PUBLIC WORKS 101. sandyspringsga.gov Adopted City Priorities – FY 2016 2.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Public Works: Building Sustainable Communities
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
PUBLIC WORKS DEPARTMENT
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
Transportation System Needs House Transportation Committee Phil Williams, City of Bremerton Ashley Probart, AWC January 25, 2005.
SIXTH ANNUAL AMOTIA CONFERENCE Asset Maintenance in Louisiana Rhett A. Desselle, P.E. 10/03/2014.
City of Modesto FY Proposed Budget Community & Economic Development Proposed Budget Fiscal Year FY Proposed Budget.
Basics of County Offices Highway Department County Officials Academy.
Updating Boulder’s work zone traffic control guidelines Marni Ratzel Bicycle & Pedestrian Transportation Planner GO Boulder/city of Boulder.
Public Works Jack Petkus, Director Informational Overview.
MODULE 2 By Vit Troyan. TRANSPORTATION: Right-of-Way Traffic Operations Street Maintenance One-Call Centers.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
1 6-Year Transportation Improvement Program ( ) Kit Baker, Chair ( Citizen’s Transportation Advisory Committee ) Desiree’ Winkler, P.E. ( Transportation.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Local Programs Update July 24, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Storm Drainage and Street Maintenance and Construction Presentation for the Flooding and Drainage Committee September 28, 2010.
DEPARTMENT OF TRANSPORTATION. Mission Statement Plan, Design, Construct, Operate and Maintain the roadway system under the jurisdiction of Lee County.
General Overview of the Functions and Responsibilities Traffic Engineering & Permits Division.
Building a Traffic Signal and Sign Inventory for the City of Edmond GIS Staff updated traffic feature classes and the related objects based on information.
City of Salem Streets and Bridges 539 miles of paved streets 53 bridges 263 signalized intersections 195 school zone flashers 7,100 street lights 125,000.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
GDOT Maintenance Overview Eric C. Pitts, P.E. State Maintenance Engineer June 28, 2013.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
Trail Funding Sources & General Information
Gated Communities Worksession Board of County Commissioners October 30, 2007.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Traffic Engineering Division Traffic Operations Traffic Administration Construction and maintenance of traffic control devices. Engineering design Signal.
City of Tualatin Capital Improvement Plan Fiscal Years 2013/2014 — 2017/2018.
Operation & Maintenance Budget Public Works Department FY Budget Worksession July 13, 2015.
Condition Assessment & Funding Needs for North Carolina’s Highway System Report to the Joint Legislative Transportation Oversight Committee December 12,
Council Policy Forum Feb. 23, 2015 CAPITAL PLANNING & INFRASTRUCTURE.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
2015 Traffic Signals 101 Topic 2 Agreements. Office of Traffic, Safety, and Technology Agreements Signal Agreements An Agreement is a contract between.
Georgia’s Intelligent Transportation System
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Public Works Department FY Budget Challenges February 16, 2010.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
Regional Transportation Issues Infrastructure Maintenance New Facilities Air Quality Pollution Congestion Freeway System Surface Streets Income.
Public Works Department Operation & Maintenance Budget FY Budget Worksession July 15, 2013.
Cobb County Department of Transportation
Mike McColeman, P.E. Assistant Maintenance Administrator Ohio Department of Transportation Defining Desired Outcomes Defining Desired Outcomes.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
March 21, BUDGET PRESENTATION- ROADS CAPITAL PROJECTS WATER WASTEWATER.
Livingston County Transportation Connectivity Plan Final Report December 2013.
2016 PROPOSED BUDGET: PUBLIC WORKS OCTOBER 06, 2015 STEVE LENISZEWSKI, PE, PUBLIC WORKS DIRECTOR.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
Local Environmental Initiatives & the Economy: Complete Chaos or Opportunity?
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
1 WAKULLA COUNTY TOWN HALL MEETING One Cent Sales Tax Extension May 3, 2016 at 6:00p.m. St. Marks City Hall.
P UBLIC W ORKS D EPARTMENT Total Proposed Budget $52,121,714 Funded Full Time Equivalent Positions (FTEs) = 238 Budget page Budgets shown in Millions.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
Region’s Core Services 202/17/2014 Integrity ∙ Excellence ∙ Respect Provide leadership, administrative support, procurement and budgetary and financial.
FLORIDA DEPARTMENT OF TRANSPORTATION MAINTENANCE RATING PROGRAM.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
1. Accurate & Timely intelligence shared by all 2. Effective tactics and strategies 3. Rapid deployment of resources 4. Relentless follow-up and assessment.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Pedestrian Facility Improvement Program
Citizens Academy 2016 Public Works and RTS.
Transportation Engineering Business Development Workshop Department M
MnDOT Budget Overview House Transportation Finance Committee Tracy Hatch Deputy Commissioner Chief Financial Officer / Chief Operating Officer February.
PUBLIC WORKS DEPARTMENT
Department of Public Works FY 2018 Recommended Budget
Capital Improvement Program
City Services overview – Intro to Slow Dialogue session
Dana Heiberg, Senior Planner February 5, 2018
Pavement Performance Measures In Georgia
Carleton College Facilities Management
Presentation transcript:

September 28, 2015 PUBLIC WORKS 101

sandyspringsga.gov Adopted City Priorities – FY

sandyspringsga.gov Public Works Functional Units  Capital Improvement Program (CIP)  Facilities (City owned and leased)  Field Services (Routine maintenance)  Stormwater Services  Transportation/Traffic 3

sandyspringsga.gov Capital Improvement Program Unit Overview  Manage the majority of City’s transportation improvement projects Sidewalks, streetscapes, road improvements, etc. Coordinates with local, regional, and state agencies (GDOT, ARC, SRTA, etc.)  Manage construction activities of CIP  Right-of-way acquisition, abandonments, etc.  Emergency response  Geographic information systems 4

sandyspringsga.gov Facilities Management Overview  Coordinates with property management for leased facilities  Manages City owned properties  Manages various facilities contracts Cleaning, HVAC, and building security  Meeting setup and Audio/Video systems  Coordinates building renovations and upgrades LED lighting upgrade  Recycling program  Energy conservation LED lighting upgrade and motion sensors Utility consumption monitoring 5

sandyspringsga.gov Field Services Unit Overview  Operation “Pave On” resurfacing Manages annual budget allocation as well as GDOT’s Local Maintenance and Improvement Grant (LMIG)  Maintenance of roadways Right-of-way mowing and community appearance Road (pothole patching), sidewalks, and right-of-way drainage repairs Litter removal  Emergency response  On call operations City’s 24-Hr Call Center ( )  Utility coordination/permitting Related to City projects and service permits City does not own any utilities – concerns are addressed with appropriate responsible provider (i.e. AT&T, Georgia Power, Fulton County, City of Atlanta, etc.)  Bridge maintenance 6

sandyspringsga.gov Stormwater Services Unit Overview  Manages stormwater capital and drainage maintenance improvements Structure cleaning/maintenance and replacements  Manages construction activities  Coordinates with local, regional, and state agencies (EPD, EPA, and MNGWPD)  Emergency response  Coordinates MS4 annual permitting Includes inspection of 20% of City’s inventory annually 7

sandyspringsga.gov Traffic/Transportation Unit Overview  Traffic Management Center (TMC) Traffic signal timing and corridor management  Traffic Maintenance program Traffic signals and signs Pavement Markings  Intersection improvement program  Traffic studies and development plan review  Emergency response  Transportation planning Coordinates with stakeholders such as: GRTA, ARC, GDOT, MARTA, North Fulton municipalities, etc. 8

sandyspringsga.gov Public Works Contractors/Service Providers AECOM is responsible for overall departmental management and coordinates the following public works contract services: Field maintenance  Blount Construction Company, Inc. Mowing and litter  Optech Monette, LLC Signs  Optech Monette, LLC Signals  Siemens Tree removal  Richmond, Casey, and Yellow Ribbon Striping  Wildcat Striping and Sealing 9

sandyspringsga.gov Infrastructure facts  Over 300 centerline miles of local roads 9.6 centerline miles of state routes (SR140 and 9) 30.7 centerline miles of interstate (I-285 and GA400)  126 traffic signals  38 CCTV cameras  39 radar feedback signs  18 flashing yellow beacons  14 vehicle approaching beacons  24 school zone beacons  27 miles of fiber optic cable  21 bridges (local streets) 10

sandyspringsga.gov How do I?  Request resurfacing/repaving or report a pothole Contact 24-Hr Call Center (770) Lucity ticket number assigned and routed to Field Services Unit City updates the pavement condition index (PCI) every 3 years Scores (0-100) are generated Goal is an average PCI of 70  Request update on traffic signal timing Contact 24-Hr Call Center (770) Lucity ticket number assigned and routed to Traffic/Transportation Unit for review  Report a street sign down/missing Contact 24-Hr Call Center (770) Lucity ticket number assigned and routed to Traffic/Transportation Unit for review Stop signs are safety priority 11

sandyspringsga.gov How do I? (Continued)  Request traffic calming measures Contact 24-Hr Call Center (770) Lucity ticket number assigned and routed to Traffic/Transportation Unit City has an adopted traffic calming policy Most measures require a 50% cost share and 75% support from homeowners in area of influence  Request review of a drainage problem or sink hole Contact 24-Hr Call Center (770) Lucity ticket number assigned and routed to Stormwater Services Unit Current policy and level of service limits City’s responsibility to infrastructure within the right-of-way or in a specific dedicated easement Staff reviews weekly with management and legal staff for determination 12

sandyspringsga.gov Questions? 13