Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.

Slides:



Advertisements
Similar presentations
CLIENT CLIENT CONCEPT CONSTRUCTION CONSUMPTION MULTI STOREY BUILDING NORDEUROPE BANK CLIENT: UCN CONSULTANCE: ARHONA Aps ARHONA APS Oana Georgeta Popa.
Advertisements

Structural Steel Construction
Gantt Chart.
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Roofs and Ceilings Revit® Architecture C H A P T E R OBJECTIVES Learn how to place a Roof by Footprint. Learn how to make a wall meet a roof. Learn.
Gravity Force Resisting Systems
Service Technician Training
ICRA Panel System Installation Instructions
Digital Installation - 1 Modern Communication & Broadcast System (MCBS) - 60cms Prepared By Checked ByApproved ByCirculated By Mr. Ashok Dubey Mr. Sanjib.
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
The Lisa San Francisco Assembly Instruction By Laser Dollhouse Designs.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
Cartesian Coordinate System Mathematics often display relations by using a grid system called the Cartesian Coordinate System.
ARCHITECTURAL DESIGN STUDIO I ARCH 201
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
ASSIGNMENT Begin on page 197 “The Foundation”.
/graphing.html Video Watching Behavior: Feet in front of you on floor, voice level 0, you will take notes during this video,
Garden Sheds. Agenda Overview – Next level – good example to teach construction skills – Includes layout skills – transferable to other projects – Orientation.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Current Floor Plan N. Marking C1 indicates that a load bearing steal beam is present at each end of the existing exterior wall which both need to stay.
PAVSYS PAVSYS ™ PAVSYS PAVSYS MODULAR ENGINEERED SUSTAINABLE HABITATS.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Overview Identify the unique construction factors of single-family dwellings. Recognize the.
MODULE 6: PRIVATE DWELLING SIMULATIONS. OBJECTIVES Module 6 Identify the unique construction factors of single-family dwellings. Recognize the basic problems.
Mechanics of Materials. To determine the loading on a body Draw a free body diagram indicating – external loads and moments – reaction loads and moments.
St4 Prop Tube Mapping 05/15/2011 Ming Liu This is a mapping diagram for St-4 prop tubes Facing a module/FEM: – ECL Channels counted from right (1) – to.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Flying Wire Update Feb 4, TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Access for All – The WMI Elevator Project What started as a dream several years ago is now becoming a reality. By the fall of 2010, the WMI will have a.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Chapter 15 Designing Elevations Height measurements Found on elevations not on floor plans Three main horizontal lines Ground Eave Ridge Overhang Protects.
Perspective Drawing for Technical Illustration References: 11, 2, 323.
The Little Ann Assembly Instruction By Laser Dollhouse Designs.
Jean-Christophe Gayde CERN-EST/SUEDMS Id: Juin 2003 ATLAS TILE CALORIMETER PRE-ASSEMBLY SURVEY DATA ANALYSIS CO-ORDINATE SYSTEM DEFINITION 11.
The Glenrose assembly Instructions By Laser Dollhouse Designs.
STATIC AND MODAL BEHAVIOUR OF THE CLIC MAIN BEAM BPM SUPPORT M. Esposito, EN-MME The research leading to these results has received funding from the European.
House Construction.
MiTek Whole House software Goal: “To be able to detail and design all the timber and ancillary steel components of a building within a single product”
9.3 Similar Right Triangles. Do Now: Draw the altitude and describe what it is.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
Dry Wall Installation Copyright © Texas Education Agency, All rights reserved.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Installs, Dismantles. A. INSTALLS 1. The lower part of Beam should be installed by 2 Supports, which are proved safely. - Support should be maintained.
APPLICATIONS OF TECHNOLOGY
Assembly Guide.
LBNF CAD models, Drawings and Component list
Neutrino v2.1 structural assessment
Interior Design Floor Plans And Elevations.
INSTALLATION SEQUENCE
LCD Splicing Screens Wall-mounted Guide
Objective 6.02 part 1: Recognize components of construction
Module 6 Antenna Assembly and Look up Angles
DrawING exterior elevations
'. \s\s I. '.. '... · \ \ \,, I.
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
HME, Incorporated 1871 Cab Integrity.
The Garage Assembly Instruction By Laser Dollhouse Designs
Concrete A structural material made by combining cement, sand, aggregate, and water.
Symbols for the Type of Welds.
' '· \ ·' ,,,,
Objective - To graph ordered pairs.
Required tools for installation of a V-1020C speaker with V-9914 bridge.
Similar Right Triangles
Objective 6.01 Mid 20th Century to Present
The Outwood Grange Family of Schools
Presentation transcript:

Neutrino 1 Assembly Process

Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked

Neutrino 3 Assembly Process Step 2: Floor grid screwed to I Beams Nota: 1.Need of additional feet under floor grid 2.Internal skin of SS pre-assembled on the grids?

Neutrino 4 Assembly Process Step 3: 1st vertical beam, position measured, and maintained by specific tool

Neutrino 5 Assembly Process Step 4: 2nd vertical beam, position measured, and maintained by specific tool

Neutrino 6 Assembly Process Step 5: Horizontal roof beam, position of module measured, and maintained by specific tool

Neutrino 7 Assembly Process Step 6: Small wall, 1st vertical beam, position measured, and maintained by specific tool

Neutrino 8 Assembly Process Step 7: Small wall, 1st vertical beam linked to 1st module, module assembly maintained by specific tool

Neutrino 9 Assembly Process Step 8: Small wall, Horizontal beams and grid installation, module assembly and horizontal beams maintained by specific tool

Neutrino 10 Assembly Process Step 9: Small wall, 2nd vertical beams, position measured, and maintained by specific tool

Neutrino 11 Assembly Process Step 10: Small wall, 2st vertical beams linked to 1st module, module assembly maintained by specific tool

Neutrino 12 Assembly Process Step 11: Small wall, Grid installation, module assembly maintained by specific tool

Neutrino 13 Assembly Process Step 12: Small wall 1 completed, module assembly maintained by specific tool

Neutrino 14 Assembly Process Step 13: Link small wall 1 to 1st module completed, module assembly maintained by specific tool

Neutrino 15 Assembly Process Step 14: Horizontal beams and grid installation for linking module 2, module assembly 1 and horizontal beams maintained by specific tool

Neutrino 16 Assembly Process Step 15: Vertical beams for module 2, positionned and maintained by module 1

Neutrino 17 Assembly Process Step 16: Horizontal roof beam for module 2, positionned and maintained by module 1

Neutrino 18 Assembly Process Step 17: Horizontal beams and grid installation for linking module 3

Neutrino 19 Assembly Process Step 18: Module 3 beams

Neutrino 20 Assembly Process Step 19: Module 3 grid

Neutrino 21 Assembly Process Step 20: All modules installed

Neutrino 22 Assembly Process Step 21: Last small wall, Vertical beams installation

Neutrino 23 Assembly Process Step 22: Last small wall, Horizontal beams installation

Neutrino 24 Assembly Process Step 23: Last small wall, Grid installation Nota: If internal skin of SS pre-assembled on the grids, is it possible to insert last grids?