Astro-E2 X-ray Imaging Spectrometer Status, Performance and Calibration Astro-E2 Users’ Group 14 February 2005 Mark Bautz, MIT CSR.

Slides:



Advertisements
Similar presentations
X-ray Astronomy with High Spectral Resolution: Astro-E2 / ISAS Y. Tanaka.
Advertisements

X-ray Imaging Spectrometers (XIS) of Astro-E2 Hironori Matsumoto (Kyoto University) and the XIS team 1. Overview Astro-E2 is the fifth Japanese X-ray Astronomy.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
CHARGE COUPLING TRUE CDS PIXEL PROCESSING True CDS CMOS pixel noise data 2.8 e- CMOS photon transfer.
Astro-E2 and Japanese future space programs for high energy astrophysics Astro-E2 NeXT XEUS Small satellite programs Tadayasu Dotani (ISAS)
July 7-11, 2008 Radio Galaxies in the Chandra Era 1 Hard X-ray study of lobes of radio galaxy Fornax A Naoki Isobe (RIKEN/Suzaku Help Desk) Makoto Tashiro,
Standalone VeloPix Simulation Jianchun Wang 4/30/10.
Some Chandra Basics. Chandra X-Ray Observatory.
CXC Chandra X-ray Observatory Operations. CXC Overview 1. Mission and Observatory Description 2. Chandra Operations 3. Chandra X-ray Center Architecture.
06/02/2008CCDs1 Charge Coupled Device M.Umar Javed M.Umar Javed.
Suzaku XIS cal status XIS system Spaced-row Charge Injection (SCI) Contamination Hironori Matsumoto (Kyoto Univ.) Eric Miller (MIT)
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Nov ACIS Calibration: Planned Updates & Future Issues 2.ACIS Operations: Controlling the.
Chandra X-ray Center Martin Elvis Smithsonian Astrophysical Observatory Welcome to the 4 th Chandra – CIAO Workshop 20 – 22 May 2002.
Chandra X-Ray Observatory CXC Paul Plucinsky February A Comparison of Spectral Fit Results of E0102 from the Chandra and XMM CCDs Paul Plucinsky.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal October Comparison of RGS Model for 1E to the HETG data 2.BI CCD CTI Correction.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
SDW2005, juin, Taormina The Corot Space instrument.
1D or 2D array of photosensors can record optical images projected onto it by lens system. Individual photosensor in an imaging array is called pixel.
Charge-Coupled Device (CCD)
Overview of Scientific Imaging using CCD Arrays Jaal Ghandhi Mechanical Engineering Univ. of Wisconsin-Madison.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
EPIC Calibration Meeting, Mallorca Origin of gain offsets K. Dennerl, 2008 April 8 Origin of gain offsets: new insights from eROSITA calibration Mallorca,
The first year result of MAXI/SSC Masashi Kimura, Hiroshi Tsunemi, Hiroki Kitayama (Osaka Univ.) Hiroshi Tomida, Masaru Matsuoka (JAXA) Arata Daikyuji.
SXT Soft X-Ray Telescope Onboard the Yohkoh Satellite SXT.ppt.
1 Korean Activities in IR Space Missions - Past, Current and Future - Woong-Seob Jeong 1 on behalf of Korean Infrared Astronomy Group 1 KASI, Korea Ramada.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
NASSP Masters 5003F - Computational Astronomy Lecture 19 EPIC background Event lists and selection The RGA Calibration quantities Exposure calculations.
XIS Calibration on the Ground Status Report K. Hayashida (Osaka University) and the XIS-team.
XIS FM sensors cal. report Hiroshi Nakajima XIS
Development of CCDs and Relevant Electronics for the X-ray CCD camera of the MAXI Experiment onboard the International Space Station Osaka University E.
CCD Detectors CCD=“charge coupled device” Readout method:
Japanese Activity on CCD developments Hiroshi Tsunemi, Osaka university International Workshop High Energy Astrophysics in the Next Decade --- NeXT and.
Suzaku, XMM-Newton and Chandra Observations of the Central Region of M 31 Hiromitsu Takahashi (Hiroshima University, Japan) M. Kokubun, K. Makishima, A.
Space Research Centre EDDICAM Interests in EDDINGTON Professor Alan Wells and Dr Matthew Burleigh Space Research Centre, University of Leicester.
Gamma-Ray Bursts observed with INTEGRAL and XMM- Newton Sinead McGlynn School of Physics University College Dublin.
Orbital Calibration of Suzaku XIS K. Hayashida, K. Torii, N. Anabuki, S. Katsuda, N. Tawa, T. Miyauchi, M. Nagai, K. Hasuike, M. Uchino,M. Namiki, H. Tsunemi.
Geant4 simulation for the study of origins of the background of the X-ray CCD camera onboard the Suzaku satellite ○ Takayasu Anada, Masanobu Ozaki, Tadayasu.
CDE CDR, September 14, 2004 Your Position, Your Name 1 GATS AIM Science Team Meeting January 23-24, 2007 CIPS Calibration Review, Aimee Merkel, Bill McClintock.
The ground calibration of the back- side illuminated CCD camera of XIS onboard Astro-E2 (Suzaku) H. Yamaguchi, H. Nakajima, H. Matsumoto, T. G. Tsuru,
Development of CCDs for the SXI We have developed 2 different types of CCDs for the SXI in parallel.. *Advantage =>They are successfully employed for current.
Observational Astrophysics I
Status of the XIS Orbital Calibration and Softwares K. Hayashida, N. Tawa, M. Nagai, H. Nakajima, M. Uchino, N. Anabuki, S. Katsuda, H. Uchida, H. Tsunemi.
Aug , 2006 KJYAM 慶州 1 Suzaku Observation of Nearby Seyfert 2 Galaxy NGC 4945 Naoki Isobe (RIKEN, Japan) and Suzaku NGC 4945 team.
XIS Calibration at Osaka K. Hayashida, K. Torii, M. Namiki, T. Shiroshoji, M. Shoji, S. Kastuda, H. Tsunemi (Osaka University) T. Kohmura (Kougakuin University)
3/16/04mwb, sek, MIT/CSR MIT XIS Status 16 March 2004 Overview: TCE board rebuild status Back-illuminated CCD performance & status (Slightly) improved.
TIPS - Oct 13, 2005 M. Sirianni Temperature change for ACS CCDs: initial study on scientific performance M. Sirianni, T. Wheeler, C.Cox, M. Mutchler, A.
Chandra X-Ray Observatory CXC Paul Plucinsky IACHEC March Thermal SNR Working Group: Summary Report Paul Plucinsky on behalf of the IACHEC Thermal.
System Performance Metrics and Current Performance Status George Angeli.
SPIE Astronomical Instrumentation June 26, 2008 Physics of reverse annealing in high- resistivity ACIS Chandra CCDs Catherine E. Grant (MIT) Bev LaMarr,
Astronomical Observational Techniques and Instrumentation
in collaboration with Jamie Holder & Vladimir Vassiliev
February 21, 2002TIPS meeting1 "Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." TIPS.
3 May 2007 Suzaku Users mwb MIT/MKI XIS Update Mark Bautz, MIT Kavli Institute XIS-2 Anomaly Contamination.
MPI Semiconductor Laboratory, The XEUS Instrument Working Group, PNSensor The X-ray Evolving-Universe Spectroscopy (XEUS) mission is under study by the.
EPIC Calibration Meeting, Madrid Experience with combined Fe 55 /Vela SNR calibration K. Dennerl, 2010 March 23 Experience with combined Fe 55 / Vela SNR.
The onboard calibration for the spaced-row charge injection of the Suzaku XIS Hideki Uchiyama, Yoshiaki Hyodo, Hiroya Yamaguchi, Hideyuki Mori, Takeshi.
MAXI - Monitor of All-sky X-ray Image Performance of the engineering model of the MAXI/SSC Katayama H. a, Tomida H. a, Matsuoka M. a, Tsunemi H. a,b, Miyata.
Application of a Charge Transfer Model to Space Telescope Data Paul Bristow Dec’03
April 28, 2009 IACHECH. Matsumoto1 Introduction of the Soft X-ray Imager (SXI) on board the Astro-H satellite H. Matsumoto (Kyoto Univ.) on behalf of the.
Development of the Soft X-ray Large solid angle Camera onboard WF-MAXI
X-ray CCD with low noise charge injection.
TEMPO Instrument Update
XIS QE Degradation in Orbit XIS Review2006 Mar 10
Yasuhiro Sugimoto KEK 17 R&D status of FPCCD VTX Yasuhiro Sugimoto KEK 17
EPIC Calibration & Operations Meeting
Energy Response of the X-ray Imaging Spectrometer (XIS) on Suzaku
Overview of the Low Energy Telescope and its Performance in-orbit
Orbital verification of the performance of Suzaku XIS
Presentation transcript:

Astro-E2 X-ray Imaging Spectrometer Status, Performance and Calibration Astro-E2 Users’ Group 14 February 2005 Mark Bautz, MIT CSR

14 February 2005mwb MIT/CSR XIS Team Members (Partial list) Osaka University H. Tsunemi, K. Hayashida, K. Torii, M. Namiki Kyoto University K. Koyama (PI), T. Tsuru, H. Matsumoto ISAS/JAXA T. Dotani, H. Murakami, M. Ozaki Rikkyo University H. Awaki Ehime University S. Kitamoto MIT CSRM. Bautz (MIT PI), S. Kissel, B. LaMarr, G. Prigozhin, G. Ricker, J. Doty, R. Foster MIT Lincoln Lab. B. Burke, J. Gregory, A. Pillsbury

14 February 2005mwb MIT/CSR Astro-E2 at ISAS December, 2003 The XIS at a Glance Four telescope + CCD camera units Effective area: 1500 cm 1 keV (~2x Chandra/ACIS) 600 cm 6 keV (~ XMM/EMOS) 60 cm 0.25 keV Field of view: 18 x 18 arcmin (~Chandra/ACIS-I) Spectral Resolution: Silicon-limited E> 0.7 keV (R~2-10%) ~ keV (x2 < CXO/XMM) Team: ISAS (Digital electronics, integration) Osaka (Door, filter, ground calibration) Kyoto (Ground calibration) MIT (CCD, TEC, analog electronics, ground calibration)

14 February 2005mwb MIT/CSR Astro-E2 Instrument Configuration View from Mirrors

14 February 2005mwb MIT/CSR Key Characteristics: Low noise (1-2 e - RMS) Deep depletion (65  m) Charge injection capability Front- & back-illumination CCDs fabricated at MIT/Lincoln CCD heritage: Chandra, ASCA Components: 4 X-ray photon-counting CCD sensors, Peltier-cooled 2 low-noise front-end electronics sets with thermal controllers Astro-E2 XIS Flight Hardware supplied by MIT

14 February 2005mwb MIT/CSR

14 February 2005mwb MIT/CSR XIS Effective Area Comparison: 1 BI Sensor vs 1 FI Sensor Includes XRT-I area & transmission of all filters Flight Complement: 3 FI + 1 BI

14 February 2005mwb MIT/CSR XIS Spectral Resolution: FI & BI CCDs See also LaMarr et al., poster

14 February 2005mwb MIT/CSR XIS Spectral Resolution Comparison: BI vs FI Simulated Spectra of SNR E Back-illuminated (2.3 c s -1 sensor -1 ) Front-illuminated (1.2 c s -1 sensor -1 ) OVII OVIII NeIX NeX MgXI

14 February 2005mwb MIT/CSR BI CCD Spectral Resolution: XIS, Chandra ACIS & XMM-Newton EPIC-PN Simulated Spectra of SNR E XIS Chandra ACIS-S XMM-Newton EPIC-PN 4.6 c s -1 (4 FI) 6.9 c s -1 (2 FI+2 BI) 3.1 c s c s -1 (EPN) 5.0 c s -1 (2EMOS) ct s -1 keV -1 Energy (keV) ct s -1 keV -1 Note: EPIC MOS Resolution comparable to XIS (but is not a BI CCD)

14 February 2005mwb MIT/CSR Charge Injection: Motivation XRS has month life before cryogen is exhausted XIS CCD performance late in Astro-E2 mission is thus especially important Some radiation damage to XIS is inevitable in the Astro-E2 orbit (600 km, 31 deg) Charge injection capability mitigates radiation damage two ways: *Improves charge transfer efficiency after radiation *Allows better ground calibration and correction for damage effects

14 February 2005mwb MIT/CSR XIS Spectral Resolution after Irradiaton without Charge Injection Prelaunch: FWHM: 132 eV. Post-irradiation (2 yr on-orbit equivalent): Gain shift 1.3%; FWHM: 210 eV Without Charge Injection

14 February 2005mwb MIT/CSR Prelaunch: FWHM: 132 eV. Post-irradiation with charge injection: Gain shift 0.5%; FWHM: 144 eV With Charge Injection XIS Spectral Resolution after Irradiaton with Charge Injection

14 February 2005mwb MIT/CSR Ground Calibration Summary MIT: QE & Spectral Resolution vs position, keV Osaka: QE & Spectral Resolution, keV Kyoto: QE & Spectral Resolution, keV Ehime: Filter Transmission keV; optical Issues: *Low-energy (E < 0.5 keV) QE of BI sensor reference detector calibration, pileup(MIT) source stability (Osaka) *CTI correction in pipeline & response functions

14 February 2005mwb MIT/CSR Original XIS Flight Calibration Plan per H. Matsumoto et al.; revisions pending TargetModeDate (MOL) Exp (ks) Pri.Purpose/Remarks Vega5x51101OBF Check E x51101low-E gain,res., QE CXO reference spectrum P-sum1201 Burst1103? Cas-A5x561.21CTE/gain check (Pri.2: 4 ksec) P-sum x56122 P-sum6122 E x56201low-E CTE, gain, QE (Priority 2: 4 ksec) P-sum6201 5x P-sum62002 Eta Carina5x51-620*1low-E BI QE, gain (N line) Cygnus Loop5x51-610*1low-E BI QE, gain (C line) *Parasitic on science observations

14 February 2005mwb MIT/CSR XIS Status Summary XIS hardware is integrated on spacecraft and ready for launch. All planned ground calibration measurements completed; analysis is in progress and several issues remain open. Calibration products in development; CTI correction remains to be implemented.

14 February 2005mwb MIT/CSR XIS Status Summary XIS hardware is integrated on spacecraft and ready for launch. All planned ground calibration measurements completed; analysis is in progress and several issues remain open. Calibration products in development; CTI correction remains to be implemented. We can’t wait!

14 February 2005mwb MIT/CSR Imaging Array FS AB FS CD Outputs: A B C D ID IG Input Register XIS Charge Injection Structure See posters (Prigozhin et al.) & (LaMarr et al.) MIT Lincoln Lab. CCID41“Fill & Spill” Injection

14 February 2005mwb MIT/CSR XIS Charge Injection Structure See posters (Prigozhin et al.) & (LaMarr et al.) MIT Lincoln Lab CCID41“Fill & Spill” Sequence An input register is added: *Location is “row 1025” *Input diode (ID) & input gate (IG) at “column 0” *Can be clocked to place charge above any/all CCD columns. 2 extra signals required: *ID timing determines columns injected *IG level controls injected charge quantity *Existing serial clocks((3) transfer charge in IR Fill: ID low Q~ IG-S3 Spill: ID high Transfer: Clock S3 & IG with IG-S3 fixed

14 February 2005mwb MIT/CSR Charge injection is programmable. “Grid” program reduces charge transfer losses due to radiation damage: *Charge is injected in each column of every 54th row. *Injected charge (temporarily) fills radiation-induced traps. *Filled traps will not degrade charge transfer inefficiency. *Result is better spectral resolution. Rows filled by charge injection Charge moves down during readout ID/IG Input Register Charge moves right during injection Charge Injection to Improve Charge Transfer