3 Recycler Status Injected 6 Booster batches and cleanly transferred to MI Slip Stacked 2 Booster batched and transferred to MI Calibrated tune, chromaticity, tune intensity offsets, and injection closure Commissioned LLRF and HLRF Commissioned available instrumentation Many aperture scans

4 MI Operating point Change (SY120) Design Current  This change requires a retune of MI and Switchyard  Currently we do not have instrumentation to measure extraction efficiency from MI to the P1 line  The first instrumentation that can see the extracted beam is at F49

5 Operating Point Chance to RR Energy  A RF frequency change of -1Khz (or ~ -19Mev)  Will shift the tunes by ~ +.06 (currently the base tune is.38h.34v)  Change will require a retune of Booster, MI8, MI, RR, and BooNE

6 Recycler Beam Scrubbing So far Vacuum has recovered Concerns of depleting TSPs, some vacuums sectors only have ~15 fires left

7 RR MI30 Lambertson Circulating Extracted Need to replace the Lambertson flanges and beam box to increase circulating aperture Lambertson PS need to support ~ 750A Need a different power supply Need more cable or need to ramp PS

8 Tunnel Access (next) MI Vacuum at MI605 Recycler Vertical IPM installation Alignment Inspections for future jobs Everything else