1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage.

Slides:



Advertisements
Similar presentations
STRATEGIC FACILITIES MASTER PLAN for Village of Holmen, WI BRIEF OVERVIEW.
Advertisements

The Committee and Research – Where are we and where might we be going?
AG BUILDING CONSTRUCTION. Unskilled / Semi-skilled Labor Skilled Trade / Craftsman Technicians Design & Management.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Comparative Analysis Two Potential Sites for a New High School.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Update on FCPS Construction/Renovation Projects August 2009.
1 Analysis of a Large On-Farm Grain Storage & Handling Facility By: Jeffrey Berg, ARA, ASA, MRICS.
2008 Bond Program Implementation | Rock Creek Campus opsis architecture LLP Portland Community College | Rock Creek Campus opsis architecture Portland.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Civil Engineering & Architecture 2.3 Residential Design.
Ector County Courthouse Needs Assessment Study Status Report Brinkley Sargent Architects Greg Read Gina Irwin January 12, 2015.
Amateur Sports Development at Bojangles Coliseum & Ovens Auditorium June 5, 2014 Economic Development & Global Competitiveness Committee.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Energy, Environment and Buildings B FLOATING STUDENT RESIDENCE Evelyne Hornblower Yan Claprood April 2005.
Constructing Structures
Proposed Budget Presentation APRIL 21, 2015.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
 WHAT THE TASK FORCE COMMITTEE DID ?  WHY DOES ANDOVER NEED A NEW TOWN YARD?  WHAT ARE THE COST IMPACTS OF NOT DOING ANYTHING?  WHAT ARE THE BENEFITS.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Albemarle County Public Schools Design for Vehicle Maintenance Facility Improvements September 10, 2009 R A N C O R N W I L D M A N A r c h i t e c t s.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Mt. Lebanon Public Works Facility Master Planning March 11, 2014 Update.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
EDAD 537, Seminar in Public School Finance (4 cr.) Summer 2013.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
P ILLARS C AMPAIGN Positioning Ourselves For The Future.
Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
City of Marshall Development Proposal to Ralco Nutrition, Inc. August 7, 2012.
Hogan Residence Basement Bath Addition Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition Upstairs Bathroom Remodel.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
Public Works/City Hall City Council Workshop Monday, December 23 rd 5:30 p.m. 1.
Organize Project Team 1 Project is to build Crew Boat facility on Lake Washington Construction Management involves working in teams to meet owner requirements.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
1.  Quick Overview of the History and Need  What is Planned for the Fire Department  What is Planned for the Police Department  Financial Details.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
IET 120 Project #4 Matthew Porter Construction Project.
Public Safety Facilities Plan. Goal Make Recommendations to the BOS regarding the location of Public Safety Facilities This is a 50 year decision – Plan.
Infrastructure Revitalization Project
Foundations of Technology Construction
Major Steps In Building a SFR
MAPLE RUN UNIFIED SCHOOL DISTRICT Building Purchase
Site Analysis ID 240 Spring
Commercial Building Project Portfolio
FLOATING STUDENT RESIDENCE
Huntsville City Schools Huntsville High School Softball
UNION GROVE ELEMENTARY REFERENDUM
John Wood John Reed Mark Purple (Town Admin)
Town of Newbury Proposed New Fire Station
INDUSTRIAL / COMMERCIAL Facility For Lease
How & When to Get Permits for Work in Your Home
House Construction Budget Plan
Project S.O.A.R December 10, 2018 Meeting
Financial Considerations
Foundations of Technology Construction
Presentation transcript:

1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage

2 Potential Plan Overview u Facility History u Proposed Construction u Construction Costs u Financial Implications

3 Taghkanic Highway Department Existing Facility u Original land was transferred to the Town in early 1950’s, with the building being built shortly thereafter. (>50 years old), Now Approx. 2 acres u Current location is centrally located within the Town of Taghkanic. u Garage building has remained relatively unchanged for over thirty 30 years u All highway operations are performed from the current site. u Existing facility consists of the main garage facility (2000 sf), vehicle storage, on-site material storage and petroleum storage.

4

5

6

7

8

9

10

11 Highway Facility Options u THREE OPTIONS CONSIDERED BY THE TOWN u Stay in Existing Site uRenovate, expand existing facility uRaze existing building and build new facility uBuild new sand/salt storage facility u Construct a new facility new location uPurchase property uBuilding new facility uBuilding new sand/salt storage facility u Do Nothing

12 Stay at Existing Site and Renovate u Renovate existing building to improve working conditions, add additional space for vehicles and equipment, improve the exterior appearance. u Expand onto the rear of the existing building with a 2000 sf addition u Add one new additional garage bay (Approx. 1,300 S.F) at the existing facility located south of the building. u Install new sloped roof, and exterior siding to improve exterior appearance. u Repair/renovate existing building, including: new bathroom, Roof insulation, wall insulation. u Construct new 3,200 S.F. salt storage building. u Improve site stormwater management, and increase landscaping

Existing Site with Renovation 13

14

15 Stay at Existing Site and Build New Facility u Raze existing garage building facility u Relocate and reuse existing petroleum storage tanks. u Build new utility infrastructure for new garage (water, electrical service, septic system) u Build brand new garage building consisting of approximately 9,000 sf pre-engineered metal building, concrete slab, elect, heating, plumbing, etc. u Construct new stormwater management facilities. u Construct new 3,200 S.F. salt/sand storage building.

Existing Site with New Building 16

17 Construct New Facility at New Location u Locating, evaluating and purchasing property for new location. uTown has performed an outreach campaign regarding potential locations (+/- 25 properties). uTown has visited site and evaluated potential sites. u Construct new Highway Facility Garage. u Construct New Sand/Salt building. u Clean-up and potentially sell existing facility

Property Locations Evaluated 18

19 Sand/Salt Building Options u THREE OPTIONS CONSIDERED BY THE TOWN u Concrete and Wood Structure ($$$) uCast in place concrete walls with foundation uWood Post structure with wood trusses, and metal roof uAsphalt floor and exterior mixing pad u All Wood structure ($$) uWood post structure set on Concrete piers uWood Trusses, wood siding on sidewalls uAsphalt floor and exterior mixing pad u Canvas Structure ($) uCanvas cover on galv. Steel roof frame uPre-cast concrete block sidewalls uAsphalt floor and exterior mixing pad

Fabric Structure 20

All Wood Structure 21

Wood Structure on Concrete Walls 22

23 Potential Course of Action and Improvements u Stay at the existing site uHousekeeping of existing site uComply with NYSDEC requirements for soils issues uPerform Monroe Balancing of Interest Test uRenovate, upgrade and expand on existing building uApproach County regarding reconfiguration of County Route 27 and Pumpkin Hollow Road uConstruct fabric salt storage facility uInstall stormwater management system, and landscaping uContinue to utilize the existing storage shed

Preliminary Construction Costs 24

25 Fiscal Impact

Next Steps to Consider n Complete Phase 2 – Pollution Testing –Do additional testing in positive result area –Develop a Remediation Action Plan –Establish final pollution remediation costs –Establish impact on what can / cannot be done with the current site n Site Decision: –Eliminate all unsuitable sites –If there is an alternative site, establish scope and cost of a new facility n Compare costs of existing site upgrade + Salt Shed and new facility n Decide on site for Highway Facility n Establish several building scenarios and cost impact on budget and taxes –If the life of a Pole Barn Salt Shed costs less that the likelihood of two fabric sheds for the same period, perhaps it is better for the town to invest in the Pole Barn now – the immediate least cost solution is not always the best one in the long run. –If using current site, does it make sense to put up the extra bay on the existing building now? 26