Way Finding Signs and other directional aids that will help lead visitors to a destination, attraction, or amenity within a community or town. Way Finding.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Quick Overview Greenways 70+ miles Estimated 1 million users annually Sidewalks 400+ miles Bike Facilities 25 miles of roadway with striped lanes and sharrows.
LAKE COUNTY TRANSPORATION CONNECTIVITY PROJECT Connecting people with communities and schools; working via safe roads and alternative transportation corridors.
January 6. January 7 January 8 January 9 January 10.
WHANGAREI LOVE IT HERE! Signage Workshop Presented by WDC District Promotions & Tourism and Whangarei Visitor Group 21 October 2014.
Electric-assist bicycle pilot use on multi-use paths City Council Second reading and Public Hearing October 29, 2013.
Manager’s Recommendation FEBRUARY 11, 2015 COUNCIL ROOM.
SR 519 Intermodal Access Project Phase 2: South Atlantic Corridor.
Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Proposed Budget Presentation APRIL 21, 2015.
Proposed Athletic Facility Renovations to East Hartford High School Albert Costa-Director/Facilities 1 Expectations Matter Effort Matters Competence Matters.
Highways & Transportation I (ECIV 4333) Course Outline 1 The Islamic University of Gaza Faculty of Engineering Highways & Transportation I (ECIV 4333)
BLM Recreation Program: Awesome Public Land Linda Anania, Deputy State Director for Resources, Planning & Fire BLM Colorado February 27, 2008.
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAY March 16March 17March 18March 19March 20 Signing up for roles ACT III 1 st period Discussing ideas Planning ACT III.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Global Perspectives on Social Policy: Human Rights, UNCRC and Global Youth work Lecture 3 Wednesday 30 th April.
Transportation Enhancement Funds Workshop April 19, 2004 MAG Saguaro Room.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
Land Use Study for the Community of Winchester July 9, 2012.
International Downtown Association 2013 Downtown Achievement Awards Downtown Transformation Initiative Battle Creek, Michigan.
Massachusetts Avenue Roadway Improvements Board of Selectmen’s Meeting July 13, 2015 TOWN OF LEXINGTON.
Crash Impediments Ordinance Update Orange County BCC September 1, 2015.
New Hanover County 2017 Revaluation Update Roger Kelley Tax Administrator Tax Administration September 14, 2015.
Getting Direction – Map it Out! Today’s Goal: To learn the basics of using a map. This will include learning the definition of a map legend, identifying.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Greenways enhance the visual character and walkability of.
QRTV for UN Regulation GRB 62 Transmitted by IWG QRTV for UN Regulation Informal document GRB (62nd GRB, 1-3 September 2015, agenda item 11)
Sprawling and Planned Communities Produced by Amanda Lawson Delaware Geographic Alliance – University of Delaware With support from Delaware Space Grant.
T.E.E.G.S Transportation, Emergency, and Environmental GIS Services Matt Smith Project Manager Lauren Bender GIS Analyst Amanda Magera GIS Analyst Aaron.
Island Greenway Project MARCH 10, 2015 COUNCIL MEETING.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
OPTN Bylaws Substantive Rewrite of the Bylaws Addressing Review, Actions, and Due Process Sponsored by the Membership and Professional Standards Committee.
Hazard Mitigation Plan An Overview. What is Hazard Mitigation? Action taken to reduce or eliminate long-term risk Long term impact Different from –Preparedness.
FIRST PUBLIC HEARING DONATION BIN ORDINANCE Zoning Division June 3, 2014.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Lina Williams Budget & Financial Analyst Tuesday, July 14 th 2015.
SunSatFriThursWedTuesMon January
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
Bedford County Budget Work Session February 4, 2013.
Community Development Department City Initiated Comprehensive Plan Amendments (CPA) & Zoning Map Amendments Planning & Land Development Regulation Board.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
ATV / UTV Road Usage Survey Results & General Update Bi-Annual Meeting of the Electors – Spring April, 2016.
MOUNTAIN RECREATION FACILITIES MASTER PLAN Mountain Recreation Facilities Master Plan Summit County Council Briefing – June 8, 2016 Project Website:
Small Town Service ~ Community Stewardship ~ Future Focus ALBRIGHT OFFICE PARK Planned Development PD Architecture and Site S Environmental.
April 28, 2015 Measure “C” Citizen Oversight Committee.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
VILLA AMADOR VICINITY MAP. CASE SPECIFICS Subject properties encompass ± acres –Entails 10 parcels of land –Located south of Amador Avenue, west.
Town Road Improvement Project Communication Plan
Canyons Village Management Association Workforce Housing
Respect the Rights of Others
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
Multistory Office Building
Grid Code Review Panel 16th August 2017
Texas Department of Transportation
Transportation Alternatives (TA) Set-aside
Bike Boulevard 4.6 miles of bike lanes, bike dots, shared lane markings and guide signs on collector and local streets. March-April 2012.
Cottage Foods Update, April 2016
2016 AmeriCorps Texas All-Grantee Meeting February 25-26, 2016
All Aboard for Systems.
Granville County Government Budget Calendar
Broadway Plaza Redevelopment
FEMA and Stream Restoration
Meadow Lake Boulevard Street Extension Project
Funding Trail Networks in Maryland
Accreditation Questionnaire Timeline
City of Talent Splash Pad Grand Opening
New Hanover Comprehensive Plan
Complete Vehicle Systems.
Presentation transcript:

Way Finding Signs and other directional aids that will help lead visitors to a destination, attraction, or amenity within a community or town. Way Finding Project Overview1 Boulder Junction Way Finding Project Definition

Vehicle Way Finding Design Concept 4 Signs – Engineering, Design & Permitting $9,500 Cost Estimate Based on Mercer Project Ayers Associates Facilitating Design & Permitting Way Finding Project Overview2

Pedestrian Kiosk Cost Estimate Scope expanded to include fire mitigation (CWPP) – Shared cost by DNR results in local total project cost 3-Display Case Design – Safety / Services / Bike Trail Eight Kiosks – St Germain Design $18,500 Way Finding Project Overview3

Bike Trail Map Sign Cost Estimate 3-Double Sided Structures $2,200 – Musky Cutout – 6mm aluminum panels – Maps with UV-resistant coating Way Finding Project Overview4 Proposed DesignRice Creek Sign

Total Project Cost Estimate Vehicle Way Finding$9,500 Pedestrian Way Finding $18,500 Bike Trail Way Finding $2,200 Less DNR Cost Sharing - $9,000 Total $21,200 Way Finding Project Overview5

Timeline Finalize Design – February 2016 Finalize Cost Estimates – March 2016 Complete Public Hearing – March 2016 Finalize Plan – April 2016 Way Finding Project Overview6 Boulder Junction Way Finding Timeline