CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Questionnaire Response
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Rutherford Appleton Laboratory CMS ECAL Split 08/09/04 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
University of Wisconsin
LKr status R. Fantechi.
T1 Electronic status Conclusions Electronics Cards:
Status of the DHCAL DIF Detector InterFace Board
Mini-drawers, FE-ASIC , Integrator
ECAL electronics schedule
4x5 SC array for the test beam in Apr 2007
UK CMS Oversight Committee Mtg
PROGRESS on EE VPTs, Dees D Cockerill
Presentation transcript:

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design and procurement of the VPT HV system Design/procurement of the mechanical structures Electronics systems integration SC and Dee assembly Test beam calibration and analysis

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 2 VPTs VPTs delivered - includes 300 tubes to replace tubes failing magnet tests Remaining 300 replacement tubes expected by end of year ~8500 VPTs now at CERN ~1000 reception tested under HV

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 3 VPT HV distribution system Design in progress at RAL 2 CAEN HV supplies, one for each endcap Interface to PVSS slow controls system Feeds modular units, 12 Supercrystals per pcb Incorporates safety issues, both for personnel and equipment CAEN crates and HV distribution prototype: Q1 2007

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 4 EE integration – cooling blocks Cooling bars All cooling bars delivered to CERN and inspected Total 157 short and 404 long Cooling blocks 2 pre-series completed Pressure tested to 25 bar – OK Vacuum tests with Helium - OK Launch manifold mass production by end of year if tests OK on the 10 cooling blocks for Dee4 First of 2 pre-series EE cooling blocks Detail of the electron beam welding on the manifold lids

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 5 SC assembly 10 recently constructed SCs in their assembly jigs in the crystal palace complete with HV cards and umbilical cables Dee4 14 SCs completed out of 20 Awaiting further EE crystals HV soak tests next step SC assembly rates Target 12/week (300 crystals/VPTs) Experience in SCs assembled/day with a team of 2 people 2 teams planned for SCs fitted with HV cards and umbilicals per person per day 2 people planned for 2007

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 6 Electronics performance on Dee4 4 SCs mounted on Dee4 for noise testsEE readout electronics mounted on Dee4 for noise tests Preliminary results, per channel SC e- SC e- SC e- SC e- Crosstalk <0.1% These meet the EE requirements SC6 as close to final as possible

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 7 EE Supercrystal readout SC HV cards 70 of 100 pre-production cards installed in SCs for Dee4 Contract for mass production of 3100 cards imminent (Elfab, Switzerland) HV card tester2 systems being prepared at Bristol One for company, one for tests on receipt at CERN Umbilicals Production in house at CERN Assembly started

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 8 EE front end readout EE Motherboards Production contract imminent (Ascom, paid by ETH-Zurich) 25 pre-series for Dee4 by Mid Jan production cards by ~ end April 2007 EE VFE cards 2130 produced, final 1000 end Nov Awaiting VFE housings (imminent) for burn-in tests at Lyon EE FE cards All 800 FE boards delivered from Hitachi 600 burnt-in at PSI, only 2 failures 400 boards validated at LLR Project finished by end of the year/early 2007 Polyethylene moderator Under production at Energia (Moscow) Delivery for all 4 Dees in Q1 2007

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 9 Motherboard wiring - Trigger tester Status of trigger tester Close to checking data versus SC position on Dee Rationalise system, Labview and ECAL DAQ onto one PC Bristol and University of Virginia Configurable test patterns Corresponding signals seen out of SC Top left – a 2x2 sub array not wired up completely

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 10 EE Planning Possible actions to increase throughput, using skill base from barrel assembly: Dee33 shifts per 2 days for electronics and digital, fibre optic, readout Dee42 shifts per day for electronics and digital, fibre optic, readout Dee4 benefits from the 20 SCs (500 crystals) already assigned in 2006

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 11 EE Risks Insufficient ECAL effort (ED/ID) Continually monitored Resources to be sought firstly from elsewhere in CMS EE/ECAL CERN VPT to crystal gluing now part of their programme Russia SC assembly started this year, commitments for 2007 UVa Offers of help for SC assembly in 2007 Redesign of ECAL electronics Production of EE VFE and EE FE nearly complete Fraction of VPTs fail specifications Replacements sent from production company ECAL crystal production Remains critical path item

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 12 EE Status - Conclusions Good progress with VPT production SC assembly Electronics Cooling infrastructure Dee4 assembly preparation EE programme constrained by crystal delivery

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 13 Additional info follows, next slide

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 14 Additional info follows, next slide Remaining procurements/spend for EE UK project (>£50k): ComponentFY 2006/7 (£k) FY 2007/8 (£k) SC HV cards1010 SC umbilicals1130 SC and Dee assembly staff37315 Electronics cooling on the backplate1810 Assembly – OPAL frames076 VFE/LV housings5012 Mechatronics (mechanical/electrical interfaces)14030 Total622433

CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 15 The CMS Electromagnetic Calorimeter Barrel: 36 Supermodules (18 per half-barrel) Crystals Total mass 67.4 t Tapered crystals Pointing ~ 3 o from vertex Endcaps: 4 Dees (2 per endcap) Crystals Total mass 22.9 t