All Experimenters’ Meeting November 4, 2013. Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.

Slides:



Advertisements
Similar presentations
Red: Berm PipeYellow: G2 Vac pump St.Blue: G2 EnclosureGreen: Bermpipe Flange Vacuum Issue Feb 1stMarch 1stApril 1stMay 1stJune 1st Michael Geelhoed 2/20/12.
Advertisements

July 01, Shutdown Machine Status:  NTF Treatments and Dosimetry as scheduled  Proton Source Commissioning and Studies RFQ Injector.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
NuMI Magnets or What to look for in a gift magnet’s mouth David Harding 3 November 2008.
NuMI DOE Review May 25, 2004 Commissioning Page 1 NuMI Commissioning Overview CD-4 Goals Planning Pre-commissioning activities Commissioning Summary.
MCTF C. Johnstone All Exp. Meeting 14 Mar First Beam to Muon Test Area Description and commissioning of beam to MTA Experimental Hall C. Johnstone,
F All Experimenters' Mtg - 9 Jun 03 Week in Review: 06/02/03 –06/09/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Maintenance and Accelerator Support RHIC Start Up 12.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Sept. 18 th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Pat.
May 06, 2013 Photo by Greg Vogel. Thursday, April 18, some tunnel work had to be suspended and many planned jobs had to be postponed due to the flooding.
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
F All Experimenters' Mtg - 03 Mar 03 Week in Review: 02/24/03 –03/02/03 Ron Moore – FNAL Store Summary / What went wrong Tev Studies Highlights Tev Ground.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
F All Experimenters' Mtg - 27 Jan 03 Week in Review: 01/20/03 -01/26/03 Ron Moore – FNAL Found obstacle in AP-1 line Replacing corroded Tevatron dipole.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Accelerator Status and Plans
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
SY120 to the Meson Test Facility (and KTeV?) - Chuck Brown – 23Feb04 – June/08 P2 P1 MI52 MCenter MTest 3 km beam line from MI52 to MT6 and MC7 2.5 km.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
2/17/2016 Recycler -Gattuso Recycler Shut Down Status  Flying Wire Status  Wire Vacuum Certified  Tunnel Bake Prep status Disconnection of BPM, Correctors,
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
March 4, 2013 Photo by Martin Murphy. Shutdown 2012 Machine Status: Linac running with NTF Treatments, RFQ and Linac commissioning Booster beam commissioning.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Accelerator Support and Maintenance Startup for Run 13.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Muon Long Term Schedule August 15, µ Points to discuss What is the schedule What is the schedule Shutdown schedules Shutdown schedules How do we.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
MI/RR Status January 3, 2014 D. Capista. MI Preformance.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Shutdown Update Switchyard - Neutrino Muon MTest - MCenter Michael Geelhoed 2/22/13.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Maximum Credible Beam Event Paul Emma et al
Presentation transcript:

All Experimenters’ Meeting November 4, 2013

Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB Weekly Integrated Intensity 2.98 E18 protons NMuon Weekly Integrated Intensity 0.0 protons MTest Weekly Integrated Intensity 6.11 E14 protons Beam Hours To NuMI hours Beam Hours To BNB hours Beam Hours To MTest hours From : October 28, 2013 (0000 hours) To: November 4, 2013 (0000 hours)

Status /Work Completed/Plans Proton Source – Linac ESS ground fault – BRF19 HV junction box arching (Access) – Protons/Hour up to 9.3e16 Main Injector – Tuesday: Ground Fault MI10 quad bus MI30 : Tech received minor shock to hand – Decommissioned MI damper cable Remained off until Wed. evening to inspect bus in operational enclosures Recycler – Beam pipe 215 & 309 Aperture improved in both locations Lifetime 200 turns – 309 shows evidence of restriction 2 day access to investigate BNB – Tuning NuMI – Tuning

Status /Work Completed/Plans Switchyard – Retuned extraction and beamline 90% to absorber MTest – Tuning NMuon – ORC for SeaQuest signed – NM1 polarity checks done – Vacuum Leak on clamp in G2 – Attempting to fix in place today G2 120 RP failing – Replacement started today NM1 RP & Blower – Will be replaced with A0 RP & Blower 2 Berm pipe flange leaks – Both being reworked and cleaned today

Schedules and Links: Schedule can be accessed from the Operations Home Page – - Schedules -> Operations ScheduleOperations Schedule Direct link to schedule – -